Laserfiche WebLink
Nitrate Loading Analysis BSK Job E21-002-01B <br />2482 Carpenter Road July 13, 2021 <br />Stockton, California P a g e | 9 <br /> <br /> <br />6. CONCLUSIONS AND RECOMMENDATIONS <br /> <br />6.1 Conclusions and Recommendations: <br /> <br />The impact of nitrogen loading from the site should not change due to the fact the amount nitrate - <br />nitrogen containing recharge water from the adult care facility will remain the same. The site project is <br />concentrated on replacing the current septic/leech line system with a commercial septic system. <br /> <br />However, if a reduction of the nitrate-nitrogen load in the recharge water of the adult care facility is <br />required, BSK recommends that the proposed septic system be installed with a nitrate-nitrogen <br />pretreatment system like the Fujiclean CEN21 that would lower the nitrate-nitrogen load by at least 70%. <br />This value should be confirmed by the manufacturer after they design a system specific to this project. <br />BSK also recommends re-evaluation of nitrate loading should the design details of the facility change such <br />as number of users or size of the facility. <br /> <br />