My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SCHULTE
>
14700
>
2800 - Aboveground Petroleum Storage Program
>
PR0516327
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2021 6:08:55 PM
Creation date
8/19/2021 8:45:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0516327
PE
2832
FACILITY_ID
FA0006674
FACILITY_NAME
OWENS-BROCKWAY GLASS CONTAINER INC
STREET_NUMBER
14700
Direction
W
STREET_NAME
SCHULTE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
209-240-24
CURRENT_STATUS
01
SITE_LOCATION
14700 W SCHULTE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
571
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSED SCHEDULE FOR MODIFICATIONS <br />The Facility has proposed to complete the following projects according to the schedule shown <br />below, which will ensure the site is in compliance with the SPCC Plan requirements of 40 <br />CFR 112. The Professional Engineer signed and certified the SPCC Plan with the expectation <br />that the implementation schedule would be adhered to and completed as proposed. The list <br />and schedule below include a location for the facility representative(s) to sign as each project <br />is completed. <br />Project <br />Scheduled Date of <br />Signature and <br />Completion <br />Date Completed (Note 1) <br />1. Replace two salvage oil tanks or <br />Estimated to occur by <br />provide adequate secondary <br />the end of the first <br />(Signature) <br />containment: 1,750 -gal and 450 -gal. <br />quarter of 2017. <br />(Date) <br />2. Install a level gauge for Generator A <br />Within 30 days of the <br />� z L <br />date of this Plan <br />(Signature) <br />(Date) <br />3. Install secondary containment around <br />Estimated to occur by <br />Generator Tanks A, B, and C. <br />the end of the first <br />(Signature) <br />quarter of 2017. <br />(Date) <br />4. Install secondary containment around <br />Within 60 days of the <br />Biosol containers/tanks. <br />date of this Plan <br />(Signature) <br />(Date) <br />5. Prevent run-on of rainwater into the Blue <br />Estimated to occur by <br />Storage Building. Two options include <br />the end of the first <br />(Signature) <br />installing a roll-over berm or a French <br />quarter of 2017. <br />drain/trench at the north entrance. <br />(Date) <br />6. Perform integrity testing for tanks and <br />Estimated to occur by <br />obtain reports that meet the STI SP -001 <br />the end of the first <br />(Signature) <br />requirements: 1,750- and 450 -gallon <br />quarter of 2017. <br />salvage oil tanks. <br />(Date) <br />Note 1: By signing here, I certify that the work was completed on the date noted, and it was <br />performed as proposed by the Professional Engineer at the time this Plan was signed and <br />certified. <br />RECEIVED <br />SEP <br />262016 <br />� August 2016 <br />ENVIRONMENTAL HEALTH <br />DEPARTMENT <br />