Laserfiche WebLink
�`�FOR"� CALIFORNIA WATER SERVICE <br />V 9 <br />.I <br />Stockton District 1505 East Sonora Street, Stockton, CA 95205 <br />-1 Tel: (209) 547-7900 <br />TER SERI <br />January 15, 2021 <br />Mrs. Pamela Hurban <br />Northstar Engineering Group Inc <br />Modesto, CA 95354 <br />(emailed to PHurban@nseng.net) <br />Will Serve Letter <br />APN: 173-210-14 <br />Dear Mrs. Hurban : <br />California Water Service Company Stockton District ("Cal Water") has determined that water is available to <br />serve the above -referenced project based on the information provided. Cal Water agrees to operate the water <br />system and provide service in accordance with the rules and regulations of the California Public Utilities <br />Commission (CPUC) and the company's approved tariffs on file with the CPUC. This determination of water <br />availability shall remain valid for two years from the date of this letter. If construction of the project has not <br />commenced within this two year time frame, Cal Water will be under no further obligation to serve the project <br />unless the developer receives an updated letter from Cal Water reconfirming water availability. Additionally, <br />Cal Water reserves the right to rescind this letter at any time in the event its water supply is severely reduced <br />by legislative, regulatory or environmental actions. <br />Cal Water will provide such potable water at such pressure as may be available from time to time as a result <br />of its normal operations per the company's tariffs on file with the CPUC. Installation of facilities through <br />developer funding shall be made in accordance with the current rules and regulations of the CPUC including, <br />among others. Tariff Rules 15 and 16 and General Order 103-A. In order for us to provide adequate water for <br />domestic use as well as fire service protection, it may be necessary for the developer to fund the cost of special <br />facilities, such as, but not limited to, booster pumps, storage tanks and/or water wells, in addition to the cost <br />of mains and services. Cal Water will provide more specific information regarding special facilities and fees <br />after you provide us with your improvement plans, fu -e department requirements, and engineering fees for this <br />project. <br />This letter shall at all times be subject to such changes or modifications by the CPUC as said Commission <br />may, from time to time, require in the exercise of its jurisdiction. <br />If you have any questions regarding the above, please call me at (209)464-8311. <br />Sincer , <br />ret Dahlen <br />Construction Superintendent — Stockton District <br />cc: Ting He — Cal Water Engineering Dept <br />File <br />Quality. Service. Value. <br />calwatencom <br />