Laserfiche WebLink
6 <br /> z <br /> 19 - 28 <br /> Vicinity Map Owner <br /> F v <br /> Refuge Christian 01p, Cane's USA, L.L.C. <br /> I p <br /> softer St E Sutter St �Q Preschool &... ti 6800 Bishop Rd. K I E S E L • DESIGN <br /> / Plano, TX 75024 <br /> Armstrong Dr (972) 769-3348 <br /> Doctors Hospital kroberts@raisingcanes.com <br /> of Manteca Mitchell Ln Kiesel Landscape <br /> E North St <br /> o Sandpiper Village Architecture Inc. <br /> Apartments Landscape Architect <br /> C n m <br /> CID > <br /> Pine slD CottageCt Jack Kiesel 422 E Main Street <br /> Kiesel Design <br /> 1 325 East 422 E Main Street Ventura, CA 93001 <br /> Yosemite Avenue Ventura, CA 93001 <br /> 99 <br /> tel: 805.947.0730 (p) 805.947.0730 <br /> In-N-Out Burger email: jack@kieseldesign.com Jack@kieseldesign.com <br /> CA License #: 5206 <br /> Food 4 Less� HwSP CL# 5206 <br /> y� <br /> Lambdin St y <br /> a `[ <br /> a � N <br /> c c <br /> p 7 <br /> OAir- HICKEN INGERS M <br /> SchadeckS1 The Home Depot n Civil Engineer <br /> N�t�ar9r � <br /> US Social Security Kimley-Horn and Associates Inc RC #529 <br /> Administration 19 765 The City Dr. Suite 200 <br /> Orange, CA 92868 <br /> (714) 939-1030 Raising Cane's <br /> Scale = 1:2500 0 Manteca <br /> 1325 Yosemite Ave <br /> Raising Cane's - Store #529 Manteca, CA 95336 <br /> Manteca, CA 95336 General Notes Sheet Index <br /> 1 . The Landscape Contractor (Contractor) shall notify Underground Service LANDSCAPE Submittals:Alert (USA) before start of construction at (800) 422-4133. # DATE NAME <br /> 1 07.23.20 80% Review Set <br /> 2. The California Public Utilities Code mandates that the gas company 1-0.0 Cover Sheet <br /> (Southern California Gas) is notified a minimum of two days prior to the start 2 os.o7.2o First Submittal <br /> TOTAL LANDSCAPE AREA: 8,709 SF of construction. L1.1 Materials Plan <br /> 1-1.2 Patio Finish & Sawcut Plan <br /> PROJECT TYPE: Commercial 3. Site conditions may change due to unforeseen circumstances that occur as L2.1 Irrigation Plan <br /> projects undergo construction. If a proposed built element, grade change or <br /> landscape feature seems problematic and it is evident that contruction may L2.2 Irrigation Notes <br /> not proceed per the approved drawings, the Landscape Contractor shall call L2.3 Irrigation Details <br /> WATER SUPPLY: Potable the Landscape Architect to coordinate any issues before continuing with site <br /> L2.4 Irrigation Details <br /> work. <br /> L2.5 Irrigation Details � DscaPE <br /> 4. Contractor shall confirm all field dimensions and conditions prior to the L2.6 Irrigation Specifications ��� G1 giesel #S <br /> start of work. Any discrepancies with plans shall be reported to the Owner 06, r� <br /> and Landscape Architect. L2.7 Irrigation SpecificationsU 1111 <br /> L3.1 Planting Plan agnalure <br /> a <br /> 5. Contractor shall make modifications to material and/or method of 12.31.20 <br /> FbneNal Date <br /> installation as required by local code and Conditions of Approval, but shall L3.2 Planting Details 8.7.o <br /> Dae <br /> notify the Owner and Landscape Architect of such changes prior to L3.3 Planting Specifications ����of('ALI�0 <br /> construction. <br /> L3.4 Planting Specifications <br /> L3.5 Maintenance Specifications <br /> L3.6 Soils Report <br /> Type: First Submittal <br /> Best Management Practices for Construction <br /> Activities: <br /> 1. Stockpiles of earth, sand and other construction related materials must be Initial Setup Date: <br /> protected from being transported from the site by the forces of wind or water. January 20, 2020 <br /> This includes sand for stucco, drywall demolition debris, drywall "mud" <br /> packaging, etc <br /> 2. Fuels, oils, solvents and other toxic materials must be stored in accordance Drawn By: <br /> with their listing and are not to contaminate the soil and surface waters. All # NAME DATE <br /> approved storage containers are to be protected from the weather. Spills may B.Jordan 08/2020 <br /> not be washed into the drainage system. <br /> 3. Non-stormwater runoff from equipment and vehicle washing and any other <br /> activity shall be contained at the site. ©2018 Kiesel Landscape Architecture Inc The design Ideas <br /> Y and plans represented by these documents are the property <br /> of Kiesel Design.Use or copy is permitted by contract only. <br /> The use or revisions of these ideas or plans is prohibited <br /> 4. Excess or waste concrete may not be washed into the public way or any without the written permission of Kiesel Design. <br /> other drainage system. Provisions must be made to retain concrete wastes on <br /> site until they can be disposed of as a solid waste. <br /> 5. Trash and construction related solid wastes must be deposited into a Title: <br /> covered receptacle to prevent contamination of rainwater and dispersal by <br /> wind. Cover Sheet <br /> 6. Sediments and other material may not be tracked from the site by vehicle <br /> traffic. The construction entrance roadways must be stabilized so as to inhibit <br /> sediments from being deposited into the public way. Accidental depositions <br /> must be swept up immediately and may not be washed down by rain or other <br /> means. <br /> Sheet Number: <br /> LOmO <br />