My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014388
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30131
>
2600 - Land Use Program
>
PA-2100025
>
SU0014388
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2021 1:36:01 PM
Creation date
8/31/2021 8:31:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014388
PE
2634
FACILITY_NAME
PA-2100025
STREET_NUMBER
30131
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95377-
APN
25313002
ENTERED_DATE
8/30/2021 12:00:00 AM
SITE_LOCATION
30131 S MACARTHUR DR
RECEIVED_DATE
8/27/2021 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BENCHMARM n <br /> 1 RESOURCES 0 r 5 <br /> February 4, 2021 <br /> Giuseppe Sanfilippo <br /> San Joaquin County, Community Development Department <br /> 1810 East Hazelton Ave <br /> Stockton, CA 95205 <br /> SUBJECT CEMEX KERLINGER <br /> PORTABLE CRUSHER APPLICATION AND PROJECT DESCRIPTION <br /> Mr . Sanfilippo, <br /> As previously discussed, CEMEX Construction Materials Pacific, LLC ( CEMEX ) is <br /> requesting the ability to install and operate a portable recycled concrete processing <br /> facility on the CEMEX Kerlinger mine site ( QX- 80 - 001 ; CA Mine Id . # 91 - 39 - 0015 ) . A Site <br /> Improvement Plan application is included as Attachment A, " Site Improvement Plan <br /> Application, " to this cover letter . The following provides a description of the proposed <br /> portable recycled concrete processing facility to supplement the attached application . <br /> CEMEX is requesting the ability to temporarily install and operate a portable recycled <br /> concrete processing facility within the existing aggregate processing and ready-mix <br /> concrete production areas of the CEMEX Kerlinger mine site . As shown on Attachment <br /> B . " Site Plan, " the portable processing facility would be in one of two areas of the site <br /> where existing recycled material stockpiles are stored . The portable processing facility <br /> would include two jaw crushers, two impact crushers, one track stacker conveyor, and <br /> one radial stacker . In total, the portable processing equipment footprint would not <br /> exceed two acres and have a maximum height of 30 feet ( significantly shorter than <br /> existing permitted stationary processing facilities and associated infrastructure . ) As <br /> shown in Attachment C, " Equipment Types and Specifications, " the equipment is track- <br /> mounted or wheeled and does not require any concrete footings, foundations, or <br /> anchoring to install and operate . As a result, the portable processing equipment would <br /> not result in any new surface disturbance or infrastructure improvements at the site . <br /> Operationally, the portable processing facility would operate for a period of 3045 days <br /> twice a year after which time the equipment would be removed from the site . The <br /> portable processing facility would crush, sort, and stockpile the recycled materials <br /> similar to existing stationary processing facilities . The processed material would <br /> 2515 East Bidwell Street • Folsom , CA 95630 • 916 . 983 . 9193 <br /> benchmarkresources . com <br />
The URL can be used to link to this page
Your browser does not support the video tag.