Laserfiche WebLink
CERS Consolidated Emergency Response / Contingency Plan <br /> INTERNAL FACILITY EMERGENCY COMMUNICATIONS OR ALARM NOTIFICATION WILL OCCUR BY (Check all that apply): C11. <br /> ® L VERBAL WARNINGS; ® 2. PUBLIC ADDRESS OR INTERCOM SYSTEM; ® 3. TELEPHONE; <br /> ❑ 4. PAGERS; ® 5. ALARM SYSTEM; ® 6. PORTABLE RADIO <br /> NOTIFICATIONS TO NEIGHBORING FACILITIES THAT MAY BE AFFECTED BY AN OFF-SITE RELEASE WILL OCCUR BY (Check all that apply): Clz. <br /> ❑ 1 . VERBAL WARNINGS; ❑ 2. PUBLIC ADDRESS OR INTERCOM SYSTEM; ® 3. TELEPHONE; <br /> ❑ 4. PAGERS; E35, ALARM SYSTEM; ❑ 6. PORTABLE RADIO <br /> EMERGENCY COORDINATOR CONTACT INFORMATION: CI3, <br /> PRIMARY EMERGENCY COORDINATOR NAME: Gabriel Gomez PHONE NO.: (209851 -0649 PHONE NO.: (209444-1709 <br /> ALTERNATE EMERGENCY COORDINATOR NAME: Sandra FregOS0 PHONE NO.: (209992-2957 PHONE NO. : (209)444-1734 <br /> ❑ Check if additional Emergency Coordinator contact and address information is available onsite or by calling PHONE NO.: <br /> Note: If more than one alternate emergency coordinator is designated, attach a list in order of responsibility. <br /> D. EMERGENCY CONTAINMENT AND CLEANUP PROCEDURES <br /> Check the applicable boxes to indicate your facility's procedures for containing spills and preventing and mitigating releases, fires and/or explosions. <br /> D1. <br /> 01 . MONITOR FOR LEAKS, RUPTURES, PRESSURE BUILD-UP, ETC.; <br /> ® 2. PROVIDE STRUCTURAL PHYSICAL BARRIERS (e.g., Portable spill containment walls, built-in berms); <br /> 03. PROVIDE ABSORBENT PHYSICAL BARRIERS (e.g., Pads, spill pigs, spill pillows); <br /> 24. COVER OR BLOCK FLOOR AND/OR STORM DRAINS; <br /> ® 5. LINED TRENCH DRAINS AND/OR SUMPS; <br /> [16. AUTOMATIC FIRE SUPPRESSION SYSTEM; <br /> 27. ELIMINATE SOURCES OF IGNITION FOR FLAMMABLE HAZARDS; <br /> ® 8. STOP PROCESSES AND/OR OPERATIONS; <br /> 09. AUTOMATIC / ELECTRONIC EQUIPMENT SHUT-OFF SYSTEM; <br /> ® 10. SHUT OFF WATER, GAS, ELECTRICAL UTILITIES; <br /> ® 11 . CALL 9-1 -1 FOR PUBLIC EMERGENCY RESPONDER ASSISTANCE AND/OR MEDICAL AID; <br /> ® 12. NOTIFY AND EVACUATE PERSONS IN ALL THREATENED AND/OR IMPACTED AREAS; <br /> ® 13. ACCOUNT FOR EVACUATED PERSONS IMMEDIATELY AFTER EVACUATION; <br /> ® 14. PROVIDE PROTECTIVE EQUIPMENT FOR ON-SITE EMERGENCY RESPONSE TEAM; <br /> ® 15. REMOVE CONTAINERS AND/OR ISOLATE AREAS; <br /> ® 16. HIRE LICENSED HAZARDOUS WASTE CONTRACTOR; <br /> ® 17. USE ABSORBENT MATERIAL FOR SPILL CONTAINMENT; <br /> ❑ 18. VACUUM SUCTION USING APPROPRIATE VACUUM (e.g., Intrinsically safe) FOR SPILL CONTROL AND/OR CLEANUP; <br /> ® 19. DECONTAMINATE PERSONNEL AND EQUIPMENT WITHIN DESIGNATED AREA AND DISPOSE OF WASTEWATER AS HAZARDOUS WASTE; <br /> ® 20. PROVIDE SAFE TEMPORARY STORAGE OF HAZARDOUS WASTE GENERATED DURING EMERGENCY ACTIONS; <br /> D2. <br /> ❑ 21 . OTHER (Specify): <br /> E. FACILITY EVACUATION <br /> THE FOLLOWING ALARM SIGNAL(S) WILL BE USED TO BEGIN EVACUATION OF THE FACILITY (Check all that apply): EL <br /> Ez. <br /> ❑ 1 . BELLS; <br /> ® 2. HORNS/SIRENS; <br /> 03, VERBAL (i.e., Shouting); <br /> ® 4. OTHER S ec ): <br /> THE FOLLOWING LOCATION( WILL BE USED FOR AN EMERGENCY ASSMBLY AREA(5) (e.g., Paz 'ng lot, street corner): E9. <br /> Note: The Emergency Coordinator must account for all onsite employees and visitors after evacuation. <br /> EVACUATION ROUTE S AND ALTERNATE EVACUATION ROUTES ARE DESCRIBED AS FOLLOWS: E4. <br /> ® 1 . WRITTEN PROCEDURES DESCRIBING ROUTES, EXITS, AND ASSEMBLY AREAS; <br /> ® 2. EVACUATION MAP(S) DEPICTING ROUTES, EXITS, AND ASSEMBLY AREAS; <br /> ❑ 3. OTHER (Specify): E5. <br /> Note: Evacuation procedures and/or maps should be posted in visible facility locations and must be included in the Contingency Plan. <br /> F. ARRANGEMENTS FOR EMERGENCY SERVICES <br /> ADVANCE ARRANGEMENTS FOR LOCAL EMERGENCY SERVICES (Check one of the following): FL <br /> ® 1 . HAVE BEEN DETERMINED NOT NECESSARY; <br /> Ez. <br /> ❑ 2. THE FOLLOWING ARRANGEMENTS HAVE BEEN MADE (Specify); <br /> Note: Advance arrangements with local fire and police departments, hospitals, state and local emergency response teams, and/or emergency services <br /> contractors should be made for your facility, if necessary. Large Quantity Generators must describe arrangements in the Contingency Plan. <br /> Rev. 03/07/17 Page 2 of 4 <br />