Laserfiche WebLink
g. The first twenty(20)feet of anV driveway shall be surfaced with asphalt concrete or Portland <br /> cement concrete to ensure public roadways will be free from debris. <br /> h. Traffic Impact Mitigation Fees and Regional Transportation Impact Fees shall be required. <br /> This fee is due and payable prior to issuance of a grading or building permit and prior to <br /> operation. <br /> i. Water Supply Impact Mitigation(WIMF)Fees shall be required if the prosect is located within <br /> the established WIMF boundary.This fee is due and payable prior to issuance of a grading or <br /> building permit and prior to operation. <br /> j. An encroachment permit shall be required for all work within the County,City,or Caltrans <br /> right of waV.Any driveway approaches shall be improved in accordance with the <br /> requirements of the County,City or Caltrans standards prior to operating. <br /> k. Storm drainage facilities shall be in accordance with San Joaquin County Development <br /> Standards. <br /> I. If the prosect site falls within a NPDES Phase 1 or Phase 2 regulated area,the prosect shall <br /> comply with the National Pollutant Discharge Elimination System requirements.Calculations <br /> and plans shall be submitted and approved by the Department of Public Works-Water <br /> Resources Division prior to issuance of a building permit,grading permit,and improvements <br /> shall be completed prior to operating. <br /> (Ord.3675,3697;3715;3739;3756;Ord.3891,§2,1996;Ord.3911,§5,1997,amended during 8/97 supplement, <br /> Ord.3970,§1,1998;Ord.3998,§2,1998;Ord.3399,§5,1998;Ord.4106,§8,2001;Ord.4181,§2,2002;Ord. <br /> 4255,§5,2005;Ord.No.4385,§11,1-12-2010;Ord.No.4399,§5,9-14-2010;Ord.No.4404,§1,12-14-2010; <br /> Ord.No.4486,§3,9-13-2016;Ord.No.4508,§2,6-6-2018;Ord.No.4531,§4,5-21-2019;Ord.No.4531,§4,5- <br /> 21-2019;Ord.No.4568,§4,1-26-2021) <br /> Created: 2021-05-28 17:17:27 [EST] <br /> (Supp.No.104,3-21,Rev.) <br /> Page 4 of 11 <br />