My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
2800 - Aboveground Petroleum Storage Program
>
PR0516198
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2022 2:54:23 PM
Creation date
9/29/2021 9:05:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0516198
PE
2832
FACILITY_ID
FA0000650
FACILITY_NAME
GAS & SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
01
SITE_LOCATION
1002 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN Environmental Health Department <br /> COUNTY <br /> °r='F° Greatnrss qrm+. <br /> al <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Nanni Facility Phoma: Data: <br /> Gemco Ripon Truck Plaza Inc. (209)599-5900 February 10,2020 <br /> FacilityAndress: CERSID: <br /> 1022 E FRONTAGE RD,RIPON,CA 95388 :�j 10180637 <br /> Inspection Commie Tell Phone: <br /> Gurpreet Singh Johal Manager p- <br /> InspectianTypa: Program: <br /> ROUTINE INSPECTION-Operating Permit 2832-AST FAC 10K-</=100 K GAL CUMULATIVE <br /> consent Fa: CarH.wt Even By: <br /> O Inspection Ox Photos ❑Samples Gurpreet Singh Johal, Manager <br /> CCR=Caffmna Core M RegulMom kill=Hem and Safety Cattle CFR=Tide 40 Code of Pereira fiNuldom <br /> V=mi R=Repeatmomon COS=Cone Cel on 9le Nn9li <br /> or Aboveground Petroleum Storage Act <br /> 101 HSC 25270ad) Failed to pay APSA program annual fees .V .R .COS <br /> 102 HSC 25270A.5(a) Failed to prepare written SPCC Plan In accordance with CFR Part 112 is V o R e COS <br /> 103 HSC 25270.6(a) Failed to ie HMBP or armed facility tan k statem ant is c eCOS <br /> 104 HSC 25270.8 Failed to report a lie or releases of 42 gallons(one barrel)or mom c c cCOS <br /> 105 CFR 112.1(bX3k 112.2 Famre to property dose tanks when makln g a claim of perman ently closed is is eCOS <br /> 106 HSC 25404.1.2 FaieE to slbmb a call cation and written resp onse wild n 30 days for mi nor viol atiorre eV c eCOS <br /> 107 HSC 25270.2(ill Faiure to prepare SPCC plan when facility no longer meets oil-filled electrical equipment extimicn eV c eCOS <br /> 108 HSC 25270A.5(a) Faiure of conditionally exempt facility to conduct Inspections or Install secondary containment eV c eCOS <br /> 10) HSC 25270.2(.X1 XC) Failu re to have secondary containment antllor leak detection if Tlu GA pip Ing can not be viewed eV c eCOS <br /> i 111 <br /> 110 HSC 25404mi Failed to report program data inthe California Environmental Reporting System(CERS) c c cCOS <br /> 111 HSC 25270.2mX8) Failure of a Till am less than 55 gallons capacity to have secondary containment and a l.g eV c eCOS <br /> 112 CFR 112.20m) Failu re to complete and m aintain a Sub mantial H arm Criteria certification .V .R .COS <br /> Requirement to Prepare and Implement a SPCC Plan <br /> 201 CFR 112.3(b) Failure to have a licensed PE properly review and certify the SPCC plan .V .R .COS <br /> 202 CFR 112.3(e)(i) Failed to maintain a copy of the Plan on site e V e R e COS <br /> 203 CFR 112.3 Fel to implement the SPCC Plan is c cCOS <br /> 204 CFR 112.3(g) Faure t.prepare SPCC Plen when facility rat longer meds Qualified Facility criteria .V e R e COS <br /> 205 CFR 112.3,112.6 Fal to prepare SPCC Plan that meets all applicable requirements in V o R o COS <br /> 206 CFR 112.3(b)(1) Failu re of owner to assure that the PE makes all requi red attestati ons In the PI an .V .R .COS <br /> Amendment of SPCC Plan by Owners a Operators <br /> 301 CFR 112.5(a) Failed to amend Plan as necessary .V .R .COS <br /> 302 CFR 112.5(b) Failed to revew Plan once every Me years antllor implement myrooming amendments .V .R .COS <br /> 303 CFR 112.5(C) Failed to have a PE certify technical amendments o V e R e COS <br /> 304 CFR 112.5(a),112.5(b) Failureto Implement SPCC plan amendments wthln 6 months c c cCOS <br /> Qualified Facility- <br /> 401 CFR 112.fi(a),112.6(b) Tier I Qualified Facility Plan not carded by the owner or a PE e V e R e COS <br /> 402 CFR 112.6(aN2) Owner MTlerl Qualified Facilltyfaileb to self certify technical amendment .V .R .COS <br /> 403 CFR 112.61 1 Ranfisab oprontoa eadmil Ye dflowttdai quaN4y of dl potentially tliecholl .V .R .COS <br /> FMOJNW PROB161M SM01 02102021 <br /> EHD28u01 R—W21r21119 Pagel of Abovgy J Paraarn Smrae AC OIR <br /> 1868 E. Hazelton Avenue I Stockton,California 95205 1 T 209 468-34201 F 209 464-0138 1 www.sjcehd.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.