My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
14900
>
2800 - Aboveground Petroleum Storage Program
>
PR0516677
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:46:02 PM
Creation date
8/23/2021 10:54:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0516677
PE
2832
FACILITY_ID
FA0000527
FACILITY_NAME
Yogi Bear's Jellystone Park
STREET_NUMBER
14900
Direction
W
STREET_NAME
STATE ROUTE 12
City
LODI
Zip
95242-9514
APN
055-030-15
CURRENT_STATUS
01
SITE_LOCATION
14900 W HWY 12
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
as <br /> donlee Pump company PP <br /> My2825 Railroad Ave. <br /> Ceres,CA 95307 <br /> Lic.#432089 <br /> Date:8-3-2021 <br /> Attn:Tommy Mandleski,Manager <br /> Tower Park Resort <br /> 14900 West May 12 <br /> Lodi, Ca. 95242 <br /> Phone:209-283-1589 <br /> Cell:916-826-1645 <br /> E-mail:tmendleskl®(owerparkresort.cam <br /> Scope of Work <br /> Description of Materials and services to be provided: <br /> 1) Develop Work Plan with Conceptual Drawings to mitigate existing and future Erosion adjacent to <br /> existing 12,000-gallon tank support system. <br /> 2) Provide Plans and Specificabons by a Licensed Structural Engineer to construct the required <br /> Retaining Wall with drainage provision and Identify all materials to be utilized. <br /> 3) Plans shall include but not be limited to the following activities: <br /> a) Construction of one(1)6'X 75' monolithically poured concrete retaining wall with footing and <br /> water drainage system. <br /> b) Construction of one(1) 1.5'X 75'Valley Gutter to divert storm water away from the AST <br /> Supports. <br /> c) Construct Required forms at each support and install self-compacting"Control Density Fill' <br /> (CDF)to replace all native soil displaced by naturally occurring Erosion while preventing future <br /> Occurrences. <br /> d) Fumish,install and grade W Crushed Rock level to the specified Elevation. <br /> If you need anything further,or have any questions,feel free to contact me. <br /> Respectfully, <br /> Richard C. Hamilton <br /> Donlee Pump Company, Inc. <br /> 2825 Railroad Ave. <br /> Ceres, CA 95307 <br /> Ph:209-537-9396 <br /> Fx:209-537-9398 <br /> Cell:209-595-6056 <br /> E-mail richhOdonleeoump.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.