Laserfiche WebLink
r. <br />UST SYSTEM RETROFIT OR REPAIR <br />.(Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br />1. Site map enclosed? YES [ ] NX <br />2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br />person installing or testing any component that is repaired or replaced: Ensure a copy of the "Site,Health and Safety <br />Plan" is available on the jobsite as required :by Title 9. <br />3. Detailed description of work to be completed, List components to be repaired or replaced and attach a diagram drawn <br />to. scale showing location of repairs and/or replacements. - If repairing a component, describe how this will be done. (if <br />addinpiping, UDC's, or�other UST equipment, or performing tank top upgrade, use the UST Installation Application <br />pages 4-8 as necessary for a timely plan review): <br />ATG COLDSTART (GASOLIN.SIDE) H-8 Comm alarm (Dead BattpN) <br />Reblaced Battery, restored from archive and checked operation <br />4. List of equipment to be used. (Attach manufacturer's specification sheets showing third -party approval): <br />576010-6954 BATTERY TLS -350 CPU board <br />2 <br />