Laserfiche WebLink
Storm Water Protection Measures shall be implemented at <br />the initial stage of construction a <br />erosion and retain soil runoff on the thro� mall prevent <br />barrier system, wattle or other approved methodthe use of a <br />. <br />\19 <br />_ j"ou\1� _ <br />"T Provide protection from vehicle <br />damage LP -gas container <br />-� 20100 Article 3807 4 <br />S ea.r, o <br />P1-11L- <br />iL PIOeM�F <br />1 / IfiF.c wN.. <br />XI-� <br />�' f�ww <br />Location of new Structures 1` c a�..., qa0 <br />& Driveways to be 5' from <br />wells, 5' from <br />Septic Tanks <br />I <br />V� P,aoios Pa <br />258q <br />Provide drainage away from the building a min. of 6" <br />Of fall for first ld horizontal to an a 76 <br />course. imperviousp�O drainage <br />surfaces shall be sloped a min. 2% <br />away from building pe"2016 CRC Sec, 8401.3 <br />V64' <br />-- -- <br />SECTION R319 <br />SITE ADDRESS <br />