Laserfiche WebLink
To: Erica Rodriguez<erodriguez@wpinc.com> <br /> Cc: EH-UST<ust@sigov.org>; 'Steve n.J.Jones@sheII.com' <Steven.J.Jones@sheII.com>;Jake Prowse <br /> <JProwse@wpinc.com>; Ryan Hultner<rhultner@wpinc.com>;theresa.geiier@shell.com; Rivera, Stacy [EHD] <br /> <srivera@sigov.org> <br /> Subject: RE: Piping Closure in Place Application and Information_3515 Navy Drive., Stockton CA <br /> Good morning Erica, <br /> The cross sectional drawing of the piping, proposed angle boring, and calculations for borings have not been submitted <br /> with the permit application. <br /> Please submit the above mentioned elements. <br /> If you have any questions,just let me know. <br /> Thank you for your time, <br /> Frederick Ernest <br /> Environmental Health Specialist <br /> San Joaquin County Environmental Health <br /> 209-616-3026 <br /> fernest@sigov.org ,, II <br /> SKJ OAQ U I <br /> COUNTY <br /> Greatness grows here. <br /> From: Erica Rodriguez<erodriguez@wpinc.com> <br /> Sent: Wednesday, September 29, 202110:38 PM <br /> To: Ernest, Frederick [EHD] <fernest@s]gov.org>; Rivera, Stacy [EHD] <srivera@sigov.org> <br /> Cc: EH-UST<ust@sigov.org>; 'Steve n.J.Jones@sheII.com' <Steven.J.Jones@sheII.com>;Jake Prowse <br /> <JProwse@wpinc.com>; Ryan Hultner<rhultner@wpinc.com>;theresa.geiier@shell.com <br /> Subject: Piping Closure in Place Application and Information_3515 Navy Drive., Stockton CA <br /> CAUTION:This email is originated from outside of the organization. Do not click links or open attachments unless you recognize the <br /> sender and know the content is safe. <br /> Ms. Rivera and Mr. Ernest, <br /> Attached please find a revised permit text to close the piping in place at the above mentioned location based on verbal <br /> discussion to Steven J.Jones and Ryan Hultner while onsite. <br /> The primary reasons for the closure in place are 1)the proximity to other in-use equipment which is a safety hazard.2) <br /> Location of the piping run within the containment area for the loading racks,compromise in this area could result in a <br /> safety concern. <br /> It was requested that WPI Construction answer the following questions: <br /> 1) Means and method to slurry the pipe in place <br /> 2 <br />