Laserfiche WebLink
■ <br /> N <br /> t` 4) <br /> N r) <br /> CI) co <br /> LO <br /> 0 Profes <br /> � on 40 sional E nginee►•Certificati ('FR t 12.3(4) <br /> CL CERTIFIC: <br /> D �t TION: Bti [Weans of this certification. 1 attzst that 1 am fvnilicv�4ith the <br /> requireme <br /> O nts of Prop inions of•!p CFR Part 1 12• that I or my designated agent hayc visited and <br /> o ev•=mined the facility, <br /> (V 2 en T RAL,praCl4Cec dial this SPCC Plan has been prepared in accordance with good <br /> gtnez , <br /> a �qu mento including consideration of apPlicable industry•standards,wid with the <br /> of this Pali. that Procedures for required inspections and testing have been <br /> established and that the Plan is adequate tier the facility. <br /> The Professional Engineer has siened and certified the SPCC Plan with t <br /> the implementation schedule would be adhered to and completed as Propos e expectation that <br /> 1a)t 1)Conformance with 40 CFR Part 1 12.7. P p sed in section 112.7 <br /> Engineer: Nfichael J. Zimmerman, P.E. <br /> Signature: <br /> Registration No.: C - 1 83 <br /> State: California <br /> Date: <br /> 11 00 QRot�ssiok <br /> (Seal) y�'�, t7 <br /> No.CH 51 R7 fn <br /> x <br /> Management Approval 40 CFR 112.7 <br /> This Spill Prevention Control and Countermeasure(SPCC)Plan fully supported by the <br /> management of Owens-Brockway Glass Container Inc.(Owens-Brockway). Owens- <br /> Brockway will implement this Plan and amend it as needed due to discharge of oil,facili <br /> expansions,modifications,or improvements. <br /> v Rodney Detmer <br /> Date <br /> Plant Manager <br /> 1_ Owens-Brockway Glass Container Inc. W <br /> Tracy,California Plant#22 z <br /> W <br /> x O <br /> C <br /> U) 1 November S,2004 m <br />