Laserfiche WebLink
I R20-407 <br /> We are scheduled to perform the test borings on Monday, June 28, 2020 and will conclude <br /> on June 30th. As a result, we would greatly appreciate your assistance in reviewing and <br /> approving the attached no later Monday, June 21st, 2021 so we can properly schedule <br /> mobilization of our personnel and notify representatives of our client and property owner <br /> to be onsite during the drilling operations. <br /> If during your review, you should have any questions or require anything of me, please <br /> do not hesitate to contact me by phone at (949) 681-4268 or via email at <br /> jhaertle(a�leightongroup.com. <br /> I sincerely appreciate your attention to this matter and would like to thank you in advance <br /> for your efforts to assist us in maintaining our schedule. <br /> Respectfully submitted, <br /> LEIGHTON CONSULTING, INC. <br /> John E. Haertle, GE <br /> Associate Engineer <br /> jhaertle(a)lei ghtong rup.com <br /> 949 681-4268 <br /> JEH/Ir <br /> Enclosures: Well/Pump Permit Application <br /> Site Mitigation Well & Boring Permit Application <br /> Licensed Contractor Declaration <br /> Site Plans (2) <br /> Permit Fee <br /> Distribution: (1) Addressee <br /> 2 4i <br /> Leighton <br />