Laserfiche WebLink
February 18, 2015 <br />San Joaquin County <br />Environmental Health Department <br />1868 East Hazelton Avenue <br />Stockton, California 95205-6232 <br />Carl Wayne Henderson <br />SST INC <br />PO Box 31465 <br />Stockton CA 95213 <br />Re: Fast Lane Central Valley <br />116 Roth Rd <br />Lathrop CA 95330 <br />Website: www.sjgov.org/ehd <br />Rhone: (209) 468-3420 <br />Fax: (209) 464-0138 <br />-Ti �e <br />Ecoply <br />DIRECTOR <br />Linda Turkatte, REHS <br />PROGRAM COORDINATORS <br />Robert McClellon, REHS <br />Jeff Carruesco, REHS, RDI <br />Kasey Foley, REHS <br />Rodney Estrada, REHS <br />Adrienne Ellsaesser, REHS <br />SR0071449 <br />The San Joaquin County Environmental Health Department (EHD) has completed the review of <br />the application for a permit to perform a cold start after replacing the battery in the monitoring <br />panel on the underground storage tank (UST) system at the above noted address. The cold <br />start is for the Diesel Truck side and was done on February 2, 2015. The permit has been <br />approved with the following conditions: <br />1. Contact the local fire department and the San Joaquin Valley Air Pollution Control <br />District for any applicable permits and requirements. <br />2. Any changes in information and scope of work must be submitted to EHD for approval <br />prior to commencing work. All new addenda supersede the previous ones. <br />3. Contact Michelle Henry at (209) 468-3454 to arrange the following inspection <br />appointments (a 48-hour notice is required for inspection appointments). Please be <br />aware that inspections for emergency work must be scheduled within five days of permit <br />approval. <br />a. Sensor functionality: Functionality of the monitoring system must be verified to <br />ensure that monitoring has been restored to meet the requirements of Title 23 <br />California Code of Regulations and the Health & Safety Code. A copy of the alarm <br />history shall be printed prior to performing the "cold start" of the Veeder Root system <br />and made available at the time of EHD inspection. <br />b. Overfill prevention verification Verify that external audio and visual alarm activates <br />when tank is 90% full. <br />4. Any individual performing the work of a service technician must meet the following <br />qualifications: <br />a. Possess or be employed by a person who possesses one of several permissible <br />valid, current contractor's licenses issued by the Contractors State License Board <br />(may be issued to the installation company), or a Tank Tester's license issued to the <br />individual by the State Water Board, and <br />