Laserfiche WebLink
On November 29, 2010, Mr. Gill called and asked Ms. Tran what was required on the <br /> October 27, 2010, UST inspection report to return to compliance. Ms. Tran reviewed the <br /> inspection report with Mr. Gill. <br /> On December 2, 2010, Ms. Tran left a voice mail for Mr. Gill informing him that the return <br /> to compliance documents for the October 27, 2010, UST inspection were past due and <br /> that a billable follow up letter would be sent if the documents were not submitted by the <br /> next day. <br /> On December 3, 2010, a Return to Compliance Certification was submitted with <br /> supporting documents in response to the October 27, 2010, UST inspection (Attachment <br /> 46). A payment plan was set up to pay for the operating permit fee, but a letter from the <br /> Chief Financial Officer (part of the financial responsibility documents) was not submitted, <br /> and the corrective actions statement did not address the leaks in the UDC sumps. Ms. <br /> Tran called Mr. Gill and asked him to submit the missing items. Mr. Gill stated he would <br /> do so over the weekend. <br /> On December 7, 2010, Ms. Tran left a voice mail for Mr. Gill asking for the remaining <br /> items required on the October 27, 2010, UST inspection report. These items were <br /> submitted on December 8, 2010 (Attachment 47). <br /> On December 7, 2010, a permit application, SR0061591, was submitted to replace the <br /> 91-octane leak detector. The permit was approved by Ms. Tran on December 8, 2010 <br /> (Attachment 48). <br /> On December 8, 2010, Ms. Tran witnessed the testing of the spill containers at the auto <br /> side of the facility, and the smart sensors at the truck stop side of the facility (Attachment <br /> 49). Testing of the smart sensors was due by October 2010, and were two months late. <br /> A new designated operator was hired in October 2010 and notification was not provided <br /> to the EHD. <br /> On December 10, 2010, a statement indicating the facility's designated operators was <br /> submitted (Attachment 50). <br /> On December 15, 2010, Ms. Tran called and spoke to Mr. Gill reminding him that the <br /> return to compliance documents for the November 22, 2010, UST inspection would be <br /> due by December 22, 2010. <br /> On December 20, 2010, a report was submitted for the monitoring system certification <br /> testing performed on November 22, 2010. This also included a test report for spill <br /> containers tested on December 8, 2010, and smart sensors on the truck stop side of the <br /> facility tested on December 8, 2010. The report for the smart sensors on the truck stop <br /> side did not indicate the date the sensors were tested, and appeared to be intended to <br /> be inserted into the October 27, 2010, monitoring system certification test report <br /> (Attachment 51). <br /> On December 22, 2010, a Return to Compliance Certification and supporting documents <br /> were submitted in response to the November 22, 2010, UST inspection report <br /> (Attachment 52 ). <br /> 10 <br />