<br /> Electrical Power Distribution STATE OF CALIFORNIA STATE OF CALIFORNIA (Z p� � JOHN q��<t�y�
<br /> NRCC-ELC-E CALIFORNIA ENERGY COMMISSION Sign Lighting Sign Lighting C->
<br /> Q�� q�y
<br /> NRCC-LTS-E CALIFORNIA ENERGY COMMISSION NRCC-LTS-E CALIFORNIA ENERGY COMMISSION
<br /> CERTIFICATE OF COMPLIANCE NRCC-ELC-E L0CERTIFICATE OF COMPLIANCE NRCC-LTS-E CERTIFICATE OF COMPLIANCE NRCCATS-E to Lo J �
<br /> This document is used to demonstrate compliance with mandatory requirements in 130.5 for electrical systems in newly constructed nonresidential,high-rise residential and O � � C=
<br /> hotel/motel occupancies.Additions and alterations to electrical service systems in these occupancies will also use this document to demonstrate compliance per§141.0(0) or This document is used to demonstrate compliance with requirements in 110.9 110.12 130.0 130.3 140.8 and4141.0(b)2 for sign lighting scopes using the prescriptive path. Project Name: Restaurant Depot-Stockton,CA RepU ort Page: (Page 5 of 5) 6 0 I I O E 23314
<br /> §141.0(b)2P for alterations.. Exit signs and traffic signs are not required to comply with prescriptive requirements per exceptions to1§ 40.8 and do not need to complete this compliance document. Project Address: 1015 Hammer Ave,Stockton,CA 95209 Date Prepared: 2020-11-06715:08:30-05:00 (1) z = = W
<br /> Project Name: Restaurant Depot-Stockton,CA Report Page: (Page 1 of 5) � to L0 >
<br /> Project Name: Restaurant Depot-Stockton,CA Report Page: (Page 1 of 4) � i\ i\ _ F[;j R P
<br /> Project Address: 1015 Hammer Ave,Stockton,CA 95209 Date Prepared: 2020-11-06T14:55:49-05:00 Project Address: 1015 Hammer Ave,Stockton,CA 95209 Date Prepared: 2020-11-06T15:08:30-05:00 CD 0 .--� .--. O F 0.
<br /> DOCUMENTATION AUTHOR'S DECLARATION STATEMENT Q O') 0') O
<br /> A.GENERAL INFORMATION I certify that this Certificate of Compliance documentation is accurate and complete. Cll O CD U
<br /> A.GENERAL INFORMATION -0 U (D (D
<br /> 01 Project Location(city) Stockton,CA Documentation Author Name: Documentation Author Signature:
<br /> 01 Project Location(city) Stockton,CA 02 Occupancy Types Within Project: Daryl Deshields - i r
<br /> 02 Climate Zone 12
<br /> ElOffice ® Retail ElWarehouse ❑ Hotel/Motel ❑ School ® Support Areas company: Coolsys Energy Design Signature Date: 11-06-2020 LCA + +
<br /> 03 Building is a healthcare facility No
<br /> ❑ Parking Garage ❑ High-Rise Residential ❑ Relocatable ❑ Healthcare Facilities ❑ Other(write in) Address: 5 Independence Way,Suite 360 CEA/HERS Certification Identification(if applicable): ''/^� N
<br /> City/State/zip: Princeton,NJ 08540 Phone:609-751-9655 L I o'
<br /> B.PROJECT SCOPE B.PROJECT SCOPE RESPONSIBLE PERSON'S DECLARATION STATEMENT z
<br /> This table includes electrical systems that are within the scope of the permit application. This table includes illuminated signs that are within the scope of the permit application and are demonstrating compliance using the prescriptive path outlined in 1§ 40.8 or I certify the following under penalty of perjury,under the laws of the State of California: 1 A �• z
<br /> §141.0(b)2M for alterations.Exit signs and traffic signs are not required to comply with prescriptive requirements per exceptions to 140.8 and do not need to complete this 1. The information provided on this Certificate of Compliance is true and correct. VU1 ix - Z N
<br /> System subject to CA EI2C Code
<br /> 01 02 03 04 05 2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance(responsible designer) • •
<br /> compliance document. 0 O 0 W N J
<br /> 3. The energy features and performance specifications,materials,components,and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements 00000
<br /> 1 Rating Utility Provided Metering System 01 02 03 04 OS of Title 24,Part 1 and Part 6 of the California Code of Regulations. 0 O Z W �
<br /> Electrical Service Designation/Description Scope of Work 2 Article 517 Exception to z -
<br /> (kVA) Exception t0 130.5 a Name or Item Ta Complete Si n Description Si n Status' Si n T e COm liance Method2 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents,worksheets,calculations, O - C'4
<br /> §130.5(ajand (b) g p g p g g yp P plans and specifications submitted to the enforcement agency for approval with this building permit application. U W U -
<br /> Add Alt to feeders and branch circuits Flood lights to illuminate sign shown on the canopy in front 5. 1 will ensure that a com leted si ned co of this Certificate of Com liance shall be made available with the buildin ermit s issued for the buildin,and made available to the enforcement a enc for all a licable -
<br /> 1600A @ 120/208v
<br /> Add/
<br /> onl ❑ ❑ L1 New Outdoor Max Allowed Lighting Power P g copy p g p () g a y Pp _ �, O
<br /> y of store inspections.I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy.
<br /> Responsible Designer Name: Responsible Designer Signature: 0 CV U
<br /> Where required,demand response controls must be specified which are capable of receiving and automatically � O
<br /> messaging P P g 9 lighting P f 9 ff p y Peter Arvav
<br /> respondingto at least one standards based messa in protocol which enables demand response after receiving a demand 'FOOTNOTE:Sign alterations that increase the connected li htin load,replace and rewire more that50%o the ballasts,or relocate the sign to a different location mustcom 1 with 140.8.See O X N
<br /> 06 Demand Response Controls response signal.Sections 4120.2 F4130.1 and 4130.3 and compliance documents NRCC-MCH,NRCC-LTI and NRCC-LTS will §141.0(b)2M formore details. company: Coolsys Energy Design Date Signed:11-06-2020 i�: O j
<br /> indicate when demand response controls are required. ZThe ENERGY VERIFIED Label compliance method is only applicable i the sign has a permanent,factory-installed,installed,ENERGY VERIFIED label certified b UL or comparable,confirming the sign complies with Address: 5 Independence Way,Suite 360 License: E23314 _ _ O N
<br /> P Q P Y PP f 9 P f ryY P f 9 9 P _ - ♦ Y
<br /> 'FOOTNOTES:Adding only new feeders and branch circuits triggers Voltage Drop 130.5(c),no other requirements from 130.5 are required. §140.8.Note that using an ENERGY VERIFIED label is an optional compliance path,not a mandatory requirement.Seethe tooltips for this table for more details. City/State/Zip: Princeton,NJ 08540 Phone: 609-751-9655 - VU U
<br /> L
<br /> Applicable if the utility company is providing a metering system that indicates instantaneous kW demand and kWh for a utility-defined period. Ca
<br /> Co
<br /> UJ O��
<br /> C.COMPLIANCE RESULTS C_�O cO
<br /> Results in this table are automatically calculated from data input and calculations in Tables F through L Note:If any cell on this table says"COMPLIES with Exceptional Conditions"refer N
<br /> to Table D.Exceptional Conditions for guidance or see applicable Table referenced below. Q N C �
<br /> f 1
<br /> 01 02 03 04 05
<br /> O Cfl
<br /> Service Electrical AND Separation for AND Voltage Drop 4130.5(c) AND Controlled Receptacles - ' ` O CV
<br /> Metering§130.5(a) Monitoring§130.5(b) (See Table H) §130.5(d) - V
<br /> (See Table F) (See Table G) (See Table 1) p O
<br /> AND AND Yes AND COMPLIES ti O
<br /> W
<br /> Registration Number: Registration Date/Time: Registration Provider:Energy Code Ace
<br /> Registration Number: Registration Date/Time: Registration Provider:Energy Code Ace Registration Number: Registration Date/Time: Registration Provider:Energy Code Ace
<br /> CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.1.003 Report Generated:2020-11-06 11:55:57
<br /> Schema Version:rev 20190401 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.1.003 Report Generated:2020-11-0612:08:36 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.1.003 Report Generated:2020-11-0612:08:36
<br /> Schema Version:rev 20190401 Schema Version:rev 20190401
<br /> STATE OF CALIFORNIA
<br /> Electrical Power Distribution
<br /> STATE OF CALIFORNIA
<br /> NRCC-ELC-E CALIFORNIA ENERGY COMMISSION
<br /> Sign Lighting
<br /> CERTIFICATE OF COMPLIANCE NRCC-ELC-E
<br /> NRCC-LTS-E CALIFORNIA ENERGY COMMISSION
<br /> Project Name: Restaurant Depot-Stockton,CA Report Page: (Page 2 of 4) CERTIFICATE OF COMPLIANCE NRCC-LTS-E
<br /> Project Address: 1015 Hammer Ave,Stockton,CA 95209 Date Prepared: 2020-11-06T14:55:49-05:00 Project Name: Restaurant Depot-Stockton,CA Report Page: (Page 2 of 5)
<br /> Project Address: 1015 Hammer Ave,Stockton,CA 95209 Date Prepared: 2020-11-06T15:08:30-05:00
<br /> D.EXCEPTIONAL CONDITIONS
<br /> This table is auto filled with uneditable comments because of selections made or data entered in tables throughout the form. C.COMPLIANCE RESULTS
<br /> Results in this table are automatically calculated from data input and calculations in Tables B through H.Note:If any cell on this table says"COMPLIES with Exceptional Conditions"refer
<br /> E.ADDITIONAL REMARKS to Table D.Exceptional Conditions for guidance or see applicable Table referenced below. (77
<br /> O
<br /> This table is includes remarks made by the permit applicant to the Authority Having Jurisdiction. 11513 1W 04 05 06 07 CV
<br /> Name or Item Total Designed OR Compliant Light OR ENERGY VERIFIED M
<br /> F.SERVICE ELECTRICAL METERING Tag Complete Sign Description Total Allowed(Watts) - (Watts) Sources Label Compliance Results
<br /> See Table B (See Table B) (See Table F) See Table F See Table G Q
<br /> This table includes new or replacement electrical service systems OR equipment to demonstrate compliance with 130.5 a ( ) ( ) ( ) (See Table H) U
<br /> 01 02 03 04 05 Flood lights to illuminate sign
<br /> Required Metering Capabilities per Table 130.5-A Field Inspector L1 shown on the canopy in front of 303.6 >_ 50 OR OR COMPLIES z z
<br /> store
<br /> Electrical Service Rating Tracking kWh for Location of Requirements in
<br /> Instantaneous Historical Peak kWh per rate COMPLIES with Exceptional
<br /> Designation/Description (kVA) period user-defined Construction Documents Pass Fail Controls Compliance(See Table F/G/H for Details) �
<br /> Demand(kW) Demand(kW) period Conditions U
<br /> G.SEPARATION OF ELECTRICAL CIRCUITS FOR ENERGY MONITORING D.EXCEPTIONAL CONDITIONS Z
<br /> This section does not apply to this project. This table is auto filled with uneditable comments because of selections made or data entered in tables throughout the form. W z Z
<br /> F.Maximum Allowed Lighting Power and Controls Applicant Notes [L1](Dimming Control)Exempt-sign lighting not on during night or less than one hour - 0
<br /> H.VOLTAGE DROP during daytime Cn �
<br /> H
<br /> This table includes entirely new or complete replacement electrical power distribution systems,or alterations that add,modify or replace both feeders and branch circuits to E.ADDITIONAL REMARKS U M
<br /> demonstrate compliance with 4130.5(c).For alterations,only the altered circuits must demonstrate compliance per§141.0(b)2Piii W W
<br /> 01 02 03 04 OS This table is includes remarks made by the permit applicant to the Authority Having Jurisdiction. H LLJ
<br /> Electrical Service Combined Voltage Drop on Installed Feeder/Branch Location of Voltage Drop
<br /> Sheet Number for Voltage Drop Field Inspector ()Q Q
<br /> Designation/Description Circuit Conductors Compliance Method Calculations) Documents Calculations in Construction Pass Fail Cn
<br /> Permitted by CA Elec Q Cn
<br /> Fagerop less than p W1600A @ 120/208v ® 5% ❑ Code(Exception to In construction documents E-6.0 and 6.1 ❑ ❑ Q J
<br /> 130.5(c))*
<br /> Z
<br /> *NOTES:If"Permitted by CA Elec Code*"is selected under Compliance Method above,please indicate where the exception applies in the space provided below.
<br /> 'FOOTNOTES:Voltage drop calculations may be attached to the permit application outside the construction documents if allowed by the Authority Having Jurisdiction.Select"attached" �
<br /> if applicable.If calculations will be the responsibility of the installing contractor,select"Contractor Responsible". I-
<br /> m
<br /> Registration Number: Registration Date/Time: Registration Provider:Energy Code Ace W� O
<br /> CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.1.003 Report Generated:2020-11-06 11:55:57 Registration Number: Registration Date/Time: Registration Provider:Energy Code Ace W
<br /> Schema Version:rev 20190401 � J
<br /> CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.1.003 Report Generated:2020-11-0612:08:36 0-
<br /> Schema Version:rev 20190401 (n
<br /> Z W
<br /> O IY
<br /> STATE OF CALIFORNIA
<br /> Q X
<br /> Electrical Power Distribution :2w
<br /> NRCC-ELC-E CALIFORNIA ENERGY COMMISSION 1 (J)
<br /> CERTIFICATE OF COMPLIANCE NRCC-ELC-E STATE of CALIFORNIA 0
<br /> Project Name: Restaurant Depot-Stockton,CA Report Page: (Page 3 of 4) Z CO
<br /> Sign Lighting _ �
<br /> Project Address: 1015 Hammer Ave,Stockton,CA 95209 IDate Prepared: 2020-11-06T14:55:49-05:00 NRCC-LTS-E CALIFORNIA ENERGY COMMISSION Z
<br /> CERTIFICATE OF COMPLIANCE NRCC-LTS-E z W
<br /> Project Name: Restaurant Depot-Stockton,CA Report Page: (Page 3 of 5) ZD
<br /> '.CIRCUIT CONTROLS FOR 120-VOLT RECEPTACLES AND CONTROLLED RECEPTACLES (0 2-7 0
<br /> Project Address: 1015 Hammer Ave,Stockton,CA 95209 Date Prepared: 2020-11-06715:08:30-05:000
<br /> This section does not apply to this project. 0
<br /> 0
<br /> J.DECLARATION OF REQUIRED CERTIFICATES OF INSTALLATION F.MAXIMUM ALLOWED LIGHTING POWER AND CONTROLS C/) W
<br /> Selections have been made based on information provided in this document.If any selection have been changed by permit applicant,an explanation should be included in Table E. This table includes illuminated signs using the Maximum Allowed Lighting Power compliance method per§140.8(o) as indicated on Table B of this compliance document.It also Z W
<br /> Additional Remarks.These documents must be provided to the building inspector during construction and can be found online at demonstrates compliance with mandatory controls requirements from 130.3 by indicating control types for each sign. Q)
<br /> W =
<br /> https.11www.energy.ca.gov/title24/2019standards/2019 compliance documents/Nonresidential Documents/NRCl/ 01 02 03 04 05 06 07 08 09
<br /> Field Inspector Allowed Mandatory Controls Field Inspector U LL
<br /> Yes No Form/Title Name or Item Complete Sin Illumination Sign Area n
<br /> Pass Fail P g Allowance Desi g Density g Demand LlZliii 0 0
<br /> • 1 0 INRCI-ELC-01-E-Must be submitted for all buildings ❑ ❑ Tag Description Method (ft2) 2 (Watts) Watts Shut-Off Dimming 1 Pass Fail 0 W
<br /> g (W/ft) Response W CO
<br /> Flood lights to CIO
<br /> K.DECLARATION OF REQUIRED CERTIFICATES OF ACCEPTANCE L1 illuminate sign shown Automatic Time Switch �
<br /> There are no Certificates of Acceptance applicable to electrical power distribution requirements. on the canopy in front Externally 132 2.3 303.6 50 +Photocontrol Exempt* W NA El El LU
<br /> of store
<br /> � IV
<br /> W �
<br /> 10 1 14 z O
<br /> Luminaire Complete Luminaire Watts per Total Number J =
<br /> Name or Item How is Wattage determined
<br /> Tag Description luminaire of Luminaires Of ZD
<br /> sign
<br /> Q
<br /> Lu
<br /> L2 Flood light illuminate 25 Mfr.Spec 2 ZD
<br /> *NOTES:Controls with a*require a note in the space below explaining how compliance is achieved.EX:Sign within tunnel illuminated day and night'EXCEPTION to Q
<br /> 130.3(a)2A.
<br /> Ll (Dimming Control)Exempt-sign lighting not on during night or less than one hour during daytime Ln
<br /> 'FOOTNOTE.Demand response controls are only required for an Electronic Message Center having a new connected lighting power load greater than 15 kW per 4110.12(d)
<br /> G.LIGHT SOURCES AND CONTROLS
<br /> This section does not apply to this project.
<br /> H.ENERGY VERIFIED LABELED SIGNS AND CONTROLS
<br /> This section does not apply to this project.
<br /> Registration Number: Registration Date/Time: Registration Provider:Energy Code Ace
<br /> CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.1.003 Report Generated:2020-11-06 11:55:57
<br /> Schema Version:rev 20190401
<br /> Registration Number: Registration Date/Time: Registration Provider:Energy Code Ace
<br /> CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.1.003 Report Generated:2020-11-0612:08:36
<br /> Schema Version:rev 20190401
<br /> STATE OF CALIFORNIA
<br /> Electrical Power Distribution REVISIONS
<br /> NRCC-ELC-E CALIFORNIA ENERGY COMMISSION
<br /> CERTIFICATE OF COMPLIANCE NRCC-ELC-E
<br /> Project Name: Restaurant Depot-Stockton,CA Report Page: (Page 4 of 4)
<br /> Project Address: 1015 Hammer Ave,Stockton,CA 95209 IDate Prepared: 2020-11-06T14:55:49-05:00 STATE OF CALIFORNIA
<br /> Sign Lighting
<br /> NRCC-LTS-E CALIFORNIA ENERGY COMMISSION
<br /> DOCUMENTATION AUTHOR'S DECLARATION STATEMENT CERTIFICATE OF COMPLIANCE NRCC-LTS-E
<br /> certify that this Certificate of Compliance documentation is accurate and complete. Project Name: Restaurant Depot-Stockton,CA Report Page: (Page 4 of 5)
<br /> Documentation Author Name: Documentation Author Signature: Project Address: 1015 Hammer Ave,Stockton,CA 95209 IDate Prepared: 2020-11-06T15:08:30-05:00
<br /> Daryl Deshields
<br /> Company: Coolsys Energy Design Signature Date: 11-06-2020
<br /> Address: 5 Independence Way,Suite 360 CEA/HERS Certification Identification(if applicable): I.DECLARATION OF REQUIRED CERTIFICATES OF INSTALLATION
<br /> City/State/zip: Princeton,NJ 08540 Phone:609-751-9655 Selections have been made based on information provided in this document.If any selection have been changed by permit applicant an explanation should be included in Table E.
<br /> RESPONSIBLE PERSON'S DECLARATION STATEMENT Additional Remarks.These documents must be provided to the building inspector during construction and can be found online at
<br /> I certify the following under penalty of perjury,under the laws of the state of California: https.11www.energy.co.gov/title2412019standards/2019 compliance documents/Nonresidential Documents/NRCl/
<br /> 1. The information provided on this Certificate of Compliance is true and correct. Field Inspector
<br /> 2. lam eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance(responsible designer) Yes No Form/Title m
<br /> 3. The energy features and performance specifications,materials,components,and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements Pass Fail Of
<br /> of Title 24,Part 1 and Part 6 of the California Code of Regulations. O NRCI-LTS-01-E-Must be submitted for all buildings ❑ ❑ 0
<br /> LL
<br /> 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents,worksheets,calculations, M
<br /> plans and specifications submitted to the enforcement agency for approval with this building permit application. W W
<br /> p g copy p g p (). g pp J.DECLARATION OF REQUIRED CERTIFICATES OF ACCEPTANCE
<br /> 5. I will ensure that a completed signed co of this Certificate of Compliance shall be made available with the building permit(s)issued for the building,and made available to the enforcement agency for all applicable � =)
<br /> inspections.I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy. There are no Certificates of Acceptance applicable to sign lighting requirements. H U)
<br /> Responsible Designer Name:Peter Arvay Responsible Designer Signature:
<br /> Company: Coolsys Energy Design Date Signed: 11-06-2020 0
<br /> Address: 5 Independence Way,Suite 360 License: E23314 LU N
<br /> City/state/zip: Princeton,N1 08540 Phone: 609-751-9655 1.--- co
<br /> 4k GV co V IX) (.O r-- oo M O
<br /> ELECTRICAL
<br /> TITLE 24
<br /> Registration Number: Registration Date/Time: Registration Provider:Energy Code Ace
<br /> CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.1.003 Report Generated:2020-11-06 11:55:57 FOR PERMIT DATE: /06/2020
<br /> Schema Version:rev 20190401
<br /> Registration Number: Registration Date/Time: Registration Provider:Energy Code Ace JOB NO. 20263
<br /> CA Building Energy Efficiency Standards-2019 Nonresidential Compliance Report Version:2019.1.003 Report Generated:2020-11-0612:08:36
<br /> Schema Version:rev 20190401
<br /> E - 1
<br /> 2
<br /> ■
<br /> SHEET NO.
<br />
|