My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
116
>
2300 - Underground Storage Tank Program
>
PR0523684
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 2:59:02 PM
Creation date
9/10/2021 4:32:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0523684
PE
2351
FACILITY_ID
FA0015977
FACILITY_NAME
Fast Lane Central Valley
STREET_NUMBER
116
STREET_NAME
ROTH
STREET_TYPE
Rd
City
Lathrop
Zip
95330
APN
196-02-020
CURRENT_STATUS
01
SITE_LOCATION
116 Roth Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
418
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />1868 East Hazelton Avenue, Stockton, California 95205-6232 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.socehd.com <br />UNDERGROUND STORAGE TANK UST PROGRAM INSPECTIONREPORT <br />Facility <br />V R COS <br />HSC 25284 <br />No permit to operate (V650) <br />Facility <br />Inspection +� <br />Name: <br />No written agreement between tank owner and tank operator to monitor the tank system (V735) <br />❑ ❑ ❑ <br />r101 <br />103 <br />HSC 25292.2 <br />Phone: <br />Date: 1 <br />Facility <br />CCR 2711 <br />UST Operating Permit Application for Facility and Tank information not submitted or current (V651) <br />❑ 1 ❑ ❑ <br />105 <br />Address: 1 YJ � <br />Current BOE number not submitted (V652) <br />° ° ° <br />106 <br />ID: ID: <br />Inspection <br />❑ ❑ <br />Title: <br />Phone: <br />Contact: <br />108 <br />CCR 2637(f), <br />2638(e) <br />Failed to notify the EHD 48 hours prior to conducting testing (V671) <br />Inspection 1^ Q ) <br />109 <br />%Program: <br />Failed to test secondary containment (V660) <br />° ° ° <br />Type: <br />CCR 2637(e) <br />Failed to submit secondary containment test report within 30 days (V662) <br />❑ ❑ ° <br />111 <br />o sent Given For <br />Failed to test monitoring and leak detection equipment annually (V659) <br />Consent <br />112 <br />HSC 25284.2 <br />nspection hotos ❑ Sampling <br />I <br />Given By: <br />CCR 2638(d) <br />Failed to submit monitoring system certification test report within 30 days (V823) <br />Service Tech,A <br />114 <br />p. <br />'1 Designated <br />'� <br />xp. <br />Onsite: IAA <br />CCR 2715(a) <br />Date: <br />Operator: <br />Dater <br />Service Technician <br />Designated operator, service tech or installer did not possess current ICC certification (V717) <br />n <br />9L N <br />1�6.) � <br />' WWI <br />Failed to conduct ELD testing on a system located within 1 000'of a public well (V672) <br />Manufacturer's Training:A <br />118 <br />HSC 25292.5 <br />Failed to repair and retest system due to failed ELD test (V749) <br />\Jil�(�� <br />119 <br />CCR = California Code of Regulations <br />HSC = Health and 21kafety <br />Code CFR = Code of Federal Regulations <br />CCR 2663 <br />Failed to inspect a lined or repaired steel tank within 10 years of lining and every 5 years after (V666) <br />❑ ❑ ❑ <br />V = Violation R = Repeat COS = Corrected on site during inspection <br />EHD 23-01 REV 03/04/15 - -V /) Page 1 Us i INJrtI, i iON REPO K i <br />File Review <br />V R COS <br />HSC 25284 <br />No permit to operate (V650) <br />° ° ° <br />102 <br />HSC 25284(a)(3) <br />No written agreement between tank owner and tank operator to monitor the tank system (V735) <br />❑ ❑ ❑ <br />r101 <br />103 <br />HSC 25292.2 <br />Current financial responsibility documents not submitted (V720) <br />❑ ❑ <br />104 <br />CCR 2711 <br />UST Operating Permit Application for Facility and Tank information not submitted or current (V651) <br />❑ 1 ❑ ❑ <br />105 <br />HSC 25286(c) <br />Current BOE number not submitted (V652) <br />° ° ° <br />106 <br />CCR 2632 <br />Monitoring and response plans not current or approved by the EHD (V654) <br />❑ ❑ <br />107 <br />CCR 2632(d)(1)(C) Plot plan/site map not submitted or failed to completely show where monitoring is performed (V655) <br />❑ ❑ <br />108 <br />CCR 2637(f), <br />2638(e) <br />Failed to notify the EHD 48 hours prior to conducting testing (V671) <br />❑ ❑ ❑ <br />109 <br />CCR 2637 <br />Failed to test secondary containment (V660) <br />° ° ° <br />110 <br />CCR 2637(e) <br />Failed to submit secondary containment test report within 30 days (V662) <br />❑ ❑ ° <br />111 <br />CCR 2638(a) <br />Failed to test monitoring and leak detection equipment annually (V659) <br />❑ ❑ Cl <br />112 <br />HSC 25284.2 <br />Failed to test spill containers annually (V661) <br />113 <br />CCR 2638(d) <br />Failed to submit monitoring system certification test report within 30 days (V823) <br />❑ ❑ <br />114 <br />CCR 2636(f) <br />Failed to perform 0.1 gph annual line test for pressurized piping without fail safe or shut down (V663) <br />❑ ❑ ❑ <br />115 <br />CCR 2715(a) <br />Failed to inform the EHD of a change of designated operator within 30 days (V658) <br />❑ ❑ ❑ <br />116 <br />CCR 2715 <br />Designated operator, service tech or installer did not possess current ICC certification (V717) <br />❑ ❑ ❑ <br />117 <br />HSC 25292.5 <br />Failed to conduct ELD testing on a system located within 1 000'of a public well (V672) <br />❑ ❑ ❑ <br />118 <br />HSC 25292.5 <br />Failed to repair and retest system due to failed ELD test (V749) <br />° 1 ° ° <br />119 <br />CCR 2644.1(a)(5) Failed to submit ELD test results within 60 days (V669) <br />° ° ° <br />120 <br />CCR 2663 <br />Failed to inspect a lined or repaired steel tank within 10 years of lining and every 5 years after (V666) <br />❑ ❑ ❑ <br />121 <br />CCR 2663 <br />Failed to submit tank lining certification within 30 days or to conduct proper tests (V667) <br />❑ ❑ ❑ <br />122 <br />HSC 25299 <br />Documents were falsified or misrepresented (V657) <br />° ° ° <br />123 <br />CCR 2661 <br />Permit to repair UST system not obtained (V673) <br />° ❑ ° <br />124 <br />CCR 2635(d) <br />Failed to submit UST Certification of Installation/Modification (V840) <br />❑ ° ° <br />125 <br />CCR 2712(f) <br />Failed to submit a written response within 30 days of receiving an inspection report (V804) <br />❑ 11 11126 <br />HSC 25404(e)(4) <br />Failed to report program data electronically (V817) <br />° ❑ ° <br />On Site Records <br />V R COS <br />201 <br />CCR 2712(b) <br />Failed to maintain alarm logs and/or records of follow up actions (V725) <br />❑ ❑ ° <br />202 <br />CCR 2712(b) <br />Failed to maintain cathodic protection test records on site for at least 6 1/2 years (V733) <br />❑ ❑ ❑ <br />203 <br />CCR 2712(b) <br />Failto maintain eco ds of monitoring, repair, lining, and upgrades on site (V732) <br />❑ ❑ ❑ <br />Received <br />By (initial): <br />Inspecto <br />Inspector <br />Phone:iji <br />69 3f/ <br />'1 <br />EHD 23-01 REV 03/04/15 - -V /) Page 1 Us i INJrtI, i iON REPO K i <br />
The URL can be used to link to this page
Your browser does not support the video tag.