Laserfiche WebLink
ORIGINAL <br />UST SYSTEM RETROFIT OR REPAIR <br />(Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br />1. Site map enclosed? YES [ ] NOX <br />2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br />person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br />Plan" is available on the jobsite as required by Title 8. <br />3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br />to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br />addingpiping, UDC's, or other UST equipment, or performing tank top upgrade, use t I toan <br />pages 4-8 as necessary for a timely plan review): EU <br />CIPaned dirt & debris from auto side sump m1lars. .IUL 0 8 /_019, <br />Cleaned sealed &lubricated vapor sump covers rIInO'yo <br />Adjusted OVERFILL from 90 to 95% & HIGH PRODUCT from 95 to 90%. ENVIRONMENTAL y H�er,ipAi �.� kA 1 <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />NONE <br />