Laserfiche WebLink
SAN J U A Q U I N <br />COUNTY - <br />Greatness grows here. <br />November 2, 2021 <br />MEMORANDUM <br />TO: Community Development Department <br />CONTACT PERSONS: Alisa Goulart <br />FROM. Christopher Heylln, Development Services Engineer <br />G"H <br />Development Services Division <br />Department of Public Works <br />Kris Balap, Director of Public Works <br />Fritz Buchman, Deputy Director/Development <br />David Tolliver, Deputy Director/Operations <br />Najee Zarif, Deputy Director/Engineering <br />Kristi Rhea, Business Administrator <br />SUBJECT: PA -2100179; A Site Approval application fora 100 -foot -tall steel lattice radio tower to provide <br />internet service to neighboring parcels; located on the south side of Blackmore Road <br />approximately 335 feet east of the intersection of Blackmore Road and Van Allen Road, <br />Escalon. (Supervisorial District 4) <br />OWNER: Robert A. &Teresa Holmes, Trust <br />ADDRESS: 21444 E. Blackmore Road, Escalon <br />INFORMATION: <br />APPLICANT: Velociter Wireless, Inc. <br />APN: 205-240-23 <br />The site is not currently located within a Federal Emergency Management Agency Designated Flood <br />Hazard Area <br />Blackmore Road has an existing right-of-way width of 40 feet and a planned right-of-way of 50 feet. <br />RECOMMENDATIONS: <br />1) An encroachment permit shall be required for all work within road right-of-way. (Note: Driveway <br />encroachment permits are for flatwork only -all vertical features, including but not limited to, <br />fences, walls, private light standards, rocks, landscaping and cobbles are not allowed in the <br />right-of-way.) (Development Title Sections 9-1145.4 and 9-1145.5) <br />2) Prior to issuance of the occupancy permit, the driveway approaches shall be improved in <br />accordance with the requirements of San Joaquin County Improvement Standards Drawing No. <br />R-17. (Development Title Section 9-1145.5) <br />3) A copy of the Final Site Plan shall be submitted prior to release of building permit. <br />4) The Traffic Impact Mitigation Fee shall be required for this application. The fee is due and <br />payable at the time of building permit application. The fee shall be automatically adjusted July 1 <br />of each year by the Engineering Construction Cost Index as published by the Engineering News <br />Record. (Resolution R-00-433) <br />1810 East Hazelton Avenue � Stockton, California 95205 � T 209 468 3000 � F 209 468 2999 <br />� Follow us on Facebook cr, PublicWorksSJC Visit our website: www.sjgov.org/pubworks <br />