My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014320
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
3033
>
2600 - Land Use Program
>
PA-2100157
>
SU0014320
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2022 1:01:50 PM
Creation date
8/26/2021 9:18:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014320
PE
2631
FACILITY_NAME
PA-2100157
STREET_NUMBER
3033
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205-
APN
11928004
ENTERED_DATE
8/3/2021 12:00:00 AM
SITE_LOCATION
3033 E WATERLOO RD
RECEIVED_DATE
8/24/2021 12:00:00 AM
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and Electric Company·· 8. Streets and Roads: Access to facilities must be maintained at all times. Street lights may be allowed in the fee strip(s) and/or easement(s) but in all cases must be reviewed by PG&E for proper clearance. Roads and utilities should cross the transmission easement as nearly at right angles as possible. Road intersections will not be allowed within the transmission easement. 9. Pipelines: Pipelines may be allowed provided crossings are held to a minimum and to be as nearly perpendicular as possible. Pipelines within 25 feet of PG&E structures require review by PG&E. Sprinklers systems may be allowed; subject to review. Leach fields and septic tanks are not allowed. Construction plans must be submitted to PG&E for review and approval prior to the commencement of any construction. 10. Signs: Signs are not allowed except in rare cases subject to individual review by PG&E. 11. Recreation Areas: Playgrounds, parks, tennis courts, basketball courts, barbecue and light trucks (pickups, vans, etc.) may be allowed; subject to review of plans. Heavy equipment access to PG&E facilities is to be maintained at all times. Parking is to clear PG&E structures by at least 10 feet. Protection of PG&E facilities from vehicular traffic is to be provided at developer's expense AND to PG&E specifications. 12. Construction Activity: Since construction activity will take place near PG&E's overhead electric lines, please be advised it is the contractor's responsibility to be aware of, and observe the minimum clearances for both workers and equipment operating near high voltage electric lines set out in the High-Voltage Electrical Safety Orders of the California Division of Industrial Safety (https://www.dir.ca.gov/Title8/sb5g2.html), as well as any other safety regulations. Contractors shall comply with California Public Utilities Commission General Order 95 (http://www.cpuc.ca.gov/gos/G095/go 95 staiiup page.html) and all other safety rules. No construction may occur within 25 feet of PG&E's towers. All excavation activities may only commence after 811 protocols has been followed. Contractor shall ensure the protection of PG&E's towers and poles from vehicular damage by (installing protective barriers) Plans for protection barriers must be approved by PG&E prior to construction. 13. PG&E is also the owner of distribution facilities throughout many of the areas within the state of California. Therefore, any plans that impact PG&E's facilities must be reviewed and approved by PG&E to ensure that no impact occurs that may endanger the safe and reliable operation of its facilities. PG&E Gas and Electric Facilities Page 6
The URL can be used to link to this page
Your browser does not support the video tag.