Laserfiche WebLink
REDDING <br /> 530-246-9499 P <br /> 530-246-9527f <br /> MPE <br /> WEST SACRAMENTO <br /> 916-927-7000 p <br /> MID PACIFIC ENGINEERING INC. 916-372-9900 f <br /> GEOTECHNICAL ENGINEERING I EARTHWORK TESTING I MATERIALS ENGINEERING AND TESTING SPECIAL INSPECTIONS <br /> Project: Griffin Park June 6, 2o21 <br /> Location:Sedan Ave &Manteca Rd, Manteca, CA(APN 22610042) <br /> On dates TBD, following permit approval, six 8-inch auger borings are planned to be drilled <br /> to depths of approximately 15 feet below existing site grades,to obtain geotechnical soil <br /> samples; and three CPTs to approximately 50 feet each at the locations shown on the <br /> attached Site Plan. Upon completion of drilling and sampling of the borings and CPTs,the <br /> locations will be backfilled with a neat cement grout in accordance with the San Joaquin <br /> County Environmental Health Department requirements. <br /> I-A <br /> Andrew Kasozi <br /> Senior Staff Engineer <br /> Mid Pacific Engineering, Inc. <br /> 916-927-7000—office <br /> 916-372-9900 —fax <br /> 916-517-2739 —cell <br /> 6310 STATE HIGHWAY 273,ANDERSON,CALIFORNIA 96007 <br /> 840 EMBARCADERO DRIVE,SUITE 20,WEST SACRAMENTO,CALIFORNIA 95605 <br />