Laserfiche WebLink
Recommended Practices for the Testing and Verification of Spill,Overfill,Leak Detection and Secondary Containment Equipment at UST Facilities <br /> • inspect and reinstall all containment sump If the water level changes 1/8(0.125)inch or great- <br /> lids, gaskets and covers. er, the containment sump fails the integrity test. <br /> 6.5.7 Pass/Fail Criteria. If the water level 6.6 Accelerated Precision Hydrostatic Test for Spill <br /> changes less than 1/8(0.125)inch,the containment Buckets and Containment Sumps. Electronic preci- <br /> sump passes the integrity test. sion test equipment can be utilized to test spill buckets <br /> and containment sumps. It incorporates more sensitive <br /> ,, equipment that permits a test to be conducted in a shorter <br /> .. ...: <br /> '�3 `, period of time.The procedures use the same test fluid and <br /> ,� ;�i:?I,•F"`liyytt•,F:4aC_,•rtr;� �/ ,,C>.;,iriyi;�•}� e,�;,',,bs`,. <br /> �;� �,+'���� -`!'i-�;•��,� 1 t ;= � } tix t� '� � tests the same volume as other methods outlined in this <br /> chapter.The manufacturer of the measurement equipment <br /> should specify the precision and duration of the test and <br /> G" the pass/fail criteria. However, pass/fail criteria should <br /> F <br /> not be less stringent than those prescribed for the 1-hour <br /> i <br /> test in Section 6,5.7. <br /> The data sheet for Sections 6.2 or 6.5 may be used for this <br /> test. Refer to Appendix D. <br /> + 6.7 Proper Disposal of Test Liquids. Test liquids <br /> must be disposed of properly. Check with the AHJ <br /> regarding requirements for proper disposal. <br /> FIGURE 6-7. The test fluid level in the tank sump must <br /> be at least 4 inches above the highest sump penetra- <br /> tion or sidewall seam. <br /> r.; 7. UST:.:4VERF1Ll,:EQUIPMENT. <br /> YWRCATION,..;.! CTP4N <br /> �,•"�,, .�;, ,�� ..AND:TESTING . <br /> Although the effectiveness of overfill prevention devices <br /> t tri ir, can be tested by attempting to overfill a UST with <br /> product and determining how well the device functions, <br /> r s'i7 this approach is not recommended. Any malfunction in <br /> �y. the overfill prevention device could result in a product <br /> lrt:: • release that could result in a threat to public health and <br /> safety and environmental damage. <br /> al UST rules r uire that overfill revention equip- <br /> Feder <br /> eq P'_ meat automatically restrict flow or atert the transfer <br /> operator when the tank is no more than 90 percent full <br /> y � ofar or shut off flow into a tank when it is no more than 95 <br /> r& y' percent frill.Other altetnatives to prevent overfills are the <br /> 7RQ <br /> t•.,'' ' <br /> restriction of flow during a delivery 30 minutes prior to <br /> a.• overfilling;alerting the operator 1 minute before overfill- <br /> ing may occur; or automatically shutting off flow into a <br /> ;; " r• tank so that none of the fittings located on top of the tank <br /> are exposed to product due to overfilling. <br /> The committee has written the recornmended practices <br /> FIGURE 6-8. Measuring sticks used to measure the for automatic shutoff devices to reflect that the devices <br /> water level should be securely mounted to ensure that must be set to shut off flow when the tank is no more <br /> they do not move during the test. than 95 percent full, and flow restriction and overfill <br /> pei.org 0 <br />