Laserfiche WebLink
INTERNAL FACILITY EMERGENCY COMMUNICATIONS OR ALARM NOTIFICATION WILL OCCUR BY(Check all that apply): CH. <br /> 0 L VERBAL WARNINGS- ❑2.PUBLIC ADDRESS OR INTERCOM SYSTEM; [13.TELEPHONE; <br /> ❑4.PAGERS; ❑5.ALARM SYSTEM; <br /> [16.PORTABLE RADIO <br /> NOTIFICATIONS TO NEIGHBORING FACILITIES THAT MAY BE AFFECTED BY AN OFF-SITE RELEASE WILL OCCUR BY(Check all that apply): ct2- <br /> ❑ 1.VERBAL WARNINGS; ❑2.PUBLIC ADDRESS OR INTERCOM SYSTEM, <br /> El 4.PAGERS: ❑5.ALARM SYSTEM: [3 3.TELEPHU <br /> ❑6.PORTABLE <br /> RADIO <br /> EMERGENCY CORE fNAT(:)R CONTACT INFORMATION: <br /> Rudy Laminero Cl;. <br /> PRIMARY EMERGENCY COORDINATOR NAME: Rudy Laminero PHONE NO.�O��-��_�cJ�43 PHONE NO.: <br /> ALTERNATE EM El' COORDINATOR NAME: Julie Tsutsumi PHONE PHONE NO.: <br /> ❑Check if addir.iuuil Enet'gency Coordinator contact and address information is available onsite or by calling PHONE NO.: <br /> Note:If more tha,.one aitaruaie emergency coordinator is designated,attach a list in order of responsibility. <br /> D. EMERGENCY CONTAINMENT AND CLEANUP PROCEDURES <br /> Check the applic a+le boxes to indicate your facility's procedures for containing spills and preventing and mitigating releases,fires and/or explosions. <br /> _ <br /> Q <br /> __.1. MONITOR FOR La <br /> EKS,RUPTURES,PRESSURE BUILD-UP.ETC.; DI. <br /> ❑2. PROVIDE STRUCTURAL PHYSICAL BARRIERS(e.g.,Portable spill containment walls,built-in berms); <br /> [13. PROVIDE-ABSORBENT PHYSICAL BARRIERS(e.g.,Pacts,spill pigs,spill pillows)., <br /> ❑4. COVER.OR BLOCK FLOOR_AND,,OR STORM DRAINS; <br /> ❑S. LINED TRrNCIT DRAINS AND'OR SUMPS; <br /> ❑6. AUTC)NrA' IC'F`k•E;SUPPRESSION SYSTEM: <br /> n 7. ELIiMTNA SC?T RCES OF IGNITION FOR FLAMMABLE-HAZARDS: <br /> ❑3. STOP PROC'L-SSES AND/OR OPERATIONS. <br /> ❑9. AUTOM,N IC i I[-ECTRONIC EQUIPMENT SHUT-OFF SYSTEM: <br /> ❑ 10.SHUT OFF N .T_R,CTAS,ELECTRICAL UTILITIES: <br /> Q 11.CALL 9-1-1 FOR P:;BLI:'EMERGEXC Y RESPONDER ASSISTANCE AND/OR MEDICAL AID. <br /> 12.NOTIrY,A":D EVACUATE PERSONS IN ALL THREATENED AND/OR IMPACTED AREAS; <br /> 13.ACCOUNT FOR EVACUATED PERSONS IMMEDIATELY AFTER EVACUATION; <br /> ❑ 14.PROVIDE PROTECTIVE EQUIPMENT FOR ON-SITE EMERGENCY RESPONSE TEAM; <br /> Q 15,REMOVE"'O_N'.ATNERS AND/OR ISOLATE AREAS, <br /> El 16.HIRE I-ICF.NSED HAZARDOUS WASTE CONTRACTOR; <br /> ❑ 17.USE ABSORBENT MATERIAL FOR SPILL CONTAINMENT; <br /> ❑ 1 S.VACUUM SUCTION USING APPROPRIATE VACUUM(e.g.,Intrinsically safe)FOR SPILL CONTROL AND/OR CLEANUP; <br /> ❑ 19.DEC(?NT.A.'vIIN.ATE PERSONNEL AND EQUIPMENT WITHIN DESIGNATED AREA AND DISPOSE OF WASTEWATER AS HAZARDOUS WASTE; <br /> []20.PROVIDE:}AFT:TEMPORARY STORAGE OF HAZARDOUS WASTE GENERATED DURING EMERGENCY ACTIONS; <br /> ❑21.OTHER(Specify): D'. <br /> E. FACILITY EVACUATION <br /> THE FOLLOWIiN 3 ALARM STGNAL(S)WILL BE USED TO BEGIN EVACUATION OF THE FACILITY(Check all that apply): El. <br /> ❑ 1. BELLS: E'_. <br /> ❑2. HORNSISIFENS. <br /> Q 3. VERBAL(i.e..Shouting): <br /> ❑4. OTHER tS Ee L;,: <br /> TIS- OLo rr r a a.zn(s Orli IE.Usrrt�t�Aril _ ic�N E;. <br /> Burger King Parl mg L.-)t next door <br /> Note:The Emerao:cy Co-mlioa_tor must account for all onsite employees and visitors after evacuation. <br /> EVACUATION I<OT ITr AND ALTERNATE EVACUATION ROUTES ARE DESCRIBED AS FOLLOWS: E4• <br /> ❑ L WRITTEN T•ROL'FDURES DESCRIBING ROUTES,EXITS,AND ASSEMBLY AREAS; <br /> M 2.EVAC'UAT:JN MAP(S)DEPICTING ROUTES.EXITS.AND ASSEMBLY AREAS; <br /> ❑3. OTHER(Specify): E5. <br /> Note:Evacuation:_roce:::r.;and/Or maps should be posted in visible facility locations and must be included in the Contingency Plan. <br /> F. ARRANGEMENTS FOR EMERGENCY SERVICES <br /> ADVANCE 1.R R_.NG-_;vIENT'3 FOR LOCAL EiVER8ENC'Y SERVICES(Check one of the following): Ft. <br /> F-1 I. HAVE Bc.-.N )rTt•RD1lINED NOT NECESSARY; <br /> E12. THE ARRANGEMENTS HAVE BEEN MADE(Specify): F2. <br /> Note:Advancer ngemteuts with local fire and police departments.hospitals.state and local emergency response teams,and/or emergency services <br /> contractors shoulcs be nia_le for your facility.if necessary. Large Quantity Generators must describe arrangements in the Contingency Plan. <br /> Ree.03/07/17 Page 2 of 4 <br />