Laserfiche WebLink
.19 Pacific Gas and <br />Electric Company. <br />Description of Anode Bed <br />® Deep Well <br />❑ Shallow Well <br />Request for Anode Replacement <br />Location w�� S ".J � � yn�?'� ACJ, Y lV)U N ret l� <br />CPA Number . 1 _I <br />GD&TS <br />11/2013 <br />FO -13.7-A <br />Anode Type Size Number of Anodes in Last Readings Date <br />(Width and Length, Bed (Voltage/Amperage) <br />Weight if Known) <br />m 40A-4-47-10ao <br />D—n nrinrn Teef Rncultc <br />Initials <br />LAN ID <br />Date <br />Step <br />Grp V <br />_ 1010 <br />1. The CPA is field verified to be clear of contacts. <br />V <br />rn J 1 <br />0 <br />2. The anode wire has been checked for electrical continuity. <br />��� <br />_ <br />3. The rectifier is operating properly (fuses, correct wiring, proper grounding, etc.). <br />4. An interference test has been performed. <br />IG v <br />720 <br />5. An anode bed gas test has been performed. <br />V <br />G>~. <br />_� _ <br />6. All defects detected by the above methods are addressed. <br />Required Attachments <br />® Standard CP Maintenance Forms ® Interference Test Forms ® Rectifier Test Station Reports <br />Reason for Replacement <br />❑ The anode/rectifier system is no longer operational (e.g. - zero current output, broken anode/cathode wire) <br />�] The anode/rectifier system can no longer provide effective levels of cathodic protection (e.g. - interference/overprotection) <br />Additional Comments <,4 -) E(;) -1J q I Z h n n (' I'2 no.o o L,.)n i l_ /4 <br />Recommended Anode Bed Replacement <br />V1 Deep Well Location <br />❑ Shallow Well Location <br />Energy Delivery M&O Distribution Supervisor Review of Anode Bed Replacement <br />❑ Concur Distribution Supervisor <br />Additional Comments <br />LAN ID TXDL Date 7/24/2020 <br />Corrosion Subject Matter Expert (SME) Review of Anode Bed Replacement <br />® Concur Distribution Specialist U)6,6, z% LAN ID RSWJ Date 7/23/2020 <br />Additional Comments <br />Gas Design & Planning Approval/Accounting <br />❑ The anode bed is approved for replacement as recommended. <br />❑ Concur Gas Distribution Engineer <br />Additional Comments <br />LAN ID Date <br />Accounting (Notification Number) Accounting (Order Number) <br />