Laserfiche WebLink
Underground Storage Tank <br /> Designated UST Operator-sual Inspection Report <br /> 10. TESTING AND MAINTENANCEYes No NA Date last <br /> Has monitoring system certification been completed within the past performed <br /> 12 months? 11-19-202( <br /> Has spill container testing been completed within the past y <br /> 12 months? 11-19-202( <br /> Has overfill prevention equipment inspection been completed within [� <br /> the past 36 months? 11-19-202( <br /> Has secondary containment testing been completed within the past <br /> 36 months? <br /> Has tank tightness testing been completed within required 0 (� <br /> timeframes? <br /> Has line tightness testing been completed within the required <br /> timeframes? <br /> Other Test / Maintenance: 10-2-2020 <br /> Other Test / Maintenance: <br /> f ® 493=2018 <br /> Other Test / Maintenance: <br /> 11- FACILITY EMPLOYEE TRAINING Yes No <br /> Have all individuals performing facility employee duties received the required facility <br /> employee training within the past 12 months? <br /> 13. COMMENTS <br /> This section may be used to record comments or observations that are not current compliance <br /> deficiencies. <br /> All answers marked "No"must be described by the designated UST operator in Section 3. <br /> Page 4 of 4 <br />