Laserfiche WebLink
ABBREVIATIONS ELECTRICAL SYMBOL LEGEND SECURITY SYSTEM NOTES TELEPHONE SYSTEM NOTES GENERAL ELECTRICAL NOTES <br /> AFF ABOVE FINISHED FLOOR 0 STARBUCKS CONTRACTS DIRECTLY WITH SECURITY VENDOR TO SUPPLY IF ADDITIONAL TELEPHONE LINES ARE REQUIRED BEYOND THE 1. THE ELECTRICAL CONTRACTOR SHALL COORDINATE ELECTRICAL <br /> AHJ AUTHORITIES HAVING JURISDICTION J JUNCTON BOX RECEPTACLE: DUPLEX STANDARD SINGLE LINE SUCH AS FOR A FIRE ALARM THE GENERAL <br /> AND INSTALL THE SECURITY SYSTEM. CONTRACTOR TO SCHEDULE ( ) WORK AND SPECIFICATIONS WITH OTHER TRADES. THE <br /> APPROX APPROXIMATE INSTALLATION OF SECURITY SYSTEM FOR FOUR (4)TIMES; CONTRACTOR SHALL CONTACT STARBUCKS PRIOR TO BEGINNING ARCHITECTURAL DRAWINGS AND SPECIFICATIONS SHALL TAKE <br /> 1. MEET TO PLAN SECURITY CABLE PULL WITH SECURITY CABLE CONSTRUCTION TO ORDER THE ADDITIONAL TELEPHONE LINE(S). PRECEDENCE OVER ALL OTHER DRAWINGS. DO NOT SCALE <br /> BLDG BUILDING $ SWITCH RECEPTACLE-. DUPLEX- INSTALLER PRIOR TO DRYWALL INSTALLATION. REPORT ANY TELEPHONE INSTALLATION ISSUES IMMEDIATELY TO DISTANCES OFF THE ELECTRICAL DRAWINGS; USE ACTUAL <br /> n INDIVIDUAL BRANCH CIRCUIT 2, SECURITY CABLE INSTALLER PULLS SECURITY CABLES, MOUNTS STARBUCKS. BUILDING DIMENSIONS. OVERALL CASEWORK COMPONENT <br /> CKT CIRCUIT PANEL, KEYPAD AND SENSORS. DIMENSIONING ON ELECTRICAL DETAILS ARE SHOWN FOR <br /> CLG CEILING $3 THREE-WAY SWITCH RECEPTACLE: QUAD 3. SECURITY EQUIPMENT INSTALL OF CAMERA, NVR AND MONITOR. CONFIRM PRIOR TO BEGINNING CONSTRUCTION THAT THERE ARE REFERENCE AND COORDINATION ONLY. SEE SPECIFICATION <br /> CM STARBUCKS CONSTRUCTION MANAGER 4. SECURITY MONITORING COMPANY TO BRING SYSTEM ONLINE AND EXISTING, WORKING TELCO FACILITIES TO THE BUILDING OR THAT SHEETS FOR ELECTRICAL SPECIFICATIONS <br /> CONST CONSTRUCTION TRAIN PARTNERS AFTER POS INSTALL. LANDLORD HAS FURNISHED AND INSTALLED ONE (1)2" (51MM) MIN. ©2017 STARBUCKS COFFEE COMPANY <br /> CW COLD WATER MOTION (OCCUPANCY) RECEPTACLE- QUAD - (ENTRANCE) CONDUIT INCLUDING PULL STRING FROM TELCO STREET 2. ALL ELECTRICAL SYSTEMS SHALL BE TESTED FOR PROPER <br /> CXA COMMISSIONING AGENT M SENSOR SWITCH INDIVIDUAL BRANCH CIRCUIT SECURITY VENDOR REQUIRES A MINIMUM TWO (2)WEEKS LEAD TIME FOR FEED LINE TO THE BUILDING AS IDENTIFIED BY THE PHONE COMPANY. OPERATION. BALANCE ALL BRANCH CIRCUIT LOADS BETWEEN <br /> EACH INSTALLATION. SECURITY VENDOR WILL COORDINATE REGIONAL NOTIFY STARBUCKS CONSTRUCTION MANAGER IMMEDIATELY IF THE PHASES OF THE SYSTEM WITHIN 10% OF THE HIGHEST PHASE STARBUCKS COFFEE <br /> DLG DGHRS WITHIN DAYLIGHT ZONE SWITCHBACK RECEPTACLE: HIGH VOLTAGE INSTALLERS. ALL ADDITIONAL EXPENSES INCURRED DUE TO THE FACILITIES OR CONDUIT AND PULL STRING ARE NOT INSTALLED. LOAD IN EACH PANEL BOARD. COMPANY <br /> mm CONTRACTOR'S FAILURE TO SCHEDULE ACCORDINGLY WILL BE THE <br /> DM STARBUCKS DESIGN MANAGER RESPONSIBILITY OF THE CONTRACTOR. GENERAL CONTRACTOR IS TO ENSURE THAT THERE IS A 2" (51 MM) MIN. 3. THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR DE- 2401 UTAH AVENUE SOUTH <br /> DN DOWN CONDUIT WITH PULL STRING FROM THE DATA RACK TO THE DEMARC ENERGIZING CIRCUITS IN DEMOLITION AREAS TO INSURE A SAFE SEATTLE, WASHINGTON 98134 <br /> DTL DETAIL - TELEPHONE ® RECEPTACLE: FLOOR DUPLEX (TELCO TO CUSTOMER HAND OFF EQUIPMENT)WHEN THE DEMARC IS CONDITION. ELECTRICAL DEVICES AND ASSOCIATED WIRING (206) 318-1575 <br /> DWG(S) DRAWING(S) MORE THAN 10' FROM THE DATA RACK. DISTANCES LESS THAN 10'WILL LOCATED WITHIN THE DEMOLITION AREA THAT WILL NO LONGER <br /> CARBON MONOXIDE NOT REQUIRE CONDUIT. BE USED SHALL BE REMOVED AND PROPERLY DISPOSED OF AT THESE DRAWINGS AND SPECIFICATIONS ARE <br /> EA EACH OT THERMOSTAT GROUNDING ELECTRODE CONTRACTORS EXPENSE UNLESS OTHERWISE NOTED. CONFIDENTIAL AND SHALL REMAIN THE SOLE <br /> EC ELECTRICAL CONTRACTOR CONNECTION (CO) DETECTOR NOTES PROVIDE A 3-POSITION GROUND LUG, GROUNDED WITH#6 AWG PROPERTY OF STARBUCKS CORPORATION, <br /> ECP EQUIPMENT CONTROL PAC GROUND WIRE, IF REQUIRED BY TELEPHONE COMPANY. 4. THE ELECTRICAL CONTRACTOR SHALL SCHEDULE ALL ELECTRICAL WHICH IS THE OWNER OF THE COPYRIGHT IN <br /> EG EXHAUST GRILLE SYSTEM OUTAGES WITH THE GENERAL CONTRACTOR AND <br /> ELEC ELECTRICAL SO THERMOSTAT SENSOR NL NIGHTLIGHTING 24HR/DAY COORDINATE INSTALLATION OF CARBON MONOXIDE (CO) DETECTOR ALL TELEPHONE/NETWORK CABLING IS THE SCOPE OF WORK OF THE LANDLORD AT LEAST 24 HOURS IN ADVANCE. UNLESS APPROVED THIS WORK. THEY SHALL NOT <br /> EM EMERGENCY DEVICE(S)AND LOW VOLTAGE WIRING WITH STARBUCKS SECURITY TELEPHONE/NETWORK CABLING VENDOR. OTHERWISE ALL OUTAGES SHALL OCCUR BETWEEN 11:00PM AND REPRODUCED (IN WHOLE OR IN PART),, SHARED <br /> WITH THIRD PARTIES OR USED IN ANY MANNER <br /> EMS ENERGY MANAGEMENT SYSTEM VENDOR FOR NEW STORES, RELOCATIONS AND MAJOR RENOVATIONS, IF 5:00AM. ON OTHER PROJECTS OR EXTENSIONS TO THIS <br /> EXIST EXISTING [ DIMMER SWITCH PE PHOTOELECTRIC CELL IN VENDOR SCOPE. VENDOR TO PROVIDE AND INSTALL DEVICE(S) IN BOH PROJECT WITHOUT THE PRIOR WRITTEN <br /> EXT EXTERIOR AND FOH (AS APPLICABLE PER STARBUCKS STANDARDS). 5. ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL ALL CONSENT OF STARBUCKS CORPORATION. <br /> ® POS \ DATA LINE NOTES NECESSARY CONDUIT AND J-BOXES TO SUPPORT A COMPLETE THESE DRAWINGS AND SPECIFICATIONS ARE <br /> F&I FURNISH & INSTALL RECEPTACLE: DATA SPEAKER SECURITY, PHONE, POS AND DATA SYSTEMS. SEE MANAGER INTENDED TO EXPRESS DESIGN INTENT FOR A <br /> FLR FLOOR WORKSTATION AND BAR POINT OF SALE (POS) PROTOTYPICAL STARBUCKS STORE (WHICH IS <br /> FT FOOT/FEET FIRE ALARM SYSTEM NOTES POWER/TELECOM/SECURITY DIAGRAM. COORDINATE ALL DEVICE SUBJECT TO CHANGE AT ANYTIME)AND DO <br /> STARBUCKS CONTRACTS DIRECTLY WITH THE DATA CABLING VENDOR LOCATIONS AND MOUNTING HEIGHTS WITH SECURITY VENDOR <br /> RACEWAY CONCEALED w WIFI ACCESS POINT NOT REFLECT ACTUAL SITE CONDITIONS. <br /> GC GENERAL CONTRACTOR TO SUPPLY AND INSTALL CATEGORY 5e (CAT5e) LAN CABLE AND PRIOR TO ROUGH-IN. PROVIDE END-TO-END PULL STRINGS IN ALL NEITHER PARTY SHALL HAVE ANY OBLIGATION <br /> IN CEILING OR WALL. (POS) CONDUITS. LABEL EACH END OF THE PULL STRING WITH CONDUIT <br /> GFCI GROUND FAULT CIRCUIT INTERRUPTER IF STARBUCKS IS REQUIRED TO PROVIDE A FIRE ALARM AND/OR FIRE CONNECTORS FOR THE POINT OF SALE POS SYSTEMS. CONTRACTOR NOR LIABILITY TO THE OTHER (EXCEPT STATED <br /> GND GROUND HASH MARKS INDICATE ALARM MONITORING AND/OR PHONE LINES FOR A FIRE ALARM, AS TO SCHEDULE INSTALLATION OF DATA CABLING WITH DATA CABLING SYSTEM "SECURITY" AND DESTINATION "CAFE", "FRONT BAR", <br /> NUMBER OF WIRES. SPECIFIED IN THE LEASE AGREEMENT, THE CONTRACTOR IS TO NOTIFY VENDOR. DATA CABLING VENDOR REQUIRES A LEAD TIME FOR ("SECURITY") ( ABOVE) UNTIL A WRITTEN AGREEMENT IS <br /> #12 AWG WIRE UNLESS ETC.). PROVIDE INSULATED BUSHINGS ON ALL STUBBED-UP AND FULLY EXECUTED BY BOTH PARTIES. <br /> HR HOUR GNOC IMMEDIATELY THAT FIRE ALARM LINES ARE NEEDED. STARBUCKS INSTALLATION. DATA CABLING VENDOR WILL COORDINATE REGIONAL EXPOSED CONDUIT ENDS. <br /> HVAC HEATING, VENTILATION, AIR CONDITIONING OTHERWISE NOTED. PREFERRED FIRE ALARM SERVICE PROVIDER, STANLEY, IS TO BE INSTALLERS. <br /> HW HOT WATER <br /> TWO WIRES PLUS CONTACTED BY THE CONSTRUCTION MANAGER TO INSTALL FIRE ALARM 6. ELECTRICAL CONTRACTOR SHALL COORDINATE WITH THE ARCHITECT OF RECORD <br /> GROUND IF NO HASH <br /> MARKS SHOWNLONG PANEL AND/OR MONITORING SERVICE AS REQUIRED. AT THE START OF CONSTRUCTION, STARBUCKS CONSTRUCTION GENERAL CONTRACTOR TO PATCH AND REPAIR ALL EXISTING mcg architecture <br /> . <br /> LCP LIGHTING CONTROL PANEL MANAGER SCHEDULES DELIVERY OF CASH REGISTER/MANAGER'S WALLS, FLOORS, CEILINGS OR OTHER SURFACES IDENTIFIED TO <br /> LL LANDLORD HASH MARK DENOTES WORKSTATION EQUIPMENT AND INSTALLATION BY A POS INSTALL REMAIN THAT MAY BECOME DAMAGED DURING THE COURSE OF <br /> U C U C <br /> LS LIGHT SENSOR PHOTOCELL NEUTRAL. TECHNICIAN FOR ONE (1) MONTH PRIOR TO STORE OPEN. WORK. > o <br /> LV LOW VOLTAGE GROUND WIRE NOT ENERGY MANAGEMENT SYSTEM (EMS) CONTRACTOR TO VERIFY DELIVERY SCHEDULE TWO (2)WEEKS PRIOR C—) <br /> SHOWN. TO DELIVERY AND INSTALLATION DATE. EQUIPMENT IS SHIPPED 7. EXPOSED/SURFACE MOUNTED CONDUITS SHALL ONLY BE <br /> MAX MAXIMUM DIRECTLY TO THE STORE. CONTRACTOR TO ACCEPT POS EQUIPMENT ALLOWED WHERE NECESSARY IN EXPOSED CEILING AREAS. IF `n <br /> oil <br /> MC MECHANICAL CONTRACTOR THE GENERAL CONTRACTOR SHALL CONTACT AND COORDINATE DELIVERY. DO NOT REFUSE DELIVERY. CONDUITS NEED TO BE SURFACE MOUNTED TO WALLS, <br /> MDP MAIN DISTRIBUTION PANEL INSTALLATION OF<INSERT LCP PRODUCT>AND<INSERT EMS SYSTEM> COORDINATE WITH STARBUCKS CONSTRUCTION MANAGER FOR 15635 Alton Parkway, Suite 100, Irvine, CA 92618 <br /> WITH EMS INSTALLER. PRIOR TO LAST WEEK OF CONSTRUCTION. P: 949.553.1117 F:949.474.7056 <br /> MECH MECHANICAL DATA CABLING TECHNICIAN TO PROVIDE ALL CAT5e LAN CABLING AND FURNISH AND INSTALL TEMPORARY THERMOSTATS AND SENSORS, AND APPROVAL. <br /> MEP MECHANICAL, ELECTRICAL, AND PLUMBING CONNECTORS FROM ALL DESIGNED AND FUTURE CASH REGISTER <br /> MFG MANUFACTURER ROUTE ALL LOW VOLTAGE WIRING THROUGH EC PROVIDED CONDUITS LOCATIONS, MANAGER'S WORKSTATION, ALL OTHER NETWORKED 8. VERIFY LOCATION OF ALL OUTLETS AND SWITCHES WITH <br /> (COORDINATE WITH ELECTRICAL). EQUIPMENT CUP LABELERS, CLOVER, BUMP BAR, ETC... AND <br /> MIN MINIMUM ( ) ARCHITECTURAL DRAWINGS, INTERIOR DETAILS, FINISH ACTS <br /> WIRELESS ACCESS POINT TO THE DATA RACK AREA. CONTRACTOR IS SCHEDULES, GENERAL CONTRACTOR, EQUIPMENT VENDORS, rr»oQROFESS/p,�,gttLt <br /> NL NIGHTLIGHT FURNISH AND INSTALL RACEWAYS WITH PULL STRINGS AND TO HAVE CONDUIT WITH PULL STRING IN PLACE FOR ALL CABLE RUNS STARBUCKS AND EXISTING SITE CONDITIONS. VERIFY FINAL DOOR <br /> NTS NOT TO SCALE JUNCTION BOXES FOR THERMOSTAT(S)AND SENSOR(S). PRIOR TO CABLE INSTALL DATE. ENGINEERING <br /> HINGE LOCATION PRIOR TO SWITCH INSTALLATION AND ADJUST <br /> SWITCH LOCATION IF NEEDED. DO NOT MOUNT 400NMcCarthy Blvd. 1,,, mi <br /> SET RESTROOM OCCUPANCY SENSOR TO 15 MINUTE 'ON' DURATION Suite 250,Milpitas,CA 95035 i N 15130 A r <br /> OCP OVERCURRENT PROTECTION STARBUCKS NEW STORE GROUP IS RESPONSIBLE FOR COORDINATING RECEPTACLES/SWITCHES IN LOCATIONS THAT WOULD CONFLICT $ Esp06/30 2 r <br /> IN SINGLE OCCUPANT RESTROOM AND TO 20 MINUTE 'ON' DURATION STARBUCKS POS SYSTEMS DELIVERY AND INSTALLATION WITH THE POS ph:(408)522-5255 ttt *rrr <br /> IN MULTI-OCCUPANT RESTROOM UNLESS JURISDICTION WITH MIRRORS, SEAMS OF WALLS, WAINSCOTS, TILE fx:(408)522-5260 tttsj' �4CrRxGP a`Prr <br /> REF REFERENCE VENDOR. THIS GROUP MAY BE CONTACTED AT: TRANSITIONS, ETC... info@acies.net tti1E pF CA1xFo��r <br /> REQ('D) REQUIRE(D) REQUIREMENTS STATE OTHERWISE. NEWSTORES@STARBUCKS.COM . Copyright©2021 <br /> REV REVISION <br /> COORDINATE WITH DRAWINGS AND LCP VENDOR FOR DEVICE <br /> SF SQUARE FEET LOCATIONS. VENDOR SHALL COMMISSION CONTROLS. <br /> SPT SHEET COMMUNICATION SYSTEM NOTES GENERAL NOTES <br /> SPECS SPECIFICATION(S) THE GENERAL CONTRACTOR IS TO COMPLETE FINAL CONNECTION <br /> SST STAINLESS STEEL AFTER DATA RACK AND NETWORK INSTALLATION. THE GENERAL <br /> CONTRACTOR IS TO CONTACT LCP VENDOR TO VERIFY SYSTEM CONFIRM PRIOR TO BEGINNING CONSTRUCTION THAT THE LANDLORD HAS SCOPE <br /> TEL TELEPHONE OPERATION AND TROUBLESHOOT IF REQUIRED. FURNISHED AND INSTALLED ONE (1)ADDITIONAL 2" (51 MM) (ENTRANCE) THE INTENT OF THE SPECIFICATION AND THE DRAWINGS IS TO PROVIDE <br /> TEMP TEMPORARY CONDUIT INCLUDING PULL STRING (FOR A TOTAL OF TWO (2)) FROM THE A COMPLETE AND FULLY OPERATIONAL ELECTRICAL SYSTEM. THE <br /> TYP TYPICAL STREET FEED TO THE BUILDING AS IDENTIFIED BY THE INTERNET SERVICE ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL ALL LABOR, <br /> PROVIDER. MATERIAL, AND EQUIPMENT NECESSARY TO COMPLETE THE <br /> LINO UNLESS NOTED OTHERWISE CONTROLS AND OPERATION ELECTRICAL WORK. <br /> WH WATER HEATER SITE EXAMINATION <br /> WP WEATHER PROOF THE GENERAL CONTRACTOR SHALL CONTACT AND COORDINATE THE ELECTRICAL CONTRACTOR SHALL THOROUGHLY EXAMINE ALL � <br /> INSTALLATION OF LIGHTING CONTROL PANEL WITH "LUTRON" PRIOR WIRELESS NETWORK NOTES AREAS WHERE EQUIPMENT, CONDUIT, AND WIRING WILL BE INSTALLED L <br /> TO THE LAST WEEK OF CONSTRUCTION. AND WILL REPORT ANY CONDITION THAT, IN HIS OPINION, PREVENTS (3) CIO <br /> FURNISH AND INSTALL RACEWAYS WITH PULL STRINGS AND JUNCTION CABLING FOR INTERNET SERVICE SHALL BE FURNISHED AND INSTALLED THE PROPER INSTALLATION OF THE ELECTRICAL WORK. > O <br /> BY THE VENDOR FOR FIBER OR BROADBAND CONNECTIONS. T1 AND <br /> BOXES FOR THERMOSTAT(S)AND SENSOR(S). STANDARDS <br /> ETHERNET EXTENSION CABLING IS PROVIDED BY THE STARBUCKS -0 (� <br /> EQUIPMENT AND MATERIALS SHALL CONFORM WITH APPROPRIATE (n LID (� <br /> SET RESTROOM OCCUPANCY SENSOR TO 15 MINUTE 'ON' DURATION IN (TELEPHONE/ NETWORK) CABLING VENDOR. COORDINATE WITH W <br /> SINGLE OCCUPANT RESTROOM AND TO 20 MINUTE 'ON' DURATION IN STARBUCKS. O PROVISIONS OF CSA, ULC, NEC, ASTM, ETL, NEMA, ANSI, AS <br /> APPLICABLE TO EACH INDIVIDUAL UNIT OR ASSEMBLY. � � i m <br /> MULTI-OCCUPANT RESTROOM UNLESS JURISDICTION REQUIREMENTS 06 <br /> STATE OTHERWISE. CODES Z Q > U O <br /> COORDINATE WITH DRAWINGS AND LCP VENDOR FOR DEVICE ALL WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH ALL H � <br /> 0 a-+ <br /> LOCATIONS. VENDOR SHALL COMMISSION CONTROLS. APPLICABLE PROVINCIAL AND LOCAL CODES AND ORDINANCES. IN CASE LU (, W U �' <br /> MUSIC SYSTEM NOTES OF CONFLICT BETWEEN THE DRAWINGS AND SPECIFICATIONS AND THE ) U <br /> CODES, THE HIGHEST STANDARD SHALL APPLY. ELECTRICAL O L O <br /> THE GENERAL CONTRACTOR IS TO COMPLETE FINAL CONNECTION AFTER CONTRACTOR SHALL SATISFY CODE REQUIREMENTS AS A MINIMUM 0� lcl� C0 O <br /> DATA RACK AND NETWORK INSTALLATION. THE GENERAL CONTRACTOR MOUNT OWNER FURNISHED SPEAKERS WHERE SHOWN ON INTERIOR STANDARD WITHOUT ANY EXTRA COST TO STARBUCKS. W d Lo ~ U <br /> IS TO CONTACT LCP VENDOR TO VERIFY SYSTEM OPERATION AND REFLECTED CEILING PLANS AND IN COORDINATION WITH ALL PLANS, <br /> TROUBLESHOOT IF REQUIRED. DETAILS AND MANUFACTURER'S INSTALLATION REQUIREMENTS. PERMITS AND FEES STORE #: 8981 <br /> INSTALL AND CONNECT OWNER FURNISHED WIRING SYSTEM BETWEEN THE ELECTRICAL CONTRACTOR SHALL PROCURE AND PAY FOR ALL <br /> ALL SPEAKERS AND THE OWNER PROVIDED MUSIC SYSTEM. SET PERMITS, FEES, AND INSPECTIONS NECESSARY TO COMPLETE THE PROJECT #: 23870-070 <br /> WATTAGE TAP ON EACH SPEAKER'S ROTARY SWITCH PER TAP SETTINGS ELECTRICAL WORK. <br /> NOTED ON PLANS. PROFILE TYPE: <br /> WARRANTY ISSUE DATE: 03-05-2021 <br /> THE ELECTRICAL CONTRACTOR SHALL UNCONDITIONALLY WARRANT PROGRAM MANAGER: <br /> ALL WORK TO BE FREE OF DEFECTS IN MATERIAL AND WORKMANSHIP STORE DESIGNER: JESSICA RAMOS <br /> FOR A PERIOD OF ONE (1)YEAR FROM THE DATE OF FINAL ACCEPTANCE LEED®AP: N/A <br /> SCOPE OF WORK BY STARBUCKS AND WILL REPAIR OR REPLACE ANY DEFECTIVE WORK <br /> PROMPTLY AND WITHOUT CHARGE AND RESTORE ANY OTHER EXISTING CHECKED BY: <br /> WORK DAMAGED IN THE COURSE OF REPAIRING DEFECTIVE MATERIALS MCG PROJECT#: <br /> - COMPLETE INTERIOR LIGHTING AND LIGHTING CONTROLS CHANGES. AND WORKMANSHIP. MCG PROJ. MANAGER: HT <br /> - POWER CHANGES FOR NEW FOOD SERVICE EQUIPMENT IN THE BAR <br /> - NEW EMERGENCY AND EXIT LIGHTING. LEED MCG PROJ. SPECIALIST: TG <br /> -ALL PANELS ARE EXISTING TO REMAIN. ALL WORK, MATERIALS AND EQUIPMENT SHALL MEET LEED <br /> REQUIREMENTS &CODE. IN CASE OF CONFLICT, THE HIGHER Revision Schedule <br /> STANDARD SHALL APPLY. <br /> Rev Date By Description <br /> LANDLORD REQUIREMENTS <br /> PRIOR TO BID: THE CONTRACTOR SHALL COORDINATE WITH LANDLORD/ <br /> BUILDING OWNER FOR ANY CONSTRUCTION REQUIREMENTS/ SHEET TITLE: <br /> SPECIFICATIONS. IF LANDLORD/ BUILDING OWNER DOES HAVE ELECTRICAL NOTES <br /> REQUIREMENTS, CONTRACTOR SHALL BECOME COMPLETELY FAMILIAR <br /> WITH REQUIREMENTS/SPECIFICATIONS AND ADHERE TO THEM. WHERE <br /> LANDLORD/ BUILDING OWNER REQUIREMENTS ARE MORE STRINGENT <br /> THAN SHOWN IN THESE PLANS (IN THE OPINION OF THE ENGINEER). SCALE: AS SHOWN <br /> LANDLORD/ BUILDING OWNER REQUIREMENTS SHALL GOVERN. <br /> SHEET NUMBER: <br /> E-001 <br />