My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1325
>
1900 - Hazardous Materials Program
>
PR0543518
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2022 8:40:45 AM
Creation date
7/26/2021 3:28:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0543518
PE
1921
FACILITY_ID
FA0024706
FACILITY_NAME
METAL FINISHING SOLUTIONS - STOCKTON CA
STREET_NUMBER
1325
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
1325 EL PINAL DR STE 1
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Florido,Elianna [EHD] <br /> From: Tony Grizelj <tonyg@JLPrecision.com> <br /> Sent: Wednesday,September 1,2021 9:40 AM <br /> To: Florido, Elianna [EHD];Scott Renfrew <br /> Cc: Rob Ashe;Chad Yelm;Ericson Mercado;Backus,Garrett[EHD];Henry, Michelle D[EHD];Manzo, Elena K.[EHD];Baker, <br /> Lydia[EHD] <br /> Subject: RE:MFS Stockton-Waste Analysis Plan <br /> Attachments: PRO543718-MFS RTC_20210831_signed.pdf; PRO543720-MFS RTC_20210831_signed.pdf <br /> CAUTION:This email is originated from outside of the organization. Do not click links or open attachments unless you recognize the <br /> sender and know the content is safe. <br /> Hi Elianna and all, <br /> Please see the attached response to violations for: <br /> • Haz Mat Program <br /> • Permit by Rule (PBR) <br /> We will submit the Large Quantity Generator response later tonight or by tomorrow at the latest. <br /> Please let us know if you have any questions or would like to schedule a follow up call. <br /> Best regards, <br /> Tony Grizelj <br /> Sr. Vice President-JL Precision,Inc. <br /> 2360 Zanker Road I San Jose,CA 95131 <br /> 2 408-727-6633 Ext.103 1 ® 408-569-5292 1 ll tonvg@ilprecision.com <br /> www.alprecision.com <br /> From: Florido, Elianna [EHD] [mailto:eflorido@sjgov.org] <br /> Sent:Thursday, August 26, 20215:06 PM <br /> To: Scott Renfrew<srenfrew@iesengineering.net> <br /> Cc:Tony Grizelj <tonyg@J LP recision.com>; Rob Ashe<rashe@JLPrecision.com>; Chad Yelm <cyelm@mfinish.com>; <br /> Ericson Mercado<ericson@mfinish.com>; Backus, Garrett [EHD] <gbackus@sjgov.org>; Henry, Michelle D [EHD] <br /> <mhenry@sjgov.org>; Manzo, Elena K. [EHD] <emanzo@sjgov.org>; Baker, Lydia [EHD] <Ibaker@sjgov.org> <br /> Subject: RE: MFS Stockton -Waste Analysis Plan <br /> Hi Scott, <br /> Thank you for your emails following our conference call. <br /> The violation regarding the waste analysis plan states a separate chemical analysis at the point of waste generation <br /> before the wastes enter the treatment system is needed only for rinse tanks 3,4, 6, 7, 9, 10, 11, and for the clean out of <br /> the secondary containment under the processing line.These chemical analyses must demonstrate that the fluoride or <br /> metal content(CAM 17 metals) of the waste streams do not exceed hazardous waste regulatory levels. I will get back to <br /> you shortly on which laboratory analysis methods should be used. <br /> I completed the review of the hazardous waste tank assessment. Please provide the following additional information <br /> and address the following comments: <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.