Laserfiche WebLink
20 July 2021 AdvancedGeo <br /> Project No. 21-6486 An Employee-Owned Company <br /> Page 8 of 15 ' <br /> 5.2. SOIL LITHOLOGY AS RELATED TO FUTURE ONSITE SEPTIC USES <br /> The soil was visually described in accordance with the Unified Soil Classification System <br /> (USCS) by a representative of AGI under the supervision of a California Professional <br /> Geologist. The soil collected from the percolation test hole boring consisted of dry silty <br /> sand from surface grade to 42 inches bsg. The soil type is considered semi-permeable <br /> and should be sufficient for liquid waste disposal and treatment. <br /> 6.0. PERCOLATION TEST INFORMATION <br /> A percolation soil suitability test was performed at the site under EHD permit No. <br /> SR0083893 using a four-inch diameter soil boring established to a depth of 42 inches <br /> bsg. A site map showing the approximate location of the percolation test hole is illustrated <br /> in Figure 2. A precise description of the location and construction of the percolation test <br /> hole is included in Appendix D (EHD form 42-03 revised 11/02/2009). The soil suitability <br /> study was conducted within the area of the proposed septic system leach field. <br /> 6.1 . NUMBER OF PERCOLATION TESTS PERFORMED <br /> One shallow percolation test was performed at the site. The appropriate percolation test <br /> procedure established by the EHD was followed for the test (Procedure #3). The <br /> percolation test hole was pre-soaked overnight for 24 hours followed by a one-hour <br /> percolation testing period. <br /> 6.2. CONSTRUCTION OF PERCOLATION TEST HOLE <br /> On 30 June 2021, one boring was advanced for a shallow percolation test. The boring <br /> was advanced using a four-inch diameter hand auger to a depth of 42 inches bsg. <br /> Following borehole advancement, the sides of the boring were scraped, and loose <br /> material was removed from the borehole. Once the borehole was cleared of loose <br /> material, two inches of fine gravel was added to the bottom of the borehole and a two- <br /> inch diameter polyvinyl chloride (PVC) casing with 0.020-inch slots was installed in the <br /> borehole to perform the test. Gravel was added to the annulus of the borehole, between <br /> the borehole and the casing. The borehole was then filled with water to a depth of <br /> 12 inches above the gravel at the time of 0800. The test hole was then covered for <br /> 24 hours to allow for complete saturation of the borehole. <br /> 6.3. DESCRIPTION OF THE PERCOLATION TEST HOLE - POST SOAK <br /> On 01 July 2021, the boring was found to be completely dry, intact and in good condition. <br />