My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1916
>
2300 - Underground Storage Tank Program
>
PR0527728
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 10:01:48 AM
Creation date
9/1/2021 8:43:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0527728
PE
2351
FACILITY_ID
FA0018792
FACILITY_NAME
MARCH AND BIANCHI INC
STREET_NUMBER
1916
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09603029
CURRENT_STATUS
01
SITE_LOCATION
1916 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Overfill Prevention Equipment Ins ection Report Form <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (One OPE per column) 87 91 DSL <br /> Are both vent and tank riser piping E Yes E Yes E Yes ❑ Yes <br /> secondarily contained? ❑ No ❑ No ❑ No ❑ No <br /> OPE Model OPW OPW OPW <br /> Tank Manufacturer Xerxes Xerxes Xerxes <br /> E Shuts off E Shuts off E Shuts off ❑ Shuts off <br /> Flow Flow Flow Flow <br /> What is the OPE response when ❑ Restricts ❑ Restricts ❑ Restricts ❑ Restricts <br /> activated? Flow Flow Flow Flow <br /> (Check a//that app/y) F1Audible ❑ Audible ❑ Audible ElAudible <br /> Alarm Alarm Alarm Alarm <br /> ❑Visual ❑Visual ❑Visual ❑Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent <br /> E] Yes E] Yes ❑ Yes El Yes <br /> piping that may interfere with the OPE <br /> operation? E No E No E No E] No <br /> At what level in the tank is the OPE set to 106 1/4 105 3/4 105 — - <br /> activate? (Inches from bottom of tank) <br /> What is the percent capacity of the tank in 95% 95% 95% <br /> which the OPE activates? <br /> Is the OPE in proper operating condition <br /> to respond when the stored substance ® Yes ® Yes ® Yes ❑ Yes <br /> reaches the designated regulatory level? ❑ No ❑ No ❑ No ❑ No <br /> 7. SUMMARY OF TESTING RESULTS _ <br /> OPE Inspection Results ® Pass ® Pass E Pass s F- Pass <br /> ❑ Fail ❑ Fail ❑ Fail ❑ Fail <br /> 8. COMMENTS <br /> j <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.