GENERAL CONSTRUCTION NOTES EROSION CONTROL NOTES PAVING, GRADING AND DRAINAGE NOTES BUILDING AND SAFETY DIVISION NOTES CITY OF MANTECA GENERAL NOTES
<br /> c
<br /> 1. ANY DISCREPANCIES ON THE DRAWINGS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE 1. THE STORM WATER POLLUTION PREVENTION PLAN ("SWPPP") IS COMPRISED OF THIS EROSION 1. ALL PAVING, CONSTRUCTION, MATERIALS, AND WORKMANSHIP WITHIN JURISDICTION'S RIGHT-OF-WAY 1. FILL TO BE COMPACTED TO NOT LESS THAN 90% OF MAXIMUM DENSITY AS DETERMINED BY A.S.T.M.
<br /> SOIL COMPACTION TEST D1557. 1. CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE
<br /> OWNER AND ENGINEER BEFORE COMMENCING WORK. NO FIELD CHANGES OR DEVIATIONS FROM DESIGN CONTROL PLAN, THE STANDARD DETAILS, THE PLAN NARRATIVE, ATTACHMENTS INCLUDED IN SHALL BE IN ACCORDANCE WITH LOCAL OR COUNTY SPECIFICATIONS AND STANDARDS (LATEST RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF
<br /> ARE TO BE MADE WITHOUT PRIOR APPROVAL OF THE OWNER AND NOTIFICATION TO THE ENGINEER. SPECIFICATIONS OF THE SWPPP, PLUS THE PERMIT AND ALL SUBSEQUENT REPORTS AND RELATED CONSTRUCTION OF THIS PROJECT INCLUDING SAFETY OF ALL PERSONS AND
<br /> o EDITION) OR CALTRANS SPECIFICATIONS AND STANDARDS (LATEST EDITION) IF NOT COVERED BY
<br /> co2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THAT THE PROPOSED IMPROVEMENTS SHOWN co DOCUMENTS. LOCAL OR COUNTY REGULATIONS. 2. FIELD DENSITY WILL BE DETERMINED BY THE SAND-CONE METHOD A.S.T.M. 1556-07 AND/OR
<br /> NUCLEAR DENSITY GAUGE METHOD A.S.T.M. 2922/3017. IN FINE GRAINED, COHESIVE SOILS, FIELD PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT
<br /> ° ON THE PLANS DO NOT CONFLICT WITH ANY KNOWN EXISTING OR OTHER PROPOSED IMPROVEMENTS. IF 2. ALL CONTRACTORS AND SUBCONTRACTORS INVOLVED WITH STORM WATER POLLUTION PREVENTION 2. ALL UNPAVED AREAS IN EXISTING RIGHTS-OF-WAY DISTURBED BY CONSTRUCTION SHALL BE DENSITY MAY BE DETERMINED BY THE DRIVE-CYLINDER METHOD D2937 A.S.T.M. PROVIDED NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL
<br /> ° ANY CONFLICTS ARE DISCOVERED, THE CONTRACTOR SHALL NOTIFY THE OWNER PRIOR TO INSTALLATION SHALL OBTAIN A COPY OF THE STORM WATER POLLUTION PREVENTION PLAN AND THE STATE OF REGRADED AND REPAIRED TO EXISTING CONDITION OR BETTER. LESS THAN 20% OF THE REQUIRED DENSITY TESTS, UNIFORMLY DISTRIBUTED, ARE BY THE DEFEND, INDEMNIFY AND HOLD THE OWNER, ENGINEER AND THE CITY
<br /> OF ANY PORTION OF THE SITE WORK THAT WOULD BE AFFECTED. FAILURE TO NOTIFY OWNER OF AN ( HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED IN CONNECTION
<br /> o CALIFORNIA NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL PERMIT NPDES SAND-CONE METHOD. THE METHOD OF DETERMINING FIELD DENSITY SHALL BE SHOWN IN THE
<br /> = IDENTIFIABLE CONFLICT PRIOR TO PROCEEDING WITH INSTALLATION RELIEVES OWNER OF ANY OBLIGATION PERMIT) AND BECOME FAMILIAR WITH THEIR CONTENTS. 3. TRAFFIC CONTROL ON ALL CALTRANS, LOCAL AND COUNTY RIGHTS-OF-WAY SHALL MEET THE COMPACTION REPORT. OTHER METHODS MAY BE USED IF RECOMMENDED BY THE SOILS ENGINEER '
<br /> >1 TO PAY FOR A RELATED CHANGE ORDER. AND APPROVED IN ADVANCE BY THE BUILDING OFFICIAL. WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR
<br /> ° REQUIREMENTS OF THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (U.S. DOT/FHA) AND THE LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE
<br /> E 3. THE CONTRACTOR SHALL IMPLEMENT BEST MANAGEMENT PRACTICES AS REQUIRED BY THE SWPPP. REQUIREMENTS OF THE STATE AND ANY LOCAL AGENCY HAVING JURISDICTION. IN THE EVENT
<br /> Y3. THE CONTRACTOR AND SUBCONTRACTORS SHOULD BE FAMILIAR WITH ALL STATE AND LOCAL ADDITIONAL BEST MANAGEMENT PRACTICES SHALL BE IMPLEMENTED AS DICTATED BY CONDITIONS THAT THE CONTRACT DOCUMENTS AND THE JURISDICTIONAL AGENCY REQUIREMENTS ARE NOT IN 3. NOT LESS THAN ONE FIELD DENSITY TEST WILL BE MADE FOR EACH TWO-FOOT VERTICAL LIFT OF ENGINEER.
<br /> o REQUIREMENTS RELATED TO SITE CONSTRUCTION ACTIVITIES PRIOR TO COMMENCING WORK. ALL WORK AT NO ADDITIONAL COST TO THE OWNER THROUGHOUT ALL PHASES OF CONSTRUCTION. AGREEMENT, THE MOST STRINGENT SHALL GOVERN. FILL NOR LESS THAN ONE SUCH TEST FOR EACH 1,000 CUBIC YARDS OF MATERIAL PLACED 2. UNLESS OTHERWISE STATED, ALL STATIONS INDICATED ON THE IMPROVEMENT
<br /> SHALL CONFORM AS APPLICABLE TO THESE GOVERNING STANDARDS AND SPECIFICATIONS. UNLESS OTHERWISE RECOMMENDED BY THE SOILS ENGINEER. PLANS ARE REFERENCED TO THE CENTER LINE OF THE STREET. ALL
<br /> 04. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING ALL MATERIAL AND LABOR TO CONSTRUCT 4. BEST MANAGEMENT PRACTICES (BMP'S) AND CONTROLS SHALL CONFORM TO FEDERAL, STATE, OR 4. THE CONTRACTOR SHALL GRADE THE SITE TO THE ELEVATIONS INDICATED AND SHALL REGRADE STATIONS ON THE CURBS ARE PERPENDICULAR TO OR RADICALLY OPPOSITE
<br /> THE FACILITY AS SHOWN AND DESCRIBED IN THE CONSTRUCTION DOCUMENTS IN ACCORDANCE WITH LOCAL REQUIREMENTS OR MANUAL OF PRACTICE, AS APPLICABLE. THE CONTRACTOR SHALL WASHOUTS WHERE THEY OCCUR AFTER EVERY RAINFALL UNTIL AN ADEQUATE STABILIZATION 4. NO FILL TO BE PLACED UNTIL STRIPPING OF VEGETATION, REMOVAL OF UNSUITABLE SOILS AND CENTER LINE STATIONS, UNLESS OTHERWISE NOTED.
<br /> THE APPROPRIATE APPROVING AUTHORITIES, SPECIFICATIONS AND REQUIREMENTS. CONTRACTOR SHALL IMPLEMENT ADDITIONAL CONTROLS AS DIRECTED BY THE PERMITTING AGENCY OR OWNER. OCCURS. INSTALLATION OF SUBDRAINS (IF ANY) HAS BEEN INSPECTED AND APPROVED BY THE SOILS
<br /> CLEAR AND GRUB ALL AREAS UNLESS OTHERWISE INDICATED, REMOVING TREES, STUMPS, ROOTS, 5. EROSION CONTROL PLAN MUST CLEARLY DELINEATE ALL STATE WATERS. PERMITS FOR ANY 5. ALL OPEN AREAS WITHIN THE PROJECT SITE SHALL BE COVERED WITH ROCK UNLESS INDICATED ENGINEER. 3. IT IS THE CONTRACTORS'S RESPONSIBILITY TO VERIFY THE LOCATION OF ALL
<br /> 3 MUCK, EXISTING PAVEMENT AND ALL OTHER DELETERIOUS MATERIAL. CONSTRUCTION ACTIVITY IMPACTING STATE WATERS OR REGULATED WETLANDS MUST BE MAINTAINED OTHERWISE ON THE LANDSCAPE PLAN. 5. NO ROCK OR SIMILAR MATERIAL GREATER THAN 8" IN DIAMETER WILL BE PLACED IN THE FILL EXISTING FACILITIES.
<br /> 5. EXISTING UTILITIES SHOWN ARE LOCATED ACCORDING TO THE INFORMATION AVAILABLE TO THE ENGINEER ON SITE AT ALL TIMES. UNLESS RECOMMENDATIONS FOR SUCH PLACEMENT HAVE BEEN SUBMITTED BY THE SOILS ENGINEER
<br /> ° AT THE TIME OF THE TOPOGRAPHIC SURVEY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE 6. ALL AREAS INDICATED AS PAVEMENT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE TYPICAL IN ADVANCE AND APPROVED BY THE BUILDING OFFICIAL. 4. THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY FIELD CHANGES
<br /> OWNER OR THE ENGINEER. GUARANTEE IS NOT MADE THAT ALL EXISTING UNDERGROUND UTILITIES ARE 6. THE CONTRACTOR SHALL MINIMIZE CLEARING TO THE MAXIMUM EXTENT PRACTICAL OR AS REQUIRED PAVEMENT SECTIONS AS INDICATED ON THE DRAWINGS.
<br /> SHOWN OR THAT THE LOCATION N THOSE SHOWN ARE ENTIRELY ACCURATE. FINDING THE ACTUAL BY THE GENERAL PERMIT. 6. FINISH GRADING WILL BE COMPLETED AND APPROVED BEFORE OCCUPANCY OF BUILDINGS. MADE WITHOUT WRITTEN AUTHORIZATION FROM THE CITY ENGINEER.
<br /> LOCATION OF ANY EXISTING UTILITIES IS THE CONTRACTOR'S RESPONSIBILITY AND SHALL BE DONE 7. WHERE EXISTING PAVEMENT IS INDICATED TO BE REMOVED AND REPLACED, THE CONTRACTOR
<br /> o V 7. CONTRACTOR SHALL DENOTE ON PLAN THE TEMPORARY PARKING AND STORAGE AREA WHICH SHALL SAW CUT A MINIMUM 2" DEEP FOR A SMOOTH AND STRAIGHT JOINT AND REPLACE THE 7. SEE CIVIL COVER SHEET FOR EARTHWORK VOLUMES. 5. THE CONTRACTOR SHALL PROVIDE ALL LIGHTS, SIGNS, BARRICADES, FLAGMEN
<br /> Q) BEFORE COMMENCING ANY WORK IN THE VICINITY. FURTHERMORE, THE CONTRACTOR SHALL BE FULLY SHALL ALSO BE USED AS THE EQUIPMENT MAINTENANCE AND CLEANING AREA, EMPLOYEE PARKING PAVEMENT WITH THE SAME TYPE AND DEPTH OF MATERIAL AS EXISTING OR AS INDICATED. OR OTHER DEVICES NECESSARY TO PROVIDE FOR PUBLIC SAFETY IN
<br /> RESPONSIBLE FOR ANY AND ALL DAMAGES DUE TO THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AREA, AND AREA FOR LOCATING PORTABLE FACILITIES, OFFICE TRAILERS, AND TOILET FACILITIES. 8. FILL SLOPES SHALL NOT BE STEEPER THAN 2.1.
<br /> o AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. THE OWNER OR ENGINEER WILL ASSUME NO 8. WHERE NEW PAVEMENT MEETS THE EXISTING PAVEMENT, THE CONTRACTOR SHALL SAW CUT THE ACCORDANCE WITH THE CURRENT ISSUE OF "MANUAL OF TRAFFIC CONTROLS
<br /> co
<br /> a LIABILITY FOR ANY DAMAGES SUSTAINED OR COST INCURRED BECAUSE OF THE OPERATIONS IN THE 8, ALL WASH WATER (CONCRETE TRUCKS, VEHICLE CLEANING, EQUIPMENT CLEANING, ETC.) SHALL BE EXISTING PAVEMENT A MINIMUM 2" DEEP FOR A SMOOTH AND STRAIGHT JOINT AND MATCH THE 9. PRIOR TO THE ISSUANCE OF BUILDING PERMITS, SUBMIT A SOIL'S ENGINEER REPORT ON THE WARNING SIGNS, LIGHTS AND DEVICES FOR USE IN PERFORMANCE OF WORK
<br /> ° VICINITY OF EXISTING UTILITIES OR STRUCTURES, NOR FOR TEMPORARY BRACING AND SHORING OF SAME. DETAINED AND PROPERLY TREATED OR DISPOSED. EXISTING PAVEMENT ELEVATION WITH THE PROPOSED PAVEMENT UNLESS OTHERWISE INDICATED. EXPANSIVE PROPERTIES OF SOIL AS SUCH SOILS ARE DEFINED BY THE BUILDING CODE, SECTION UPON HIGHWAYS" PUBLISHED BY THE STATE OF CALIFORNIA BUSINESS AND
<br /> o IF IT IS NECESSARY TO SHORE, BRACE, SWING OR RELOCATE A UTILITY, THE UTILITY COMPANY OR ( ) TRANSPORTATION AGENCY.
<br /> DEPARTMENT AFFECTED SHALL BE CONTACTED AND THEIR PERMISSION OBTAINED REGARDING THE 2904 B ON ALL BUILDING SITES IN THE PROPOSED SUBDIVISION.
<br /> O = METHOD TO USE FOR SUCH WORK. 9. SUFFICIENT OIL AND GREASE ABSORBING MATERIALS AND FLOTATION BOOMS SHALL BE MAINTAINED 9. THE CONTRACTOR SHALL INSTALL FILTER FABRIC OVER ALL DRAINAGE STRUCTURES FOR THE
<br /> ON SITE OR READILY AVAILABLE TO CONTAIN AND CLEAN-UP FUEL OR CHEMICAL SPILLS AND DURATION OF CONSTRUCTION AND UNTIL ACCEPTANCE OF THE PROJECT BY THE OWNER. ALL 10. DENSITY TESTS WILL BE MADE AT POINTS APPROXIMATELY ONE FOOT BELOW THE FILL SLOPE
<br /> 5:1 ;
<br />
|