My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
116
>
2300 - Underground Storage Tank Program
>
PR0523684
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 2:59:02 PM
Creation date
9/10/2021 4:32:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0523684
PE
2351
FACILITY_ID
FA0015977
FACILITY_NAME
Fast Lane Central Valley
STREET_NUMBER
116
STREET_NAME
ROTH
STREET_TYPE
Rd
City
Lathrop
Zip
95330
APN
196-02-020
CURRENT_STATUS
01
SITE_LOCATION
116 Roth Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
418
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Telephone: (209)468-3420 Fax: (209) 468-3433 Web:www.sigov.org/ehd <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: TFacility Address: Date: <br /> Fast Lane Central Valley 116 Roth Rd, Lathrop June 20, 2017 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item # Remarks <br /> 316 HSC 25290.1(c3), 25290.2(c3) Secondary containment not constructed to prevent water intrusion (after Jul 2003). <br /> Water was found on the auto side in the 87-product submersible turbine pump (STP), 87-product fill, 91-product <br /> STP,91-product fill, diesel STP, diesel fill and vent sumps; and on the truck side water was found in the T1 diesel <br /> tank south STP, T2 diesel tank north STP, and vent sumps. Liquid (possibly product)was found in under dispenser <br /> containments for dispensers 14A/156, 15A/1 613, 16A/1 7B and 17A/1 8B. Secondary containment shall be <br /> constructed to prevent any water intrusion into the system by precipitation, infiltration, or surface runoff. <br /> On the auto side of the facility, the service technicians removed approximately: <br /> one-quarter cup of water from the 87-product STP sump; <br /> two gallons of water from the 87-product fill sump; <br /> one cup of water from the 91-product STP and fill sumps; <br /> two cups of water from the diesel STP sump; <br /> one gallon of water from the diesel fill sump; and <br /> one inch of water in the auto vent sump. <br /> The service technicians did not remove any liquid from the truck side of the facility. Immediately remove this liquid, <br /> make a hazardous waste determination per Title 22 hazardous waste regulations, and manage accordingly. <br /> Immediately contact a properly licensed, trained, and certified contractor to address the water/liquid intrusion listed <br /> above. <br /> This is a repeat violation, Class II. <br /> 319 CCR 2635(b) No spill bucket, failed to contain five gallons, or failed to provide a means to keep it empty. <br /> The 87-product spill container on the auto side and the tank 2 diesel north spill container on the truck side failed the <br /> one-hour hydrostatic test. All USTs shall be equipped with a spill container that has a minimum capacity of five <br /> gallons and a drain valve that allows drainage of the collected spill into the primary container or provides a means to <br /> keep the container empty. The service technician replaced the caps, tested functionality and the both spill <br /> containers passed the one-hour hydrostatic test. <br /> This was corrected on site. <br /> This is a repeat violation, Class ll. <br /> Overall Inspection Comments: <br /> An inspection checklist was provided to the facility clerk on the day of inspections (June 19 and 20, 2017). The <br /> Environmental Health Department (EHD) has written the complete report which replaces the initial checklist. <br /> Complete and submit a copy of the Return to Compliance Certification form to the EHD with a statement <br /> documenting the corrective actions that have been or will be taken for each violation, and any supporting <br /> paperwork, within 30 days of receiving the complete inspection report. <br /> Note: The annual monitoring system certification testing was not completed during the two days of testing on <br /> June 19 and 20, 2017. Vacuum sensor monitoring of the secondary containment piping on the auto and truck <br /> sides of the facility of the vacuum/pressure/hydrostatic (VPH) system were not tested during these two days. <br /> The interstitial space of the underground storage tank shall be maintained, as designed, under constant vacuum <br /> such that a breach in the primary or secondary containment is detected before the hazardous substance is <br /> FA0015977 PR0523684 SCO01 06/20/2017 <br /> EHD 23-01 Rev.09/22/16 Page 10 of 11 Underground Storage Tank Program OIR <br />
The URL can be used to link to this page
Your browser does not support the video tag.