Laserfiche WebLink
FREEZER PANELS CONCRETE <br /> RACK LEG,(BY RACK VENDOR) COOLER/ FREEZER DRAWINGS ARE TO BE USED BY OWNER-SELECTED SUBS SE9 AR�,y <br /> APPLY TWO 1/2°WIDE BEADS OF CONT 6"METAL COVE BASE CURB,(BY G.C.) FOR BIDDING ON COOLER AND FREEZER EQUIPMENT AND BOXES. THESE <br /> p. EMS ASSISTS TO GET PHONE LINE AND T 5 LINE INSTALLED TO BUILDING CONTROLLER BX MODEM CARD CAULK TO TOP OF WOOD NAILERS %"CONT.ELASTOMERIC CAULK ALL DRAWINGS ARE PROVIDED TO GENERAL CONTRACTORS FOR REFERENCE ONLY. �; ROBERT J. <br /> RESTAURANT DEPOT KEY DETAILS SEALANT a WOOD-TO-WOOD ACCIARRI <br /> AND INTERNET PORT USUALLY LOCATED ON POWER WALL. CONNECTIONS SEE <br /> REVISION 7117/14 q. ALL EMS WIRES MUST BE NEATLY INSTALLED USING ZIP TIES AND WIRE RINGS TO CONCEAL WIRING AS 3"THICK RIGID INSUL, ° DET R/THIS SHEET * No. C-32106 <br /> BEST AS POSSIBLE.THERE CANNOT BE WIRES HANGING,OR DROOPING OR THEY WILL BE DONE OVER! (BY G.C.) ° August 31, 2021 <br /> THIS LIST IS TO HIGHLIGHT SOME KEY AREAS IMPORTANT FOR A SUCCESSFUL AND TROUBLE FREE r. 16 ZONES OF IRLDS/MRLDS INSTALLED TO APPROPRIATE LOCATIONS AND TESTED UPON START UP OF ° a <br /> INSTALLATION.THE CONTRACTORS ARE STILL RESPONSIBLE TO INSPECT AND UNDERSTAND EACH AND EVERY SYSTEMS ALL OUT DOOR HOSES MUST BE INSTALLED IN CONDUIT(IF APPLICABLE) (2)2 X 12 PRESSURE ° a ° °a ° ]9 AL DATE <br /> DETAIL APPEARING ON THE PLANS. s. IF IRLDS IS LOCATED IN AN AREA THAT FREON CAN LEAK INTO,THE INTAKE LINE MUST BE RUN OUTSIDE TREATED LUMBER,(BY G.C.) <br /> TO FRESH AIR(IF APPLICABLE)FIELD PROGRAMMING THE IRLDS IS EMS RESPONSIBILITY. <br /> MANUFACTURER PLANS IS WHAT SHOULD BE USED TO BUILD FROM IT IS VERY IMPORTANT THAT A MEETING IS <br /> ESTABLISHED WITH ALL TRADES TO REVIEW THE ENTIRE SCOPE OF WORK BEFORE COMMENCING PRICING ON REINFORCED CONCRETE z <br /> ANY PROJECT. SIGNED - SLAB,(BY G.C.) x O <br /> ° 4 4 <br /> EACH CONTRACTOR/VENDOR BELOW MUST PROVIDE FULL CONTACT INFO AND GET SET UP IN FROSTRAK FOR 7"FOAM INSULATION,(BY G.C.) x �� <br /> FUTURE SERVICE AT COMMENCEMENT OF THE PROJECT 5) REFRIGERATION /ar �m <br /> FREEZER WOOD TO WOOD GALVANIZED THREADED = _ <br /> INTERNET AND PHONE LINE IS IMPERATIVE PRIOR TO START UP OF REFRIGERATION AND BUILDING CONTROL ****RIC IS RESPONSIBLE FOR LOOKING AT ALL EQUIPMENT BEING PROVIDED BY RD.ALL INSTALLERS START UPCONDUIT PIPE FOR TEMP V V V IIIIII o 04 <br /> SYSTEMS AND SERVICE PERSONNEL MUST BE 100%FAMILIAR WITH ALL COMPONENTS OF SYSTEMS;THEY NEED TO rR4� CONNECTION PLAN VIEW SENSOR UNDER INSULATION, �o O� o�O�o�O�o IIIIII—III z <br /> OBTAIN THE MANUALS FOR ISD's,VS DRIVES,MRLDS,VS CONDENSERS,ETC.AND GET TRAINED BEFORE SCALE: N.T.S. (BY G.C.) III—III — <br /> EACH CONTRACTOR MUST SIGN THEIR TRADE DETAILS BELOW. <br /> STARTING PROJECT �0 0 0 0 0 0 0 =III = o <br /> 12"COMPACTED COURSE <br /> a. WHILE SOLDERING ALL REFRIGERATION PIPES NITROGEN MUST BE USED AT ALL TIMES WITH PROPER GRAVEL BY,(BY G.C.) ��� O O 0 0 O c� <br /> 1)INSULATED FREEZER FLOOR <br /> �o 0 0 0 0 0 0 0 o <br /> METHODS!THIS WILL BE SPOT CHECKED IF IT'S FOUND NOT BEING USED ALL THE PIPING WILL BE VOIDED O X <br /> � °` _ = L �4. <br /> v) <br /> a. FOLLOW THESE DETAILS AND SPECIFICATIONS VERY CAREFULLY,NO SUBSTITUTIONS WITHOUT AND HAVE TO BE DONE OVER AT RIC EXPENSE. 6"0 SDR 35 PERFORATED PVC -_ rr, <br /> APPROVAL BY RD b. CONTRACTOR IS RESPONSIBLE TO RECORD PRESSURES THAT REFRIG SYSTEMS ARE RECEIVED,THIS PIPE,(BY G.C.) \ _ _ -III— - = V <br /> b. 3/4 WASHED STONE REQUIRED UNDER SLAB AS PER SPECS INFO MUST BE COMMUNICATED WITH RD REP IMMEDIATELY UPON ARRIVAL OF EQUIPMENT AND TEST <br /> co <br /> c. PICTURES SHOULD BE TAKEN AT EACH STEP AND SHARED WITH RD REP FOR INSPECTION PRIOR TO PREFORMED. PROVIDE 10'-0"HIGH CLOSURE Uj CO <br /> PROCEEDING TO NEXT STEP. c. RD REP MUST WITNESS AND SIGN OFF PRESSURIZATION AND TRIPLE EVACUATION PROCESS OF PIECE @ TRANSITION BETWEEN H FREEZER CU RB DETAIL 3: <br /> TO COOLER&STUD WALL- <br /> d. TEMP SENSORS INSTALLED IN GALVANIZED PIPE BY EC WITH WATER TIGHT CONNECTION WHICH MUST BE REFRIGERATION LINES PRIOR TO MOVING TO NEXT STEPS. � Q� <br /> SEALED AS PER PLANS. d. MAIN LIQUID LINE SOLENOID NORMALLY OPEN WILL BE INCLUDED IN ALL SYSTEMS AND WIRED TO THE MATCH COOLER PANEL - SCALE: 1-1/2" = 1 -O�� — <br /> e. ALL VAPOR BARRIERS APPLIED AS PER DETAILS. FURTHEST EXTENT BY REM TO OUTPUT. FREEZER COLUMN FOOTING/PIER CONDITION IS EXISTING.CONDITION SHOWN IS o <br /> f. DOW FREEZER MATE ONLY. INSULATION PLACED WITH SEAMS STAGGERED AND CROSSED AND TAPPED e. CHICKEN PIT EVAPS(IF USED)FANS BLOWING DOWN. DIAGRAMMATIC. VERIFY EXISTING CONDITION AND COORDINATE WITH <br /> WITH DUCT TAPE. f. CONTRACTOR MUST USE RD/MANUFACTURES START UP PROCEDURE/COMMISSIONING BOOK AND SUBMIT ARCHITECT TO ENSURE CONTINUOUS FREEZER SLAB INSULATION AND VENTING. _ `,J <br /> SDR-35 VENT PIPE SYSTEM MUST HAVE VISUAL INSPECTION PRIOR TO PROCEEDING TO NEXT STEP. o <br /> g TO RD REP PRIOR TO FINAL PAYMENTS. ti <br /> h. ALL HOLES, IN VENT PIPES,FACE DOWNWARD. g. COMPLETE EMS OPERATION OF SYSTEMS TESTED WITH RD REP AND EMS CONTRACTOR THIS INCLUDES FREEZER PANEL BY COOLER (E)U-SHAPED BRACKET <br /> _ a <br /> i. EXHAUST FANS MUST BLOW DOWN,THROUGH HIGHER PIPE. VS DRIVE S. MANUFACTURER TACK ALL VAPOR BARRIER FOAM(7)INSULATION- <br /> j. PIPING OF SUPPLY AND RETURN MUST MATCH PLANS. h. REFRIG CIRCUIT AND IDENTIFICATION PLAN SUPPLIED AND INSTALLED IN MACHINE ROOM AND SMALLER (E)WOOD COLUMN TO REMAIN LAYERS,TO FACE OF WOOD (1)LAYER OF 3",(1)LAYER OF 4" <br /> k. WHEN POURING SLABS EXTRA ATTENTION MUST BE APPLIED TO STRENGTHEN ALL CEMENT FORMS TO COPY IN MANGERS OFFICE AIR GAP CONCRETE SLAB 6"METAL COVE BASE BY COOLER MFG. BLOCKING (DOW 30PS1 FREEZERMATE)W/ <br /> KEEP THEM FROM WALKING FROM PRESSURE OF CONCRETE. i. ALL EVAPS MUST BE INSTALLED AS PER PLANS DETAILS AND CAN'T PROTRUDE IN FRONT OF RACKING& ol 1/2"CONT.ELASTOMERIC SEALANT,(BY G.C.) 3"INSULATION(DOW 30PSI STAGGERED JOINTS,ALL <br /> I. ALL MEASUREMENTS MUST BE CONFIRMED ON SITE WITH HELP OF WALK IN BOX MANUFACTURER AND MUST FIT WITHIN EACH BAY WHERE POSSIBLE OR OTHERWISE INDICATED, IF RACK SUPPORT BOX EVAPS O (3)2 X 12 PRESSURE TREATED LUMBER FREEZERMATE),ALL INSUL. INSULATION JOINTS TO BE TAPED <br /> SIGNED OFF SO WE HAVE NO SURPRISES WHEN BOX DELIVERS. MUST HANG FROM RACKING. EACH EVAP MUST BE LABELED WITH CIRCUIT IDENTIFICATION:EXAMPLE PROVIDE SHIM AS REQ-D. JOINTS TO BE TAPED <br /> m. IT'S IMPERATIVE THAT THE FREEZER WALLS SIT EXACTLY ON THE WOOD PERIMETERS AS PER PLANS AND Al-A,Al-B.LARGE ENOUGH TO SEE FROM FLOOR. <br /> DETAILS. j. CHICKEN PIT DRAIN PAN HEATER/FAN RELAY(IF USED)SHOULD BE INCLUDED TO ELIMINATE EXTRA a a a a a <br /> WIRING AS REQUIRED. a 4 U_ <br /> SIGNED k. WHEN INSTALLING SHIP LOOSE VENTILATION HOODS ON TO MECHANICAL SENSORS CARE SHOULD BE a a co > <br /> TAKEN TO APPLY SILICONE FOR WATER TIGHT SEAL AT ALL FLANGES AS THEY ATTACH TO MACHINE ------------------------------------------------------- 4 ~ <br /> w <br /> 2) INSULATED PANEL INSTALL HOUSE OUTSIDE WALL. WALL TRANSITION 4 w <br /> I. REFRIG CONTRACTOR RESPONSIBLE FOR SIGNING IN ALL CPC LOOSE PARTS.RC MUST REVIEW ALL LU <br /> a. THERE MUST BE A MIN OF 4"AIR SPACE PANELS AND ANY WALLS THAT PALES GO NEXT TO! PARTS WITH EMS CONTRACTOR RD REP MUST KNOW IMMEDIATELY NOT WHEN WE ARE READY TO START P TRIM DETAIL w <br /> b. DOUBLE ROW OF 1/2"CAULKING APPLIED TO WALL PANELS AT WALL TO FLOOR AND WALL TO CEILING UP AND HAVE TO SCRAMBLE FOR PARTS. EMS CONTRACTOR IS RESPONSIBLE TO KEEP PARTS FROM <br /> CONNECTIONS PRIOR TO SETTING GETTING LOST. - SCALE: N.T.S. Q 4 <br /> C. LO TEMP SEALANT APPLIED TO COVER 3"EXPOSED INSULATION ON INSIDE PERIMETER OF FREEZER <br /> m. RIC IS RESPONSIBLE FOR SECURING THE CPC HANDHELD AND ANY OTHER HAND HELD'S PROVIDED WITH <br /> d. TRIM INSTALLED ALL EXPOSED ENDS SILICONE DOWN WHILE SCREWING DOWN THE PROJECT IN MOTOR ROOM OR POWER WALL FOR FUTURE FIELD PROGRAMMING AND TROUBLE UNISTRUT FASTENED TO CD � 4 O O O O O O O O O O o <br /> e. WALL TRIM SCREWS SHOULD BE WHITE AND INSTALLED IN A STRAIGHT LINE EVENLY SPACED SHOOTING OF DEVICES.THIS DOES NOT MEAN TECHS ADD THEM TO THEIR TRUCK STOCK. RACKING BEAM W/3/8"0 STAGGER BOLTS TO OO OO OO OO OOOOO �OQ OQ Q OQ O Q OQ OQ OQ OQ OQ O� N <br /> f. WHERE RODS GO THROUGH WALK IN FREEZER FOR CEILING SUPPORT,THRU BOLTING OF DOORS ETC n. AS APPLICABLE PROVIDE RD REP WITH ALL SUPER HEAT ADJUSTMENTS SET POINTS FOR EVERY THREADED ROD W/(2)3/8" AVOID INTERFERENCE. ��� �� COLUMN FOOTING o oLO <br /> NYLON ROD IS PREFERRED A LONG AS IT IS SIZED CORRECT TO HOLD WEIGHT EVAPORATOR. NUTS&WASHERS @ TOP TOO REMAIN O O O O O O O O 0 0 0 0 0 0 Q <br /> g. ALL DOOR OPENINGS MUST BE REINFORCED AS PER RD DETAILS AND MANUFACTURES o. MEAT CASES:MUST BE SET TO ALLOW UPRIGHT RACKING SUPPORTS TO BE INSTALLED.MEAT CASE &BOTTOM(TYP.) OO O ��� O OQ OQ a O OQ OQ OQ OQ OQ OQ OQ U <br /> RECOMMENDATIONS REFRIG PIPING MUST RUN BETWEEN RISERS AND SHOULD ALSO BE BEHIND UP RIGHTS THE TOP o c 12"COMPACTED <br /> 3STONE,NO FINES z O <br /> h. DIGITAL KASSON K7 DIGITAL THERMOMETERS SUPPLIED AND INSTALLED FLUSH MOUNTED INTO PANELS MOUNTED HORIZONTAL REFRIG RUNS FROM CASE TO CASE SHOULD BE LOW ENOUGH AND FAR ENOUGH O�OU U�JUS J 4 O z_ <br /> WITH ELECTRICAL CONNECTIONS ON TOP OF BOX AND NOT INSTALLED WHERE THEY WILL NOT BE BACK SO NOT SEEN FROM FLOOR MEAT CASES SHOULD BE SET OFF BACK WALL TO ALLOW FOR INSTALL Q <br /> 15/8"X 15/8"HEAVY OOO �O�OoO�O�O�OQOQ QOQOQOQOQOQOQOQOQOQ <br /> BLOCKED BY THE DOORS OF RACK CROSS BEAM IN FRONT OF CASES FOR PROTECTION. o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o Y <br /> i. VAPOR RELIEF PORTS SIZED PROPERLY SIZED FOR FREEZER SUPPLIED AND INSTALLED AND POINTED ***ALL REFRIG PIPING MUST BE INSTALLED TO PROTECT FROM BEING HIT WITH PALLETS. DUTY UNISTRUT,(12 GA.) ������ 4 <br /> INSTALLED W/"U"UP O Z <br /> OUT TO EC TO ASSURE PROPER WIRING p. ****(GLYCOL STORES)****SECONDARY GLYCOL INSTALLS CAN USE GEORGE FISCHER PIPING OR"L OR /8"0 THREADED ROD W/ O O O O O O O O O O 4 a O O O O O O O O O O <br /> j. RECEIVING SLIDER SHOULD BE JAMISON EITHER SINGLE OR BI PARTING WITH WICKET DOOR UNLESS K"COPPER ARMAFLEX MUST BE 1 1/2"INSIDE AND 2"OUTSIDE.IF F PIPING IS USED EXTRA FITTING MUST O O O O O O O O O O O O O O O O O O O <br /> OTHER TYPE DOOR IS SPECIFIED BE ON HAND FOR LEAKS AND RIC MUST GET CERTIFIED BY GF. ( )3/8"NUTS&WASHERS EVAPORATOR COIL. / / / / / / / / / / / / / / p / / / / / / / / / / / / / / z 0 <br /> @ TOP&BOTTOM(TYP.) EVAPORATOR MOUNTING <br /> k. ALL MAN DOORS SHOULD HAVE HEATED WINDOW WIRED AND POINTED OUT TO EC TO ASSURE PROPER q DX LOW TEMP PIPING MUST USE ARMAFLEX 1"SUCTION 1/2"LIQUID. BRACKET @FRONT& \00\00\00\00\00\00\00\00\00\00\00\00\00\00\�O\,�O\00\,�O\,�O\00\00\00\00\00\00\00\00\00\00\00\00\00\00 W <br /> WIRING r. DX MED TEMP PIPING MUST USES ARMAFLEX 3/4' SUCTION IF LIQUID SUB COOLED 1/2' ARMAFLEX MUST BE BACKSIDE OF UNIT U <br /> I. GARBAGE MUST BE CLEANED DURING AND AFTER WORK EACH DAY USED. w w <br /> LU <br /> m. ALL SEAMS,TRIM AROUND COLUMNS AND FLOOR MUST BE SIGNED OFF BY RD PRIOR TO FINAL PAYMENT, s. ****GLYCOL STORES***FOLLOW ALL GLYCOL START UP PROCEDURES AS PER NATURES COOLING START F COLUMN PROTECTION DETAIL ~ � <br /> A QUALITY CONTROL MANUFACTURES CHECKLIST SHOULD ACCOMPANY THE FINAL INVOICE UP AND INSTALL MANUALS, INCLUDING PROPER LEAK TESTING,RINSING AND REMOVING WATER PRIOR TO RACKING INSTALLER TO U CD <br /> GLYCOL BEING INSTALLED.ONLY THE 2 MANUFACTURES OF GLYCOL LISTED IN THE HILL MANUAL IS MODIFY RACKING AT _ Q Q <br /> DATE: ACCEPTABLE MUST BE 35%. 100%CONCENTRATE MUST BE ADDED TO ACHIEVE 35%+2 FREEZER POINT. EVAPORATOR LOCATIONS SCALE: 1-1/2"=1'-0" N <br /> DYE ALSO MUST BE ADDED FOR FUTURE LEAK FINDINGS. p LU <br /> INSTALLING FORMAN: RACK SUPPORTEDQ z <br /> ALL PENETRATIONS COVERED INSPECTED BY G.C.? t. RIC MUST WORK WITH RD REP AND MANUFACTURER TO SET ALL VALVE STATIONS AND CHILLER M EVAPORATOR R C01 L CONNECTION N ECTI ON DETAI L <br /> SLIDE DOORS INSTALLED AND PROPERLY ADJUSTED? BALANCING VALVES AND PUMP PARAMETERS. O <br /> GLASS REACH-IN DOORS INSTALLED,ADJUSTED,AND INSIDE FRAMES SEALED PROPERLY? u. IT IS IMPERATIVE THAT RIC LEARNS AND TRAINS THEIR SERVICE.PERSONNEL ON ALL OF THE LU <br /> LU <br /> IS THERE A FLOOR DRAIN OR PITCHED CONCRETE THAT INTERFERES WITH TIGHT SEAL ON ANY DOOR? COMPONENTS THAT MAKE UP OUR SYSTEMS.THERE ARE ALLOT OF ITEMS THAT WE USE THAT TECHS - SCALE: N.T.S. '� O w Of � <br /> HAVE NEVER SEEN OR FULLY AWARE HOW IT ALL WORKS RD REP WILL HELP WITH THIS PROCESS. o U_ o w w Q m <br /> KPS SWING DOORS INSTALLED AND ADJUSTED TO SEAP PROPERLY? w > ,i _ <br /> NO DAYLIGHT AT DOOR SWEEP,DOOR ANCHORS INSTALLED AND TIGHTENED? Q w m LU AT EACH SIDE OF DOOR w O <br /> SAFETY RELEASE PLUNGERS GREASED AND WORKING PROPERLY? PRESSURIZATION AND EVACUATION PROCESS W 0 =Q JAMB, 1 1/2"X 1 1/2"X 6 <br /> PLUG BUTTONS INSTALLED THROUGH-OUT ENTIRE BOX?WALLS/CELINGS/FLOORS v ¢ v w i 1/2"NAT.ALUM.ANGLE O <br /> ARE PAINTED PANELS CLEANED AND TOUCHED UP WITH GLOSSY WHITE?(NO SPRAY PAINT) SEND ALL PICTURES TO ARTIE BEST AND WAIT FOR CONFIRMATION BEFORE PROCEEDING TO NEXT LU ¢ o <br /> ALL WALL TO FLOOR JOINTS AND WALL TO CEILING JOINTS SILICONED? STAGES. 5 o w0 (2)1/4"X 1 1/2"DRIVE Z N <br /> 3/8"LAG BOLTS @ 24"O.C.MAX. o w J J w <br /> WALL TO FLOOR JOINTS FOAMED IF GAP IS EXCESSIVE AND THEN SILICONED? oz >o w PINS(BASE TO OLU <br /> ALL TRASH PICKED UP AND PLACED IN G.C.'S DUMPSTER ONLY USE A DIGITAL MICRON GAUGE,TAKE READINGS AT RACK AND FURTHEST EVAP COIL. 0 co CONCRETE FLOOR) Q a <br /> ANY MAJOR DENTS OR DAMAGES IN PANELS FROM OTHER TRADES?IF SO WHERE? ® w <br /> ALL CEILING LAG BOLTS INSTALLED ACCORDING TO SHOP DRAWINGS. • PRESSURIZE SYSTEM WITH NITROGEN 250#FOR 48 HOURS WITH BEFORE PICTURES.SEND PICTURES OF <br /> O N <br /> BEFORE&AFTER. <br /> ALL CONCEALED TOPS BUTYLED AND SILICONED ACCORDING TO SHOP DRAWINGSc*#0 U_ <br /> PNEUMATIC/BATTERY POWERED CAULK GUN WAS USED ON ALL BUTYL JOINTS. • MUST USE PROPERLY CONSTRUCTED COPPER EVAC MANIFOLD. NO HOSES. I I Z cn <br /> ALL COOLER/FREEZER WALL/FLOOR JOINTS HAVE A DOUBLE BEAD OF BUTYL? • MUST USE PROPERLY SIZED, EQUAL SIZED 2 STAGE VAC PUMPS AT LEAST 15CFM z <br /> USE(2)#14 X 1"HEX <br /> ALL DOOR OPENINGS SQUARE AND TO DIMENSION? 1ST EVAC WITH MUST PULL TO 1000 MICRONS. <br /> Z w <br /> DOCK DOORS AND EMERGENCY EXITS TRIMMED OUT AND HAVE CLEAN APPEARANCE? • BREAK VACUUM WITH REFRIGERANT TYPE USED IN SYSTEM TO PLUS 1 #. HEAD SCREWS(BASE <br /> STRUCTURAL STEEL CLEAN AND TOUCHED UP. <br /> • CHANGE OIL IN VAC PUMPS. TO WALL) 0 U <br /> DIGITAL THERMOMETERS FACTORY INSTALLED PER PLANS • #2 VACUUM WHICH MUST GET TO 500 MICRONS OR BELOW SEND PICTURES BEFORE CONTINUING,THEN U O <br /> BREAK VACUUM AS ABOVE. BUTYL ALL 26 GA. 1 1/2"x 1 1/2" <br /> JOINTS IN CONTINUOUS ANGLE <br /> • THIRD VACUUM BEFORE STARTING ADD OIL/FILTERS/DRIERS AND START FINAL VACUUM. FREEZERS TYP. Z w <br /> SIGNED • THIS MUST GET AS CLOSE TO 100 MICRONS AS POSSIBLE SEND PICTURES BEFORE CONTINUING ONCE THIS ( ) I I rC DOOR STABILIZER DETAILQ) <br /> IS ESTABLISHED TO BE SIGNED OFF. WOOD BLKG #14 x 1"HEX HEAD @ 12" _ <br /> U_ <br /> 3) ELECTRICAL • BREAK THIRD VACUUM INSTALL ALL TRANSDUCERS AND DUMP CHARGE SYSTEM READY FOR START UP O.C.(TYP.) I I SCALE: N.T.S. o O <br /> o w <br /> EC SHOULD HAVE REFRIG INSTALL EXPERIENCE***WIRING SHOULD FOLLOW MANUFACTURER PLANS ONLY. NOTE: BUTYL BETWEEN LU <br /> N <br /> SIGNED JOINTS AS PANELS ARE W <br /> BUTYL GENERAL REC'G Lu <br /> ASSEMBLED. <br /> a. ALL FREEZER AND COOLER PENETRATIONS MUST BE DOUBLE SEALED AND ALL PIPES SEALED INSIDE #10 x 1"TRUSS HEAD = w <br /> CONDUITS WITH WATER PROOF SEAL OFF DEVICE AS PER DRAWINGS AND SPECIFICATIONS MUST NOT BE EXPOSED. LU <br /> b. ANTHONY DOORS FACTORY WIRING MUST CHECKED FOR GOOD SEAL ON WIRING RACEWAYS THAT CAN 7) CONDENSATION LINES SCREWS @ 12"O.C. 2x6 BLKG. INSULATED WALL PANEL z O <br /> BE DISLODGED WHILE INSTALLING.ALL CONDUITS MUST BE SEALED IN AND OUT TO AVOID ANY COOLER FREEZER Q = <br /> CONDENSATION. a. FREEZER DRAIN PIPE FROM EVAPS MUST EXIT BEHIND EACH EVAP WITH MIN PIPE EXPOSED TO FREEZER - -i ~ <br /> c. ANTHONY DOORS SHOULD BE WIRED USING SEAL TIGHT AND ALL WATER PROOF CONNECTIONS,RISERS TEMPS. COOLER - FREEZER CONNECTION w z <br /> THROUGH WALK IN CEILINGS MUST HAVE CONDUITS SEALED INSIDE WITH WATER PROOF SEAL OFF b. RIC MUST USE"RUNNING TRAPS"ON HORIZONTAL PIPING ALL DRAIN PIPING REQUIRES MIN OF%"PER <br /> DEVICE AS PER DRAWINGS AND SPECIFICATIONS. FOOT PITCH.EACH EVAP REQUIRES CLEAN OUT TEE'S AS PER SPECS AND INDIRECT CONNECTION TO LAG DOWN TOP DETAIL J 18 GA.STAINLESS � <br /> d. BOTH FRAME AND ANTHONY DOOR LOAD WIRING MUST BE FED FROM BREAKERS. MAIN HORIZONTAL RUNS. STEEL JAMB GUARDS Q <br /> e. ELECTRICAL CONTRACTOR MUST COORDINATE PULSE METER INFO FOR ASSISTANCE WITH EMS AND RD. c. RIC INSTALLS HEAT TRACE WIRED TO OUTSIDE BOXES WITH SLEEVE PROTECTING HEAT TRACE AS IT - SCALE: N.T.S. 1/2"CONDUIT- <br /> (IF REQUIRED) PENETRATES WALK IN PANEL. UL LISTED <br /> f. ALL WIRING TO EVAPS AND ALL DOORS MUST BE WATER PROOF TYPE CONDUIT/SEAL TIGHT... FOLLOW d. RIC MUST USE ONLY COPPER PIPE LINES FROM EVAP COILS TO HUB DRAINS IN FREEZER RIC IS #8 x 3/4"HEX HEAD <br /> DETAILS FOR DROPS TO EVAPS. RESPONSIBLE FOR ARMFLEXING EXPOSED DRAIN. 3/8"LAG BOLTS @ 24"O.C.MAX. <br /> *LIQUID LOOP TRAP IS REQUIRED TO ASSURE NO CONDENSATION CAN DRIP INTO THE TOP OF ANY <br /> e. PLUMBER MUST USE HUB DRAINS ON 4 CORNERS OF FREEZER AND INSIDE OF CURB,UNLESS OTHERWISE SCREWS @ 12"O.C. SEE DOOR ELEVS. <br /> ELECTRICAL BOXES ALL CONDUITS SEALED INSIDE CONDUITS WITH WATER PROOF SEAL OFF STATED ON PLANS WHEN RUNNING UNDERGROUND PIPES CARE SHOULD BE TAKEN NOT PENETRATE <br /> INSULATION ANY RISERS IN CURB SHOULD HAVE INSULATION AND THERMAL BREAK FROM FREEZER. I FOR EXTENTS OF BLKG COOLER <br /> DEVICE AS PER DRAWINGS AND SPECIFICATIONS. I I CONDUIT <br /> g. ALL LIGHT FIXTURES IN COOLER/FREEZER RUN ALONG CEILING AND NOT DROPPED FROM CEILING INTO f. USE HEAVY DUTY FLOOR DRAINS AS PER SPECS. I CONNECTOR <br /> EACH FIXTURE. g. MEAT CASE DRAINS SHOULD BE KEPT UNDER MEAT CASES AND NOT IN ISLE. 1"x 6-1/2"FIELD UL LISTED 0.INSTALLED TOP TRIM PERISHABLE RECEIVING <br /> h. SALES T-5 LIGHT FIXTURES SHOULD HAVE ALTERNATING SEQUENCE OF FIXTURES FOR BETTER LIGHT g DOORJAMB DETAIL <br /> DISTRIBUTION AS PER PLANS. <br /> I I -� <br /> i. ALL FIELD WIRING MUST BE CLEARLY IDENTIFIED WITH BROTHER P TOUCH OR EQUIVALENT LABELING SIGNED <br /> BUTYL ALL I DIGITAL THERMOMETER SCALE: N.T.S. <br /> - <br /> DEVICE.THIS INCLUDES BREAKER PANEL SCHEDULES WHERE MISSING. <br /> j. FREEZER AND BI PARTING DOORS WIRING MUST ONLY ENTER FROM BOTTOM OF ELECTRICAL PANELS TO 8) HVAC JOINTS IN 4 OF BOX <br /> FREEZERS 26 GA. 1 1/2"x 1 1/2" <br /> AVOID CONDENSATION TO ACCUMULATE IN BOX AND SHORT OUT. CONTINUOUS ANGLE ELECTRICAL BOX 5'0"A.F.F. <br /> k. EC PROVIDES ALL CONDUITS FOR EMS WIRING INTO BUILDING.THIS INCLUDES BUT NOT LIMITED TO a. SUBMITTALS FOR DUCT WORK MUST BE SUBMITTED TO CSA FOR APPROVAL. � lth� I I #19 1"TRUSS <br /> b. ROOF CURBS MUST BE LAYOUT WITH GC. #14 x 1"HEX HEAD @ 12" I I UL LISTEDA HEAD STAINLESS REVISIONS <br /> REFRIG SYSTEM, ELECTRICAL HOUSES AND WATER TOWER,AIR COOLED CONDENSERS, IRLDS TUBING O.C. INSULATED WALL PANEL STEEL SCREWS <br /> ETC.EMS WILL PROVIDE CONDUITS FOR HIS TEMP,DEW POINT,LIGHT LEVEL,SPACE,SUPPLY SENSORS c. ROOF CUTTING AND PATCHING BY GC. WOOD BLKG , <br /> ETC. d. ROOF CURBS BOLTED TO ROOF DECKING BY HVAC CONTRACTOR. -------- 18 GA. <br /> I. EC PROVIDES GALVANIZED PIPE FOR UNDER SLAB SENSORS WITH WATER TIGHT CONNECTION WHICH e. ROOF CURBS BAFFLES,SUPPLY/RETURN SEPARATION PLATES INSTALLED PROPERLY. STAINLESS <br /> MUST BE INSTALLED AND SEALED AS PER PLANS. f. COMPLETE START UP OF RTU'S AND ALL HVAC WITH RD EMS PERSON. NOTE:BUTYL BETWEEN <br /> m. EMS INSTALLS UNDER FREEZER SLAB TEMP SENSORS. g. INSTALL AND TEST ALL ECONOMIZERS. JOINTS AS PANELS ARE STEEL JAMB <br /> n. ALL HOLES DRILLED CAUSING METAL SHAVINGS EC MUST PROTECT THESE SHAVINGS FROM ENTERING h. BALANCING REPORT SUBMITTED PRIOR TO FINAL PAYMENT AIR BALANCING MUST IF EMS IS NOT ASSEMBLED. BUTYL GUARDS <br /> ANY ELECTRICAL DEVICES. COMPLETED YET LOCAL YOYO STATS MUST BE USED IN THE INTERIM. MUST NOT BE EXPOSED. ELEVATION SECT ON 2x <br /> o. ALL ELECTRICAL DEVICES SHOULD BE BLOWN OUT USING SAFETY GOGGLES TO REMOVE ANY SHAVINGS. i. WORK WITH RD REP AND EMS ON START UP AND TEST OF ALL HVAC ON EACH PIECE OF EQUIPMENT. WOOD <br /> p. EC MUST WIRE MAN DOORS FRAME HEAT AND LIGHT. j. ANY DEVIATIONS WHILE INSTALLING UNITS MUST BE APPROVED BY RD AND GC BEFORE PROCEEDING. BLKG <br /> q. EC MUST WIRE WALK IN FREEZER VAPOR RELIEF PORT AND ALL DIGITAL. k. ALL EQUIPMENT MUST BE LABELED TO MATCH PLANS WITH BIG BLOCK LETTERS TO WITHSTAND WEATHERK TYP. LAG DOWN TOP DETAIL r. EC MUST WIRE KASSON DIGITAL THERMOMETERS AT EACH REFRIG.OPENING. I. FAPPLICABLE HVAR YEARS TO C OAC CONTRACTOR RESPONSIBLE FOR INSTALLING AND TESTING ALL CO2 DEVICES IN E THERMOMETER DETAIL <br /> (2)2x10 <br /> UNITS. - SCALE: N.T.S. - SCALE: N.T.S. B WOOD <br /> SIGNED o <br /> m <br /> 4) EMS INSTALL SIGNEDCOOLER PANEL BEYOND SEE DOOR ELEVS. FOR EXTENTS OF BLKG O <br /> o <br /> ***WIRING SHOULD FOLLOW MANUFACTURER PLANS ONLY. INSULATED DOOR FREEZER w o <br /> a. ONLY USE APPROVED CPC WIRING. 5) SPRINKLER INSTALL IN COOLER/FREEZER INSULATED WALL ~ <br /> HEATED WIPER GASKET B DOOR JAMB DETAIL U) <br /> b. ALL RISERS THROUGHOUT THE STORE IN CONDUIT PROVIDED BY EMS. a. DRY HEADS USED WITH MIN OF 18"OF DRY PIPE FOR RISERS. PANEL 1 1/2"X 1 1/2"18 GA 12"WIDE 12 GA. - <br /> c. ALL WIRES FROM BUILDING TO OUTDOOR SYSTEMS,ELECTRICAL ROOM IN CONDUIT BY EC. b. INSULATE RISER PIPE ABOVE FREEZER WITH AT LEAST 16"ARMAFLEX 1/2"TO PREVENT CONDENSATE BUILD WHITE ANGLE BASE STAINLESS STEEL SCALE: N.T.S. P- o <br /> d. ALL CPC PARTS MUST BE INVENTORIED AT TIME OF DELIVERY AND REPORT OF ANY SHORTAGES AT THAT UP ROLLING DOWN INTO SPRINKLER TRIGGER. (BY MFR) THRESHOLD o <br /> TIME. c. ALL PENETRATIONS DOUBLE SEALED TOP AND BOTTOM TO AVOID ANY CHANCE OF CONDENSATION #14 X 1"HEX HEAD <br /> e. ALL FIELD WIRING MUST BE CLEARLY IDENTIFIED WITH LABELS BROTHER P TOUCH OR EQUIVALENT. FORMING AT TRIGGER PIN. SCREWS 12"O.C. #10 X 1"TRUSS HEAD DOUBLE 2X BLOCKING <br /> 0 <br /> f. EVERY CPC CONTROL MUST BE TESTED WITH RD REP&ELECTRICIAN&ASSOCIATED TRADE FOR PROPER d. SPRINKLER HEADS SHOULD NOT BE INSTALLED CLOSE TO ELECTRIC DEFROST HEATERS IN EVAPS. USE#8 X 3/4"SCREWS SCREWS @ 12"O.C. <br /> OPERATION. e. SPRINKLER HEADS SHOULD NOT BE INSTALLED IN FRONT OF THE WIND CHILL OF EVAP FANS. @ 12"O.C.@ 1/4"X 13/4"TAP CONS d 4 I I INSULATED WALL PANEL N M � U> C.0 r- 00 rn <br /> g. PROVIDE COMPLETE DOCUMENTED COLD TEST.(WITH HEAT/COLD)PRESSURES,LIGHT LEVEL,DEW PT, f. RECESSED HEADS USED IN COOLER AND FREEZER. EXPOSED EXT. @ 12"O.C. ^ I I <br /> DIGITAL OUTPUT,ETC.A TEST OF EACH APPLICATION WITH RD REP. i i #14 x 1 1/4"TRUSS COOLER / <br /> h. ALL EMS CONNECTIONS USING DOLPHIN TYPE CONNECTORS. I j HEAD SCREWS <br /> i. AT START UP TEST AND ASSIST IN TROUBLESHOOTING OR REPLACEMENT OF PARTS TO ASSURE SIGNED I I FREEZER <br /> COMPLETE OPERATING SYSTEM WITH RD EMS REP. ° a d a <br /> j. EMS MAKES ALL THEIR OWN PENETRATIONS,ALL MUST BE SEALED. BUTYL SEALANT a ° NOTE:DETAIL TYPICAL d d I I DETAILS <br /> k. WIF DOOR HEAT,FAN AND PROOFS MUST BE TESTED.TEMP SENSORS PIPE SEALED TO AVOID COLD AIR 9) RACKING 2 BEADS ° ° ` �� FOR ALL COOLER <br /> GOING DOWN PIPES AND GIVING FALSE READINGS.GET YOUR WIRING INFO FROM RD REP AND DOOR PANEL LOCATIONS _______________Q_ <br /> a. RACKING COMPANY MUST SUBMIT DRAWINGS THAT MATCH ALL ANTHONY DOORS,WALK IN DOORS, <br /> MANUFACTURER'S WAY BEFORE START UP DAY. OUTSIDE COOLER INSIDE COOLER I <br /> I. PULSE METER SET UP AND TESTING WITH RD REP,CONSULT WITH PULSE METER MANUFACTURE FOR EVAPS,AND MEAT CASES. I <br /> PROGRAMMING OF THIS METER TO READ KWH PULSE OUT PUTS.WE WILL NEED TO KNOW WHAT EACH b. PALLET STOP BEAMS INSTALLED TO PROTECT WALLS AND ANTHONY DOORS ON ALL LEVELS. j I 2x6 BLKG FOR FOR PERMIT DATE: 11/06/2020 <br /> PULSE EQUALS TO COMPLETE FOR THIS OPERATION. c. ON RACK-SUPPORTED PROJECTS,CROSS BEAMS MUST BE PROVIDED TO HANG EVAPS. FIELD INSTALLED 18 GA. MOUNTING DOOR RAILS <br /> m. ALL SPLICE BOXES CONTAINING TEMP SENSORS MUST BE SEALED TO AVOID COLD AIR GOING DOWN STAINLESS STEEL JAMB GUARDS JOB NO. 20263 <br /> PIPES AND GIVING FALSE READINGS-REAL IMPORTANT!! INCLUDING SLAB SENSORS SPLICE BOXES AND WALL TO FLOOR DETAIL FREEZER MAN DOOR PRODUCE AND DELI <br /> TYP. <br /> TEMP DROP SENSORS INTO COOLER AND FREEZERS. SIGNED p DOORJAMB DETAIL <br /> n. EC PROVIDES GALVANIZED PIPE FOR UNDER SLAB SENSORS WITH WATER TIGHT CONNECTION WHICH THRESHOLD DETAIL rA'***'N <br /> MUST BE INSTALLED AND SEALED AS PER PLANS. SCALE; N.T.S. - SCALE: N.T.S. SCALE: N.T.S. <br /> o. EMS INSTALLS UNDER FREEZER SLAB TEMP SENSORS. <br /> SHEET NO. <br />