Laserfiche WebLink
SYMBOL LEGEND 2019 CBC. SECT. 803 WALL FINISH LINE TYPE LEGEND FLOOR FINISH LEGEND GENERAL INSTALLATION NOTES <br /> WALL & CEILING FINISHES <br /> 1 SUB-CONTRACTOR AND GC TO COORDINATE LEVELNESS &TEXTURE OF <br /> O WINDOW DESIGNATION INTERIOR WALLS AND CEILINGS SHALL BE CLASSIFIEDB.1 X-X-X-X— INTERIOR BRICK SLAB WHERE RUBBER FLOORING PRODUCTS ARE TO BE APPLIED. <br /> FOR FIRE PERFORMANCE AND SMOKE DEVELOPMENT IN T-1 CERAMIC FLOOR FIELD TILE CONCRETE FINISH SHALL COMPLY WITH THE FLOORING MANUFACTURERS <br /> ACCORDANCE WITH SECTION 803.1.1 OR 803.1.2, EXCEPT MINIMUM STANDARDS.O H KEY NOTE AS SHOWN IN SECTION 803.2 THROUGH 803.13. EWF-2 ELASTOMETRIC COATING 2 THE SUB-CONTRACTOR SHOULD REQUEST AND RECEIVE WRITTEN <br /> MATERIALS TESTED IN ACCORDANCE WITH SECTION APPROVAL OF AN ACCEPTANCE SAMPLE FROM THE GC PRIOR TO W -:3- <br /> o <br /> 803.1.2 SHALL NOT BE REQUIRED TO BE TESTED IN INSTALLATION. AS REQUESTED, PROVIDE MOCK-UP SAMPLE FOR OWNER v' <br /> 0C111-)DOOR DESIGNATION ACCORDANCE WITH SECTION 803.1.1 T-2 CERAMIC TILE RESTROOM C4) <br /> FRP-1 FIBER-REINFORCED PLASTIC APPROVAL PRIOR TO INSTALLATION. PROVIDE CORE SAMPLE, AND PATCH U <br /> Room name INTERIOR WALL AND CEILING FINISH MATERIALS SHALL BE HOLE TO LIKE NEW, AS REQUESTED. 11C C\J <br /> ROOM NAME&NUMBER CLASSIFIED IN ACCORDANCE WITH ASTM E84 OR UL 723. 3 RUBBER FLOORING SHALL BE ECO-GRIP BY ALLIED INDUSTRIES _ o o <br /> 5555 SUCH INTERIOR FINISH MATERIALS SHALL BE GROUPED IN GS-1 " " " " " " ' " " " " " " " " " " " ' GALVANIZED STEEL WALL END 4 SUB-CONTRACTOR SHALL COMPLY WITH FULL SPECIFICATION SECTION 10 W tf <br /> Q c <br /> THE FOLLOWING CLASSES IN ACCORDANCE WITH THEIR CAPT-3 NOLA BUSINESS NAME TILES 0213 Q Cz <br /> 1 <br /> Ret FLAME SPREAD AND SMOKE DEVELOPED INDEXES PER <br /> 1 CBC 2016, SECTION 803.1.1 P'1 PAINT OVER GYPSUM 5 THE SUB-CONTRACTOR SHALL INSPECT THE FINISHED CONCRETE SLAB FOR 0 0 <br /> DETAIL OR SECTION DESIGNATION COMPLIANCE WITH MANUFACTURER'S MINIMUM STANDARDS AND PROVIDE T <br /> A07.3 WRITTEN ACCEPTANCE OF THE SURFACE PRIOR TO WORK. x `2Q <br /> CLASS A = FLAME SPREAD INDEX 0-25; �7 = 3 <br /> 1 SMOKE-DEVELOPED INDEX 0-450 P-D — — 518" DENSE SHIELD T-4 CERAMIC TILE FLOOR ACCENT 6 INSTALL ONLY IN A WELL VENTILATED AREA TO THE EXTERIOR. c .22 N <br /> CLASS B = FLAME SPREAD INDEX 26-75; <br /> 1 1 INTERIOR ELEVATION MARK SMOKE—DEVELOPED INDEX 0-450 0 <br /> A5.1 00 <br /> CLASS C = FLAME SPREAD INDEX 76-200; STAINLESS STEEL PANEL RUBBER FLOORING KEYNOTES C-0 <br /> SMOKE—DEVELOPED INDEX 0-450 <br /> 1 <br /> EXTERIOR ELEVATION MARK INTERIOR WALL AND CEILING FINISH SHALL HAVE A FLAME STAINLESS STEEL WALL END RUBBER FLOORING <br /> SS-2 RF RF-1 CONTINUE COVE BASE AROUND MOP SINK AT LEVEL HEIGHT. GC AND <br /> SPREAD INDEX NOT GREATER THAN THAT SPECIFIED INOWNER TO PROVIDE STAINLESS STEEL PANELING ABOVE. <br /> 1A4.1 TABLE 803.11 FOR THE GROUP AND DESIGNATED LOCATION. CAP RF-2 CONTINUE COVE BASE AROUND FACE AND INTERIOR OF COOLER AS <br /> T-5 KITCHEN WALL TILE PICTURED. REFER TO DETAIL <br /> OFINISH TAG TABLE 803.11, CBC 2016 _ - - SC SEALED CONCRETE wl SLIP-RESISTANT FINISH RF-4 REAR DOOR THRESHOLD TO CONCEAL JOINT OF RUBBER FLOORING <br /> SPRINKLERED BUILDING T.6 RF-5 REFER TO DETAIL 13/A8.20 Store: <br /> PREP AREA WALL TILE RF-6 STAINLESS STEEL FLOOR FINISH BY COOLER/FREEZER MANUFACTURER <br /> GROUP ROOMS AND ENCLOSED SPACES RF-7 SMOOTH RUBBER FLOORING TO ALIGN WITH EQUIPMENT. DO NOT INSTALL AT 1311 E YOSEMITE AVE. <br /> _ ___ - T-7 ■ • • • • • • • • • • • • • • • • • • • • • ■ T-9A PATIO CONCRETE STAIN w/SLIP-RESISTANT FINISH TRAFFIC AREAS <br /> PAINT TO MATCH -'' 'T' _ <br /> A-2 CLASS C DRINK STATION WALL TILE MANTECA, CA 95336 <br /> EWF-2 _ _ S 0or <br /> B CLASS C <br /> T-$ RESTROOM ACCENT TILE Restaurant #R 529 <br /> '.: C <br /> — S CLASS C SS <br /> STAINLESS STEEL FLOORING AT FREEZER <br /> RESTROOM WALL TILE SMOOTH <br /> Professional of Record: NAME <br /> .k- _ . <br /> W-1 — — — — — — — — — — DOUGLAS FIR 6" PLANKS RUBBER FLOORING SMOOTH FINISH TO COMPLY <br /> RF-S WITH HEALTH DEPT.REQUIREMENTS,INCLUDING <br /> RELATED MATERIALS <br /> DESIGN <br /> A r c h i t e c t u r a <br /> Solutions Group <br /> - 38 EXECUTIVE PARK, <br /> _v_-t;"_ SUITE 310 <br /> -- Fy,_ ?`- ','- IRVINE, CA 92614 <br /> CONTACT: JEFF LIEDERMAN <br /> (949) 430-7051 <br /> JLIEDERMAN@PMDGINC.COM <br /> DUMPSTER ENCLOSURE <br /> 118°=1'-0" T-3 <br /> RF-1 <br /> ISiANY3 NI VH <br /> WASH AREA R 0 TF <br /> Q LEVEL CHANGE REY N �� <br /> E�ERM P � <br /> UN SEX RES P-1 c,2g534 <br /> r1o• 2p2� Q <br /> _ - T-2 T-1 W-1 p,PRw�DATE � <br /> E <br /> SS 1 RESTROOM VESTIBULE s EN o <br /> C13 0 <br /> _ F- = T-8 5'19" T-4112" P-1 - START OF TILE TgTE F P�\� <br /> r MI P-D T-10 T1_ _ <br /> F - <br /> GS-10 ER PICK UP I <br /> F- � � - <br /> SUPPLY 2 A - T-2 W `� Prototype : P4 EXTENDED- HV, SCHEME A <br /> — — SC - - <br /> FRP-1 SC I SS F- F- BROOM CLO ET ; N T-1 Prototype Issue Date: 6.29.2020 <br /> - - � � Design Bulletin Updates: INCLUDED <br /> _ UNISEX RESTROOM'' NISEX RESTROOM ■ F- N <br /> F�- _ UL I DINING ROOM Date Issued: Bulletin Number: <br /> T-8 T-8 I NOV. 2018 1 & 2 <br /> _ SS-1 T-2 ; T_7 = REFER TO SHEET A0.12 <br /> EXTERIOR CORRAL N - - ■ FOR PATIO PLANS <br /> PAINT TO MAT RF T-10 T-1 O RIF T-1 1ST BLDG. SUBMITTAL <br /> SERVING AREA <br /> RF-1 _ _ ■ <br /> B.O.H KITCHEN = SS-2 = ■ STAINLESS STEEL ON THIS SIDE <br /> LL - OF I&KHEAD AT 9".0"AFF. <br /> SC - RF � - I I �; I II — ILII — IIII — II — IIIA' <br /> 0 - <br /> FRP-1 OPEN KITCHEN ' M <br /> 1 - - <br /> - FRP-1 � <br /> f I ABOVE 00 <br /> SS-2 ABOVE _' -_.I <br /> FRP-1 • SS-2 SS-2 • - P-1 REVISIONS: <br /> GS-1 B-1 _ 1 08-07-20 1st. Bldg. Submittal <br /> III II.r /I -; 2 <br /> FRP-1 • - <br /> 0 0 F3 0 - XIX 3 <br /> SUPPLY 1 FRP-1 = - _ _ _ - _ 4 <br /> FRP-1 SC RF-1 RF-1 _ RF-1 RF-1 5 <br /> O _ I I I I � I <br /> SS-1 = �1 •_ - - 7 <br /> III _ W <br /> _ - - T-5 x z 8 <br /> ® d <br /> +� ILII � I I I T-3 <br /> 9 <br /> uL FRP-1 RF S8-2 r ,r <br /> • - RF - 9-1 114 <br /> SC O o o O <br /> P-1 Sheet Title: <br /> MECH.ROOM �� _ � I <br /> GS-1 <br /> I <br /> • _ _ = B.O.H KITC�N SS-2 I _ ABOVE I x N <br /> FRP-1 - 0 RF SS-2 DRIVE-THRU PICK UP z__ <br /> FINISH <br /> ILII ss-2 I ABo E I T-7 = FLOOR PLAN <br /> I ■ <br /> 0 - SS-1 - - FRP-1 T-7 <br /> 1 1 � - - -_ - _ I � - II x ■ ■ P-1 I Date: <br /> MANAGER'S OFFICE _ W DRIVE-THRU PAYS16 RF-1 RF-1 SS-1 _ . 08.07.2020 <br /> FRP-1 - T-5 . . . . . . . . . . Project Number: <br /> RF <br /> I RAC19024.0 <br /> Drawn By: XXX/XXX <br /> I <br /> 2 <br /> FINISH FLOOR PLAN <br /> 114"=1'-0" O FRP-1 <br /> 11A8.31 <br /> Sheet Number: <br /> FAA <br /> PLAN <br /> NORTH <br /> A3 . 20 <br /> J <br /> Q <br /> H <br /> H <br /> L <br /> CIO <br /> V) <br /> N <br />