Laserfiche WebLink
Underground Storage Tank <br />Monitoring System Certification Form <br />10. MONITORING SITE PLAN <br />Date site plan was prepared: <br />If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br />with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br />identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br />a legend for all symbols depicted. <br />=:te Addre=_s <br />WESTERN FOOD $ FUEL W32 E. WATERLOO ROAD STOCKTQiJ, CA 95205 <br />V= VAPOR <br />X = SU%fP SENSOR <br />L = LD <br />al=�kilmwz <br />S =Brine sensar <br />I = Smart Sensor <br />S=STP _ . . . . . . . . . <br />C = Fioaa & Ckams . . . . . . . . . . <br />E - Estop <br />ol <br />xeT <br />8F <br />x <br />P <br />v <br />F <br />A <br />....... ....... ..EL .. <br />AW6.. <br />AW ehwo madaff—d 1h& am -T—We io tJw-146-ing iecforicimt ars a <br />prq�assianmi apinewe ooh ®rd ars snla{c ff}r i�i6rmaxfoir�fpenposas. Drawing <br />nor 1v seals <br />Date map was drawn: 9 MIZI) <br />Instructions <br />kPIPaG a <br />(UROWS) <br />Drav-m_q of pipma <br />exit Of Sump and <br />L-DUs. lo <br />tIIlder.E7Dnnd <br />dfall'ing is 3oc=e. <br />Rl Cda nf)t <br />apeLl7iate �`.le <br />plate. <br />i <br />4€ you already have a diagram that shows all required in€ rmation, you may include K rather khan this page, with your htnnilrodng System Certification_ On your site plan, <br />show Hee general layout of tanks and piping. �llearly identrfy locations of the following equipment, if instalk_d: monitoring system matrol panels; sensors manitaring lank <br />annular spaces, surtps, dispenser pans, spill containers, or other seNmdary containment areas mechanical av ekwAronk line leak detectors; and irFtmk liquid levet <br />prnhes (rf used for leak delection). In the space prouided, note :,ae date This Site Plan was prepa-- d. <br />Page 6 of 6 <br />A . <br />.97— <br />a <br />ol <br />xeT <br />8F <br />x <br />P <br />v <br />F <br />A <br />....... ....... ..EL .. <br />AW6.. <br />AW ehwo madaff—d 1h& am -T—We io tJw-146-ing iecforicimt ars a <br />prq�assianmi apinewe ooh ®rd ars snla{c ff}r i�i6rmaxfoir�fpenposas. Drawing <br />nor 1v seals <br />Date map was drawn: 9 MIZI) <br />Instructions <br />kPIPaG a <br />(UROWS) <br />Drav-m_q of pipma <br />exit Of Sump and <br />L-DUs. lo <br />tIIlder.E7Dnnd <br />dfall'ing is 3oc=e. <br />Rl Cda nf)t <br />apeLl7iate �`.le <br />plate. <br />i <br />4€ you already have a diagram that shows all required in€ rmation, you may include K rather khan this page, with your htnnilrodng System Certification_ On your site plan, <br />show Hee general layout of tanks and piping. �llearly identrfy locations of the following equipment, if instalk_d: monitoring system matrol panels; sensors manitaring lank <br />annular spaces, surtps, dispenser pans, spill containers, or other seNmdary containment areas mechanical av ekwAronk line leak detectors; and irFtmk liquid levet <br />prnhes (rf used for leak delection). In the space prouided, note :,ae date This Site Plan was prepa-- d. <br />Page 6 of 6 <br />