My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2185
>
2300 - Underground Storage Tank Program
>
PR0231118
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2021 10:40:24 AM
Creation date
9/13/2021 9:14:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231118
PE
2371
FACILITY_ID
FA0003284
FACILITY_NAME
FOOD MART GASOLINE*
STREET_NUMBER
2185
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14113045
CURRENT_STATUS
01
SITE_LOCATION
2185 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2185 E Fremont St, Stockton Record ID PR0231118 <br /> 12/17/2021 UST Inspection <br /> Photo 2: The designated operator failed to check and note the correct test dates for the overfill prevention equipment (tested 9/3/2019) and <br /> secondat containment testing (tested 11/15/2019). <br /> w <br /> w storage T Spection Report <br /> round v,sUat In <br /> U ) Oprater No NA t)ata <br /> Yes lass, <br /> nated _ t ❑ Aerpo�� <br /> - - NrENANCE feted within the pas 912!2429 Di <br /> rQAN� cet cation been camp ast 91 2 • FACILI•C'Y IMI <br /> as i9 Systems mPteted Within the P 21 42p CERS 1D <br /> N ❑ ❑ 1018' <br /> 7 C° Within <br /> t? tainer testing been completed w 9/2412Q Facility Name , <br /> � Ment inspection been 19 acll A <br /> i7 ma'ms? � ❑ ❑ <br /> Has overfill Prevention eAu P 71!1$! <br /> been completed within the past 2Q�a <br /> to• the past 36 months? DESIGN <br /> containment testing ❑ ❑ <br /> Na Hassecandary feted within required X am D <br /> 12 36 months? been comp ne Nimmo <br /> NQ Has tank tightness testing <br /> tp aired ❑ ❑ C Ge�tifi <br /> tmerrames? feted within the req 83o6�1-ut <br /> H' Has line tightness testingbeen comp <br /> th ❑ ❑ ❑ COMP <br /> timeframes? <br /> 3 Other Test/Maintenance: <br /> entity b <br /> r Other Test/Maintenance: ❑ ❑ ❑ <br /> 1 ❑ <br /> Other Test/Maintenance: El ❑ <br /> 11. FACILITY EMPLOYEE TRAINING Yes <br /> 0 <br /> Have au individuals performing facility employee duties received the required facility <br /> employee training within the past 12 months? <br /> 13. COMMENTS <br /> is sectlo"'ybe used to record comments or observations that are not t current compliance <br /> John Alaniz, REHS Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.