My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCUST
>
805
>
2800 - Aboveground Petroleum Storage Program
>
PR0516480
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2021 10:06:12 AM
Creation date
9/21/2021 8:16:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0516480
PE
2832
FACILITY_ID
FA0010466
FACILITY_NAME
CALIFORNIA FREIGHT
STREET_NUMBER
805
Direction
S
STREET_NAME
LOCUST
STREET_TYPE
AVE
City
RIPON
Zip
95366
APN
25935010
CURRENT_STATUS
01
SITE_LOCATION
805 S LOCUST AVE
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S A N J 0 A Q I I I Irl Environmental Health Department <br /> CCUNTY <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Address: Date: <br /> CALIFORNIA FREIGHT 805 S LOCUST AVE, RIPON September 20, 2021 <br /> SPCC Plan Requirements for Onshore Facilities(excluding production facilities) <br /> 721 CFR 112.8(d)(1) Failed to provide corrosion protection for buried piping ❑V ❑R ❑COS <br /> 722 CFR 112.8(d)(2) Failed to cap/blank-flange connection at transfer point and mark its origin if not in service ❑V ❑R ❑COS <br /> 723 CFR 112.8(d)(3) Failed to design pipe supports to minimize abrasion/corrosion and to allow for expansion/contraction ❑V ❑R ❑COS <br /> 724 CFR 112.8(d)(4) Failed to regularly inspect aboveground valves,piping,and appurtenances ❑V ❑R ❑COS <br /> 725 CFR 112.8(d)(4) Failed to conduct integrity and leak testing on buried piping any time it is worked on ❑V ❑R ❑COS <br /> 726 CFR 112.8(d)(5) Failed to adequately warn vehicles entering facility to protect piping and other transfer operations ❑V ❑R ❑COS <br /> 727 CFR 112.7(a)(1), Plan failed to adequately describe overfill prevention methods for each container ❑V ❑R ❑COS <br /> 112.8(c)(8) <br /> Other Violations <br /> 4010 See below Unlisted Administration/Documentation violation ❑V ❑R ❑COS <br /> 4020 See below Unlisted Training violation ❑V ❑R ❑COS <br /> 4030 See below Unlisted Operations/Maintenance violation ❑V ❑R ❑COS <br /> 4040 See below Unlisted Release/Leaks/Spills violation ❑V ❑R ❑COS <br /> 4050 See below Unlisted Abandon ment/lIlegal Disposal/Unauthorized Treatment violation ❑V ❑R ❑COS <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 102 CFR 112.3, 112.6 Failed to prepare a written SPCC Plan in accordance with CFR Part 112. <br /> OBSERVATION: This facility has an Aboveground Petroleum Storage Act(APSA)regulated shell capacity of 12,680 <br /> gallons, and the facility has not prepared and implemented a professional engineer certified Spill Prevention, <br /> Control, and Countermeasure(SPCC) Plan. The EHD inspectors observed the following regulated APSA tanks: <br /> 12,000 gallon diesel tank,400 gallon used oil tank, 2 x 140 gallon new oil tanks. <br /> REGULATION GUIDANCE: All facilities which have an APSA regulated shell capacity of 1,320 gallons or greater <br /> shall prepare a written SPCC Plan which meets all of the requirements of the 40 CFR Part 112. This plan shall be <br /> certified by a professional engineer in accordance with 40 CFR 112.3(d). <br /> CORRECTIVE ACTION: Immediately prepare and implement an SPCC Plan in accordance with 40 CFR Part 112, <br /> which includes all aboveground petroleum storage containers 55 gallons or larger. A copy of this plan shall be <br /> maintained on-site, as required. Submit a copy of the SPCC Plan to the EHD for review;this copy will be returned to <br /> the facility after it has been reviewed by the EHD. <br /> This is a repeat violation, Class II. <br /> Overall Inspection Comments: <br /> Complete and submit a copy of the Return to Compliance Certification form to the EHD with a statement <br /> documenting the corrective actions that have been or will be taken for each violation, and any supporting <br /> paperwork, by 11/5/2021. <br /> To minimize person to person contact EHD is choosing to write the name of person receiving the report instead <br /> of having them sign. Starting September 1, 2018, all in-office CERS help will be provided at EHD hourly rate <br /> FA0010466 PR0516480 SCO01 09/20/2021 <br /> EHD 28-01 Rev.9/16/2020 Page 4 of 5 Aboveground Petroleum Storage Act OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.