Laserfiche WebLink
H <br /> T <br /> CD <br /> SELF-ADHERING FLASHING AT ALL N T <br /> co <br /> Ln CT) <br /> EXTERIOR HEADS&JAMBS. W CD <br /> C <br /> «' INSTALL PER MANUF. `~�•; ,+ <br /> ;' RECOMMENDATIONS AND AS <br /> w � l__ N <br /> CD <br /> INTERIOR WALL ASSEMBY INTERIOR WALL ASSEMBY =' REQUIRED TO MAINTAIN A o o� <br /> PER FINISHES FLOOR PLAN PER FINISHES FLOOR PLAN WEATHER-TIGHT ENVELOPE(NOT '; a.: ;;, W Q—° <br /> SHOWN FOR CLARITY). <br /> .YY _CD U <br /> y:,' > i�. ' `R 8,.CMU w 0 0 <br /> co <br /> Q <br /> C2 o O� <br /> f,01 01 ` WEATHER BARRIER RE:SPEC. _,, _ ~. '� L_ r <br /> {,�" SECTION 07 25 00 " ; o ti <br /> . T N <br /> 01 01 01 <br /> :]' a: OOH <br /> 00 <br /> Y a HEADER RE:STRUCTURAL <br /> ALUMINUM STOREFRONT RE: ; ��` f_ EXTERIOR STUCCO CLADDING <br /> '' " 718"CEMENT PLASTER 01 MTL SPEC.SECTION 08 4113 ° �:;`;_' :^ RE:SPEC.SECTION 09 24 00 <br /> ':�; LATHE 012-LAYERS GRADE D <br /> PAPER <br /> HEADER RE:STRUCTURAL HEADER RE:STRUCTURAL <br /> FRP FINISH RE:SPEC. <br /> '01 <br /> SECTION 09 77 00 <br /> 1 - , <br /> a, <br /> EXPANDED FLANGE CASING BEAD '` ;`y EXPANDED FLANGEo 01 Store: <br /> ' <br /> - - CASING BEAD <br /> 10 <br /> 26ga GALV.MTL HEAD FLASHING, 1311 E. YOSEMITE AVE. <br /> FRAME AND DOOR FINISH FRAME AND DOOR FINISH PAINT TO MATCH FRAME <br /> PER SHEDULE PER SHEDULE <br /> BACKER ROD&SEALANT COLOR - f _• r` .,` :r GROUT FILLED FRAME MANTECA, CA 95336 <br /> _`` . -'' <br /> �F F-1 TO MATCH FRAME Restaurant #RC529 <br /> FRAME AND DOOR FINISH PER FRAME&DOOR FINISH PER <br /> SCHEDULE SCHEDULE <br /> Professional of Record: NAME <br /> A- H.M. FRAME/ DOOR B-AL. FRAME/DOOR <br /> TYPICAL INTERIOR DOOR HEAD SERVICE DOOR HEAD STOREFRONT DOOR HEAD CORRAL DOOR HEAD <br /> 11 <br /> 3"=1'0" 21 3"=1'-0" 3"=1'-0" 41 3"=1'0" <br /> 31 1 A7.10 FAA <br /> DESIGN <br /> Architectural <br /> Solutions Group <br /> 38 EXECUTIVE PARK, <br /> SUITE 310 <br /> IRVINE, CA 92614 <br /> CONTACT: JEFF LIEDERMAN <br /> (949) 430-7051 <br /> JLIEDERMAN@ MDGINC.COM <br /> WEATHER BARRIER RE:SPEC. y <br /> SECTION 07 25 00 <br /> INTERIOR WALLBOARD FRAME&DOOR FINISH PER <br /> RE:SPEC.SECTION 09 29 00 SCHEDULE <br /> FRP FINISH RE:SPEC. ;r <br /> SECTION 09 77 00 _ <br /> INTERIOR WALL ASSEMBY PER INTERIOR WALL ASSEMBY PER _ a 718"CEMENT PLASTER 01 MTL <br /> FINISHES FLOOR PLAN FINISHES FLOOR PLAN LATHE 012-LAYERS GRADED <br /> PAPER <br /> -' 718"CEMENT PLASTER 01 MTL WEATHER BARRIER RE:SPEC. `> ' <br /> GROUT FILLED FRAME <br /> WOOD STRAP ANCHORS.(3)PER WOOD STRAP ANCHORS.(3)PER LATHE 012-LAYERS GRADE D SECTION 07 25 00- <br /> JAMB JAMB _ PAPER :_�;' } ', EXPANDED FLANGE RC T� <br /> CASING BEAD �Y S. <br /> WOOD STRAP ANCHORS.(3) <br /> _q <br /> PER JAMB =; <br /> 01 <br /> ' HEADER RE:STRUCTURALLL_ <br /> FRAME AND DOOR FINISH PER FRAME AND DOOR FINISH PER a EXPANDED FLANGE CASING BEAD % =,' MASONRY"T"ANCHORS <br /> SCHEDULE SCHEDULE — — ; ; " `�`' @ 16"O.C. <br /> EXPANDED FLANGE CASING BEAD <br /> _ 81,CMU q <br /> BACKER ROD&SEALANT COLOR OF C P� <br /> BACKER ROD&SEALANT COLOR TO TO MATCH FRAME <br /> MATCH FRAME EXTERIOR STUCCO CLADDING Prototype : P4 EXTENDED- HV, SCHEME A <br /> RE:SPEC.SECTION 09 24 00 <br /> FRAME AND DOOR FINISH PER =i , :,�;. �''y:, {�� <br /> SCHEDULE ALUMINUM STOREFRONT RE: _ Prototype Issue Date: 6.29.2020 <br /> `` Design Bulletin Updates: INCLUDED <br /> SPEC.SECTION 08 4113 <br /> Date Issued: Bulletin Number: <br /> A- H.M. FRAME/ DOOR B-AL. FRAME/DOOR I NOV. 2018 1 & 2 <br /> 1ST BLDG. SUBMITTAL <br /> TYPICAL INTERIOR DOOR HEAD SERVICE DOOR JAMB STOREFRONT DOOR JAMB CORRAL DOOR JAMB <br /> 51 3"=1'-0" 61 3"=1'-0" 11 3"=1'-0" 81 3"=1'-0" <br /> REVISIONS: <br /> 1 08-07-20 1st. Bldg. Submittal <br /> FINISHES SIMILIAR AT DOOR HEAD *VERIFY LOCATION OF EXPANSION 2 <br /> CONDITION.PROVIDE(2)2X8 JOINTS,THRESHOLD OVERLAPS 3 <br /> HEADER ONTO ADJACENT SIDEWALK IN 4 <br /> TH WOOD FINISH PER SCHEMESOME LOCATIONS 5 <br /> FRAME AND DOOR„PAINTED PER <br /> PLYWOOD SHEATHING SCHEDULE 6 <br /> 7 <br /> 8 <br /> TILE 01114"TILE BACKER BD. <br /> RE:TO FINISH FOR PLAN A3.20 9 <br /> o <br /> o ALUMINUM STOREFRONT <br /> WOOD STRAP ANCHORS.(3)PER RE:SPEC.SECTION 08 41 13 <br /> JAMB Sheet Title: <br /> RUBBER DOOR SWEEP <br /> ADA COMPLIANT THRESHOLD IN ADA COMPLIANT THRESHOLD <br /> WI CONT.SEALANT.RE:SPEC WI CONT.SEALANT RE:SPEC <br /> FRAME AND DOOR FINISH PER DOOR DETAILS <br /> SCHEDULE <br /> x xDate: <br /> 08.07.2020 <br /> Project Number: RAC19024.0 <br /> 534" <br /> Drawn By: ACX <br /> 4" <br /> " CONCRETE SIDEWALK SLOPE a v ° _ " - CONCRETE SIDEWALK SLOPE RE:CIVIL <br /> a p <br /> RE:CIVIL � - - v " <br /> Sheet Number: <br /> v <br /> y <br /> y_ <br /> e - <br /> FLOORING PER SCHEDULE CI AADIAI/ SCD C!LJCIII II C <br /> A2 . 1 1 <br /> RESTROOM DOOR HEADMAN SERVICE DOOR THRESHOLD STOREFRONT DOOR THRESHOLD AT SIDE ENTRY ALCOVE NOT USED <br /> Q <br /> 913"=1'-0" 3"=1'-0" 3"=1'-0" 3"=1'-0" <br /> 1111 A7.10 121 <br /> m <br />