The following is an itemized list of aboveground petroleum storage act violations that <br /> have not been addressed for ESCALON UNIFIED SCHOOL DIST as of September <br /> 29, 2021. <br /> Open violations from August 06, 2021 inspection <br /> Violation#301 -Failed to amend Plan as necessary. <br /> OBSERVATION: The facility failed to amend the Spill Prevention, Control, and Countermeasure(SPCC) Plan within <br /> six months of when there was a change in design, construction, operation, or maintenance,which affects the <br /> facility's discharge potential. <br /> -The 500 gallon used oil aboveground storage tank described as being in the diked area next to the 10,000 gallon <br /> diesel tank is no longer at the site. <br /> -One blue 240 gallon used oil tank was observed outside the diked area and is not included in the SPCC plan <br /> -One grey 115 gallon transmission oil tank and one grey 115 gallon motor oil tank were observed inside the shop <br /> and are not included in the SPCC plan <br /> REGULATION GUIDANCE: (a)Amend the SPCC Plan for your facility in accordance with the general requirements <br /> in § 112.7, and with any specific section of this part applicable to your facility,when there is a change in the facility <br /> design, construction, operation,or maintenance that materially affects its potential for a discharge as described in§ <br /> 112.1(b). Examples of changes that may require amendment of the Plan include, but are not limited to: <br /> commissioning or de commissioning containers; replacement, reconstruction, or movement of containers; <br /> reconstruction, replacement, or installation of piping systems; construction or demolition that might alter secondary <br /> containment structures; changes of product or service; or revision of standard operation or maintenance procedures <br /> at a facility.An amendment made under this section must be prepared within six months, and implemented as soon <br /> as possible, but not later than six months following preparation of the amendment. <br /> (b)Notwithstanding compliance with paragraph (a)of this section, complete a review and evaluation of the SPCC <br /> Plan at least once every five years from the date your facility becomes subject to this part; or, if your facility was in <br /> operation on or before August 16, 2002,five years from the date your last review was required under this part.As a <br /> result of this review and evaluation,you must amend your SPCC Plan within six months of the review to include <br /> more effective prevention and control technology if the technology has been field-proven at the time of the review <br /> and will significantly reduce the likelihood of a discharge as described in§ 112.1(b)from the facility.You must <br /> implement any amendment as soon as possible, but not later than six months following preparation of any <br /> amendment.You must document your completion of the review and evaluation, and must sign a statement as to <br /> whether you will amend the Plan, either at the beginning or end of the Plan or in a log or an appendix to the Plan. <br /> The following words will suffice, "I have completed review and evaluation of the SPCC Plan for(name of facility)on <br /> (date), and will (will not)amend the Plan as a result." <br /> CORRECTIVE ACTION: Ensure that the SPCC Plan has been amended, as required, and it accurately represents <br /> facility design, procedures, and policies currently in place. Provide proof of correction to the EHD. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Page 2 of 8 <br />