ORDER BOARD AND MENU BOARD ENLARGED PLAN ELECTRICAL SYMBOL SCHEDULE
<br /> SCALE: 3/16" = 1'-0" 21
<br /> / D a-❑, —O POLE MOUNTED LIGHTING FIXTURE. RE: 3E3.2 a TELECOMMUNICATIONS
<br /> OS MMUNI TIO S OUTLET.
<br /> ED TOACCESSIBLE CEILING OTHERWISE,
<br /> ROUTE ATTIC TWO "A FLUSH MOUNTED PANEL. LINE DENOTES PANEL DOOR.
<br /> 3/4" - H
<br /> LIGHTING FIXTURE TYPE A: CONNECT TO CIRCUIT NO. 1 IN PANEL SPACE AND TERMINATE WITH A BUSHING. CONDUIT SHALL BE — — — CONDUIT RUN CONCEALED UNDER FLOOR OR UNDERGROUND a 19 T
<br /> A. CONNECT TO SWITCH INDICATED BY LETTER "a". WHERE NO °� 94 o
<br /> O WP A-1 BENT/INSTALLED SUCH THAT 0 -3 MINIMUM OF CONDUIT IS AT 45
<br /> A'° LETTER IS SHOWN, CONNECT TO SWITCHES) (SINGLE POLE OR DEGREES FROM HORIZONTAL WITH CEILING PLANE. PROVIDE PULL STRING DISCONNECT SWITCH WITH EQUIPMENT GROUND LUG (SIZE/POLE/FUSE SIZE): "'
<br /> C-24 TO— / 60/3/NP 60A, 3 POLE SWITCH, FUSED AS PER NAMEPLATE OF EQUIPMENT SERVED BY x . o "
<br /> SIGN LIGHTS / THREE-WAY) IN ROOM. IN ALL CONDUIT ROUTES 2 OR GREATER. SWITCH. 1 " x
<br /> EXIT LIGHT: SHADED AREA DENOTES FACE. WALL MOUNT WHEN o ~ N
<br /> / SHOWN WITH BRACKET, NL NIGHT LIGHT. FIXTURE CIRCUITED TO AN UNSWITCHED CONDUCTOR OF THE 6P
<br /> DISCONNECT SWITCH WITH EQUIPMENT GROUND LUG (SIZE/POLE): 60A 3 x o
<br /> CEILING MOUNT OTHERWISE. COORDINATE CIRCUIT INDICATED. POLE, NON-FUSIBLE SWITCH.
<br /> / WITH DOOR SWINGS. ARROWS AS NOTED.
<br /> r / 48" AFF MOUNT 48" ABOVE FINISHED FLOOR TO CENTER LINE. F- — 7 MECHANICAL EQUIPMENT CONNECTED BY ELECTRICAL. RE: MECHANICAL v c% o
<br /> LRTU-J EQUIPMENT SCHEDULES FOR DESCRIPTION. X �
<br /> CEILING FAN © DAYLIGHT HARVESTER. PROVIDE MODEL NLIGHT/NCM ADCX (RJB) OR APPROVED i o
<br /> TO WITHIN 5' / / EQUAL O REFERENCE TO ELECTRICAL KEYNOTE NUMBER 1. �_
<br /> OF PRE-MENU / / WALL MOUNTED EMERGENCY BATTERY BACKED UP LIGHTING FIXTURE. ) .L/)
<br /> ° r"
<br /> BOARD. STUB / / FRCP FIRE ALARM CONTROL PANEL o Cn
<br /> / / PP RELAY MODULE. PROVIDE MODEL NLIGHT NPP16D co
<br /> UP 1' ABOVE / / LC LIGHTING CONTACTORQo EUWALL NLIGHT CONTROLLER. PROVIDE MODEL NLIGHT NPODM 4S DX. PROVIDE © JUNCTION/PULL BOX
<br /> GROUND. / / pC PHOTOCELL FOR DAYLIGHT SENSING FOR PROGRAMMING OF SYSTEM TO WORK AS SPECIFIED ON SHEET E2.2 WITH
<br /> TV POWER AND DATA FOR TV TO BE LOCATED IN THE CEILING ABOVE NOTATION.
<br /> EACH SWITCH DESIGNATION TO BE CONTROLLED WITH ONE SCENE EACH. -
<br /> � SINGLE POLE TOGGLE SWITCH O WIRES ARE TO BE ROUTED DOWN THE SCREEN MOUNTING STRUCTURE.
<br /> /
<br /> �F FAN CONTROL SWITCH LV LOW VOLTAGE OCCUPANCY SENSOR. PROVIDE MODEL NLIGHT NCM PDT 9 (RJB) COORDINATE THE EXACT LOCATION WITH THE ARCHITECTURAL ELEVATIONS PRIOR
<br /> / P TO ROUGH-IN.
<br /> / TOGGLE SWITCH WITH PILOT LIGHT. SWITCH SHALL BE 120/277V, OS LINE VOLTAGE OCCUPANCY SENSOR. PROVIDE MODEL SENSOR SWITCH
<br /> / 20A RATED. PILOT LIGHT SHALL BE ENERGIZED IN ON POSITION CMR-PDT-9 OR APPROVED EQUAL. FK KIDS BUMP BAR AND MONITOR. PROVIDE A RECEPTACLE CONNECTED TO THE
<br /> /
<br /> ONLY. NOTED CIRCUIT AND A COMMUNICATION OUTLET (SEE SYMBOL ABOVE FOR
<br /> 1-1/2" EC EMPTY CONDUIT WITH PULL WIRE. EMPTY CONDUIT RUN TO ABOVE CEILING DETAILS). COORDINATE LOCATION WITH ARCHITECTURAL ELEVATIONS. KIDSStore:
<br /> $OS WALL MOUNTED OCCUPANCY SENSOR SWITCH SHALL TERMINATE IN A BUSHING AND BE BENT/INSTALLED SUCH THAT 0'-6" OUTLETS ARE TO BE INSTALLED INSIDE THE WALL WITH A JUNCTION BOX &
<br /> � SINGLE POLE DIMMER SWITCH 1311 E. YOSEMITE AVE.
<br /> / MINIMUM OF CONDUIT IS PARALLEL WITH CEILING PLANE. ACCESS PANEL.
<br /> 3/4"C- // Q DUPLEX RECEPTACLE WP WEATHERPROOF, NEMA 3R OR AS NOTED ON PLANS. 0 FIRE ALARM AND/OR RETURO SMKE AIR DETECTOR IN SUPPLY MANTECA, CA 95336
<br /> QUAD RECEPTACLE RE: 1E2.1 REFER TO DETAIL 1, SHEET E2.1. O FIRE ALARM SMOKE DETECTOR. Restaurant #RC529
<br /> d) DUPLEX RECEPTACLE WITH GROUND FAULT CIRCUIT INTERRUPTION CLG RECEPTACLE MOUNTED IN LAY-IN CEILING. COORDINATE DEVICE AND PLATE FAP FIRE ALARM PANEL
<br /> r r
<br /> y� GFCI PROTECTION COLOR WITH ARCHITECT. RAP FIRE ALARM REMOTE ANNUNCIATOR PANEL. PROVIDE 3/4"C TO Professional of Record: NAME
<br /> , / // DUPLEX RECEPTACLE WITH ISOLATED GROUND © BUZZER
<br /> TO WITHIN 5 / IG ASSOCIATED FIRE ALARM PANEL.
<br /> OF PRE.-MENU / / ch CONTROLLED DUPLEX RECEPTACLE PB PUSHBUTTON ASSEMBLY FS SPRINKLER SYSTEM FLOW SWITCH, CONNECT
<br /> BOARD. STUB / TO FIRE ALARM SYSTEM.
<br /> / / ® SPECIAL RECEPTACLE, SEE PLANS.
<br /> / UP 1' ABOVE / / TS
<br /> SPRINKLER SYSTEM TAMPER SWITCH,
<br /> GROUNC. /
<br /> CONNECT TO FIRE ALARM SYSTEM.
<br /> f/ = 3/4"C KEYNOTES ELECTRICAL SITE PLAN
<br /> 31
<br /> 1if = 201-011
<br /> _ ROBISON
<br /> 600A NEMA 3R EUSERC RATED METER/MAIN SWITCHBOARD. COORDINATE REQUIREMENTS WITH UTILITY PROVIDER. TIE INTO UNDERGROUND SERVICE CONDUIT C-10 12
<br /> I TO OFFICE I 1 WITH RIGID STEEL CONDUIT AND TURN UP ON OUTSIDE OF BUILDING INTO METER BASE. SEE CIVIL UTILITY PLAN FOR SITE TIE-IN LOCATION. EXTEND ANY
<br /> �� - - - - - - - - - - - - - - �� ENGINEERING, INC
<br /> I � " SEE DETAIL — ZZ 19401 40TH AVE W.,SUITE 302 CEILING SPACE I I SPARE CONDUIT TO BUILDING EXTERIOR, CAP AND MARK. SEE RISER DIAGRAM ON SHEET E3.1 FOR CONTINUATION. XX THIS SHEET FOR > LYNNWOOD,WA 98036
<br /> I ,'1 FOR MUSIC TO OFFICE I I PROPOSED UNDERGROUND CONDUIT ROUTING FOR TELEPHONE AND INTERNET SERVICE. TIE INTO UNDERGROUND 4"CONDUIT FOR PHONE 3"CONDUIT FORC-10 12 ZENLARGED VIEW �� / 206-364-3343 TEL
<br /> I I SPEAKER CEILING SP CE I I O INTERNET AND EXTEND INTO BUILDING AS INDICATED ON SHEET E2.1. SEE CIVIL UTILITY PLAN FOR SITE TIE-IN LOCATION. EC TO COORDINATE WITH
<br /> I FOR MUSIC I I TELEPHONE UTILITY COMPANY FOR ALL RESPONSIBILITIES, FINAL CONDUIT SIZING, ROUTING, AND QUANTITY PRIOR TO BID & INSTALLATION. / LU > / REI# 424-1497
<br /> SPEAKER I O PROVIDE (3) 2"C TO SIGN, TWO FOR ALL SIGN POWER CONDUCTORS AND THE OTHER FOR DATA. DISCONNECT SWITCHES SHALL SWITCH THE NEUTRAL
<br /> J I CONDUCTOR. CIRCUITS CONNECTED TO THE SAME DISCONNECT SWITCH SHALL SHARE THEIR NEUTRAL CONDUCTOR /
<br /> I O4 ORDER BOARD, SPEAKER PEDESTAL AND CANOPY. 1 /
<br /> O PRE-MENU BOARD. EC TO CONFIRM LOCATION AND POWER REQUIREMENTS PRIOR TO WORK. i /// 15
<br /> OFESS/pN
<br /> EMPTY JUNCTION BOX AND COVER FOR FUTURE TRASH COMPACTOR. PROVIDE 3"EC WITH PULL STRING TO THE PANEL A AND STUB INTO THE PANEL 1 / (TYP) QR
<br /> S A
<br /> / // O7 3/4" EC FROM PAY WINDOW. RE:1 E2.1, KEYNOTE 31. CIO
<br /> �
<br /> P
<br /> 3/4"C 8 // 3/4"C O8 3/4" EC TO LOOP DETECTOR. RE:1 E3.3. 1 lo. E-23059 r1
<br /> rri
<br /> _I, �, TO PANEL "C" j' / f,T0 PANEL "C" PROVIDE 2) 1" EMPTY CONDUIT WITH PULLSTRINGS FROM THE ACCESSIBLE CEILING SPACE, THROUGH THE WALL AND UNDERGROUND TO THE 1 / EXP. 3- 1-22
<br /> rrIl
<br /> SPEAKER ( USP I O PLANTER AREA. CAP OFF THE CONDUIT AS IT ENTERS THE PLANTER. EC TO FIELD COORDINATE FINAL LOCATION PRIOR TO INSTALLATION. 1 F ElUU /
<br /> PEDESTAL I C-24 TO C-24 TO PROVIDE (2) 1" EMPTY CONDUIT TO BRIDGE THE GAP IN THE PLANTERS. CAP OFF THE CONDUIT AT BOTH ENDS. EC TO FIELD COORDINATE FINAL 1 C-10,12 — — qTF £C O�
<br /> CAN Y LIGHTS 10 I CA��F
<br /> � CANOPY SPEAKER ' / � LOCATION PRIOR TO INSTALLATION. I 14
<br /> LIGHTS PEDESTAL 13/4" I C-24 11 UTILITY TELEPHONE/CATV VAULT & PULLBOX FOR RAISING CANES SERVICE. EC TO COORDINATE WITH UTILITY COMPANY FOR FINAL LOCATION, ALL 1 26 /r
<br /> SIGN O RESPONSIBILITIES, AND ANY OTHER APPLICABLE REQUIREMENTS PRIOR TO BID & INSTALLATION. Ire
<br /> 12
<br /> P 3/4 C 7 P LIGHTS I .�. - -
<br /> 12 PROPOSED ROUTING OF PRIMARY ELECTRICAL SERVICE CONDUIT/FEEDERS. EC TO COORDINATE WITH UTILITY COMPANY AND GENERAL CONTRACTOR FOR I — — — — — �d 08/07/20
<br /> _ 4 ALL RESPONSIBILITIES INCLUDING BUT NOT LIMITED TO: TRENCHING, FINAL CONDUIT/FEEDERS SIZES AND QUANTITY, ETC. PRIOR TO BID & I ® 27 r 1
<br /> SIGN
<br /> INSTALLATION. I 1 TYP 1 I I Prototype: P4 EXTENDED- HV, SCHEME A
<br /> LIGHTS 13 PROPOSED ROUTING OF SECONDARY ELECTRICAL SERVICE CONDUIT/FEEDERS. EC TO COORDINATE WITH UTILITY COMPANY AND GENERAL CONTRACTOR
<br /> O FOR ALL RESPONSIBILITIES INCLUDING BUT NOT LIMITED TO: TRENCHING, FINAL CONDUIT/FEEDERS SIZES AND QUANTITY, ETC. PRIOR TO BID & I I 13 1 1 Prototype Issue Date: 6.29.2020
<br /> INSTALLATION. 1 15 C-25 2 i I Design Bulletin Updates: INCLUDED
<br /> OUTILITY PAD MOUNTED TRANSFORMER. EC TO COORDINATE WITH UTILITY COMPANY TO PROVIDE POWER TO RAISING CANES RESTAURANT, FOR ANY 1 (TYP) #10 _
<br /> 14 APPLICABLE REQUIREMENTS AND ALL RESPONSIBILITIES PRIOR TO BID & INSTALLATION. 1 VIA CON CTOR Q �, I 1 Date Issued: Bulletin Number:
<br /> OPROPOSED SITE EQUIPMENT CONDUIT/FEEDER ROUTING, EC TO COORDINATE WITH CIVIL PLANS AND GENERAL CONTRACTOR FOR BEST POSSIBLE I l I I I NOV. 2018 1 & 2
<br /> 15 CONDUIT/FEEDER ROUTING FROM PANEL TO EQUIPMENT PRIOR TO ROUGH-IN. (TYPICAL) I 6 l 1 1
<br /> 16 BUILDING POINT OF ENTRY FOR 2" CW. —�J C 10,1 ZZ i 1st Building Submittal
<br /> 17 BUILDING POINT OF ENTRY FOR 4" GREASE WASTE. W = _ _
<br /> I
<br /> 16 1 . 000 21 �I
<br /> 18 BUILDING POINT OF ENTRY FOR 4" SANITARY SEWER. 1
<br /> ,. ., P� 17 I I
<br /> 19 3/4 H/CW TO WALL HYDRANT AT DUMPSTER PAD 1/2" H/CW TO FUTURE OUTDOOR HANDSINK C-10,12 , 19 1
<br /> 20 BUILDING POINT OF ENTRY FOR 3" GAS SERVICE AND GAS METER. VI 18 i I
<br /> VA
<br /> O21 PROPOSED JENSEN PRECAST 1,500 GALLON GREASE INTERCEPTOR AND SAMPLE BOX 2432Z. SEE SHEET P4.1 FOR DETAILS. 3" VENTS BACK CONTACT R r 20
<br /> TO BUILDING VENT SYSTEM.
<br /> 22 EC TO ROUTE 1"C WITH PULLSTRING FROM PANEL "A" FOR FUTURE EV CHARGING STATION. FIELD DETERMINE FINAL CONDUIT ROUTING PRIOR L I REVISIONS:
<br /> TO ROUGH—IN. I 1 08-07-20 1st. Bldg. Submittal
<br /> 23 PROVIDE WEATHER PROOF SWITCH FOR TRASH ENCLOSURE LIGHTING. EC TO FIELD DETERMINE FINAL LOCATION PRIOR TO INSTALLATION.
<br /> 9 ® i I oA� o 2
<br /> 3
<br /> 24 FIXTURES SHALL BE ORDERED WITH INTEGRAL MOTION SENSOR CAPABILITIES. (TYPICAL)
<br /> W 22
<br /> 4
<br /> O25 EC TO PROVIDE POWER FOR TUCCI UMBRELLA. CONFIRM FINAL LOCATION AND POWER REQUIREMENTS WITH SPECS AND CONSTRUCTIONA n I�II�IIIIIIIIIIO�IIIIII\ B-1 I o>m o 5
<br /> MANAGER PRIOR TO ROUGH—INS. O — E
<br /> �T-1 /^� nuu°i i 1 - 22 C7
<br /> f) N -< UJ 91I 1j1j111111 I'� 1 1 U
<br /> O26 EC TO ROUTE (2) 1 CONDUITS WITH PULLSTRING (ONE FOR POWER AND ONE FOR DATA) TO LOCATION NEARBY DRIVE THRU AS SHOWN ON VIA 0 -00 n ,i, I„o°” l
<br /> PLANS AND CAP FOR FUTURE INSTALLATION OF DRIVE THRU CANOPY DESIGN. FIELD DETERMINE FINAL CONDUIT ROUTING FROM PANEL A TO CONTACTOR D ",I�a I opn o 8
<br /> C-14,16 z i
<br /> THE DRIVE THRU EQUIPMENT PRIOR TO BID & INSTALLATION. cn m m ��I'ol„,J, I 22 9
<br /> #10 II 11111 4,i
<br /> 27 1/2” H/CW TO FUTURE OUTDOOR HANDSIN, CAP FOR FUTURE INSTALLATION. <
<br /> I
<br /> J II
<br /> I u 1 4,16
<br /> Sheet Title:
<br /> VV
<br /> ELECTRICAL SITE
<br /> \ . 0 91 i ,/ -14,16 PLAN
<br /> iii 1 o I I , vv
<br /> \ ®� Date: 08.07.2020
<br /> I Project Number: RAC19024.0
<br /> \ I
<br /> // I C-6, I Drawn By: XXX/XXX
<br /> -
<br /> UTILITY CONTACT INFORMATION. \\ // I #6
<br /> I #66
<br /> F / II
<br /> NOTE: EC TO COORDINATE WITH UTILITIES FOR ALL REQUIREMENTS AND RESPONSIBILITIES (INCLUDING BUT NOT LIMITED TO, / 15 I 30/ Sheet Number:
<br /> Y
<br /> TRENCHING, METERING, CONDUIT SIZE AND QUANTITY, FINAL LOCATIONS, ETC.) PRIOR TO BID & INSTALLATION AND MODIFY BID '\ C-14,16 / TYP I WP
<br /> APPROPRIATELY TO INCLUDE ALL SCOPE OF WORK REQUIRED FOR A COMPLETE INSTALLATION. \ Y // ( ) 1 O3
<br /> POWER: TELEPHONE:
<br /> PG&E COMCAST FRONTIER p
<br /> HASIB HABIBI AUNG NAING JAMES CARTER u I� 11 E1 . 0 Q
<br /> Phone:909 592 3275 Email:comcast-californiaintents.com Email:james.w.carter@ftr.com � _ _ _— - LiEmail:hasib.habibiC°Dpge.com ONE � C-14,16
<br /> DO ENTER
<br /> N
<br /> COPYRIGHT 2020, ROBISON ENGINEERING, INC.
<br /> ,ESCALONA F:\-PEDRO+MCCRACKEN\-RAISING CANES\424-1497 MANTECA, CA\DWG\E10P4.DWG 07-22-2020 11:23
<br />
|