Laserfiche WebLink
REDDING <br /> 530-246-9499 P <br /> 530-246-9527 f <br /> NPE <br /> WEST SACRAMENTO <br /> 916-927-7000 p <br /> MID PACIFIC ENGINEERING, INC. 9t6-372-9900 f <br /> GEOTECHNICAL ENGINEERING I EARTHWORK TESTING I MATERIALS ENGINEERING AND TESTING I SPECIAL INSPECTIONS <br /> Project: Pereira Subdivision July 1, 2021 <br /> Location:2898 North Ripon Road, Ripon Ca 95366 <br /> On July 14, 2021,following permit approval, three 2-inch diameter CPT soundings will be <br /> pushed to a depth of approximately 50 feet below existing site grades to obtain <br /> geotechnical soil data at the location shown on the attached aerial photograph. Upon <br /> completion of CPT soundings,the bore holes will be backfilled with a neat cement grout in <br /> accordance with the San Joaquin Environmental Health Department requirements. <br /> Daniel Rivera, EIT <br /> Senior Staff Engineer <br /> Mid Pacific Engineering, Inc. <br /> 916-927-7000—office <br /> 916-372-9900 —fax <br /> 916-916-662-0909—cell <br /> 6310 STATE HIGHWAY 273,ANDERSON,CALIFORNIA 96007 <br /> 840 EMBARCADERO DRIVE,SUITE 20,WEST SACRAMENTO,CALIFORNIA 95605 <br />