Laserfiche WebLink
as <br /> CONTENTS <br /> Section Page <br /> Professional Engineer Certification 40 CFR 112.3(d).................................... 1 <br /> Management Approval 40 CFR 112.7..............................................................3 <br /> Certification of the Applicability of the Substantial Harm Criteria <br /> Checklist (C-11 Form)....................................................................................... 4 <br /> FiveYear Review Plan Summary Page........................................................... 5 <br /> Locationof Plan Statement............................................................................... 6 <br /> SpillHistory........................................................................................................ 6 <br /> Introduction........................................................................................................ 7 <br /> GeneralFacility Information............................................................................ 9 <br /> SpillResponse Team.......................................................................................... 9 <br /> Facility Description and Oil Storage Capacity ............................................. 12 <br /> Purpose.............................................................................................................. 14 <br /> General Requirements-40 CFR Part 112.7 ................................................... 15 <br /> Requirements for SPCC Plans-40 CFR Part 112.7..............................................................1 <br /> Methods of Disposal..................................................................................................................................... <br /> 1 <br /> Potential Equipment Failures Resulting in Spills-40 CFR 112.7(b)....................................17 <br /> Containment and Diversionary Structures-40 CFR Part 112.7(c)(1)...................................22 <br /> Demonstration of Practicability-40 CFR Part 112.7(d)........................................................25 <br /> Inspections and Records-40 CFR Part 112.7(e)...................................................................25 <br /> Personnel Training and Spill Prevention Procedures-40 CFR Part 112.7(f)........................25 <br /> Security-40 CFR Part 112.7(g).............................................................................................26 <br /> Tank Car Loading/Unloading Areas-40 CFR Part I I2.7(h) ................................................27 <br /> Field-Constructed Aboveground Container-40 CFR Part 112.7(i)......................................27 <br /> State Guidelines and Regulations-40 CFR Part 112.70)......................................................28 <br /> Qualified Oil-filled Operational Equipment -40 CFR Part 112.7(k)....................................28 <br /> Requirements for Onshore Facilities (Excluding Production Facilities).... 29 <br /> -40 CFR Part 112.8 .......................................................................................... 29 <br /> Requirements Under 40 CFR 112.7 and 40 CFR Part 112.8 —40 CFR Part 112.8 (a)........29 <br /> Facility Drainage-40 CFR Part I I2.8(b)..............................................................................29 <br /> Bulk Storage Containers-40 CFR Part 112.8(c)...................................................................30 <br /> Transfer Operations, Pumping, and Facility Processes-40 CFR Part 112.8(d)....................35 <br /> General Requirements-40 CFR Part 112.9, 112.10, 112.11, & 112.12........ 36 <br /> TABLES <br /> 1 Oil Storage Capacity .......................................................10 <br /> Potential Releases Associated with ASTs...................................................................16 <br /> Potential Releases Associated with Drums, Totes, and Equipment............................18 <br /> ii May 2017 <br />