Laserfiche WebLink
Pacific Gas and Electric Company'' August 26, 2021 Shirley Romero County of San Joaquin 1810 E Hazelton Ave Stockton, CA 95205 Ref: Gas and Electric Transmission and Distribution Dear Shirley Romero, Plan Review Team Land Management PGEPlanReview@pge.com 6111 Bollinger Canyon Road 3370A San Ramon, CA 94583 Thank you for submitting the 3033 E Waterloo Rd project plans for our review. PG&E will review the submitted plans in relationship to any existing Gas and Electric facilities within the project area. If the proposed project is adjacent/or within PG&E owned property and/or easements, we will be working with you to ensure compatible uses and activities near our facilities. Attached you will find information and requirements as it relates to Gas facilities (Attachment 1) and Electric facilities (Attachment 2). Please review these in detail, as it is critical to ensure your safety and to protect PG&E's facilities and its existing rights. Below is additional information for your review: 1. This plan review process does not replace the application process for PG&E gas or electric service your project may require. For these requests, please continue to work with PG&E Service Planning: https://www.pge.com/en US/business/services/building-and-renovation/overview/overview.page. 2. If the project being submitted is part of a larger project, please include the entire scope of your project, and not just a portion of it. PG&E's facilities are to be incorporated within any CEQA document. PG&E needs to verify that the CEQA document will identify any required future PG&E services. 3. An engineering deposit may be required to review plans for a project depending on the size, scope, and location of the project and as it relates to any rearrangement or new installation of PG&E facilities. Any proposed uses within the PG&E fee strip and/or easement, may include a California Public Utility Commission (CPUC) Section 851 filing. This requires the CPUC to render approval for a conveyance of rights for specific uses on PG&E's fee strip or easement. PG&E will advise if the necessity to incorporate a CPUC Section 851filing is required. This letter does not constitute PG&E's consent to use any portion of its easement for any purpose not previously conveyed. PG&E will provide a project specific response as required. Sincerely, Plan Review Team Land Management PG&E Gas and Electric Facilities Page 1