OWNER
<br />STOCKTON UNIFIED SCHOOL DISTRICT
<br />701 N. MADISON STREET
<br />STOCKTON, CA 95202
<br />(209) 933-7000
<br />CONTACT: MICHELLE SPRAGG
<br />EMAIL: mspragg@stocktonusd.net
<br />PROJECT ARCHITECT
<br />TETER, LLP
<br />7535 N. PALM AVE., SUITE 201
<br />FRESNO, CA 93711
<br />(559) 437-0887
<br />CONTACT: AYA SHITANISHI
<br />E-MAIL: aya.shitanishi@teterae.com
<br />ELECTRICAL ENGINEER
<br />CIVIL ENGINEER
<br />MECHANICAL/PLUMBING ENGINEERSTRUCTURAL ENGINEER MODULAR BUILDING
<br />BLAIR, CHURCH, & FLYNN
<br />451 CLOVIS AVE., SUITE 200
<br />CLOVIS, CA 93612
<br />(559) 326-1400
<br />CONTACT: LANE BADER
<br />EMAIL: lbader@bcf-engr.com
<br />AMERICAN MODULAR SYSTEMS, INC.
<br />787 SPRECKLES AVE.
<br />MANTECA, CA 95336
<br />(209) 825-1921
<br />CONTACT: MATTHEW REICHMUTH
<br />EMAIL: matthew.r@americanmodular.com
<br />TETER, LLP
<br />7535 N. PALM AVE., SUITE 201
<br />FRESNO, CA 93711
<br />(559) 437-0887
<br />CONTACT: ERIC BAILEY
<br />E-MAIL: eric.bailey@teterae.com
<br />TETER, LLP
<br />7535 N. PALM AVE., SUITE 201
<br />FRESNO, CA 93711
<br />(559) 437-0887
<br />CONTACT: STEVEN JONES
<br />E-MAIL: steven.jones@teterae.com
<br />AURUM CONSULTING ENGINEERS
<br />60 GARDEN COURT, SUITE 210
<br />MONTEREY, CA 93940
<br />(831) 646-3330
<br />CONTACT: MARTIN PEREZ
<br />E-MAIL: martin@acemb.com
<br />LANDSCAPE ARCHITECT
<br />BLAIR, CHURCH, & FLYNN
<br />451 CLOVIS AVE, SUITE 200
<br />CLOVIS, CA 93612
<br />(559) 326-1400
<br />CONTACT: DAVE BRILEY
<br />EMAIL: dbriley@bcf-engr.com
<br />NORTH
<br />SITE
<br />4
<br />120
<br />99
<br />5
<br />12
<br />88
<br />STOCKTON
<br />FRENCH
<br />CAMP
<br />LANTHROP MANTECA
<br />RIPON
<br />GARDEN ACRES
<br />MORADA
<br />LODI
<br />120
<br />120
<br />4
<br />4
<br />NORTH
<br />SITE
<br />5
<br />W . M A R C H L N .QUAIL LAKES DR.ALEXANDRIA PL.CEDAR
<br />RIDGE DR.PERSHING AVEPACIFIC AVEW . R O B I N H O O D D R .
<br />GENERAL
<br />APN: 108-020-040-000
<br />ADDRESS: 2111 QUAIL LAKES DRIVE, STOCKTON, CA 95207
<br />SITE AREA: 6.0 ACRES
<br />CALIFORNIA BUILDING CLIMATE ZONE: 12
<br />PARCEL ZONING: SCHOOL
<br />FLOOD ZONE: ZONE X PER FEMA FIRM 060302 PANEL 0455F
<br />PROJECT DESCRIPTION
<br />THIS PROJECT CONSISTS OF THE CONSTRUCTION OF A NEW PERMANENT
<br />MODULAR ADMINISTRATION/LIBRARY BUILDING, A SITE BUILT MULTI-PURPOSE
<br />BUILDING, A PERMANENT MODULAR TWO STORY CLASSROOM BUILDING, A
<br />PERMANENT KINDERGARTEN BUILDING, AND ASSOCIATED SITEWORK ON AN
<br />APPROXIMATELY 6-ACRE SITE. THE SITE-BUILT BUILDING WILL BE OF COLD
<br />FORMED STEEL STUD & STRUCTURAL STEEL FRAMING WITH METAL DECKS,
<br />METAL WALL AND ROOF FRAMING, AND CONCRETE SLAB-ON-GRADE.
<br />GOVERNING CODES
<br />2016 CALIFORNIA BUILDING STANDARDS ADMINISTRATIVE CODE (CAC),
<br />PART 1, TITLE 24 C.C.R., EFFECTIVE JULY 1, 2014
<br />2016 CALIFORNIA BUILDING CODE (CBC), PART 2, TITLE 24 C.C.R.
<br />2016 CALIFORNIA ELECTRICAL CODE (CEC), PART 3, TITLE 24 C.C.R.
<br />2016 CALIFORNIA MECHANICAL CODE (CMC), PART 4, TITLE 24 C.C.R.
<br />2016 CALIFORNIA PLUMBING CODE (CPC), PART 5, TITLE 24 C.C.R.
<br />2016 CALIFORNIA FIRE CODE (CFC), PART 9, TITLE 24 C.C.R.
<br />2016 CALIFORNIA REFERENCED STANDARDS, PART 12, TITLE 24 C.C.R.
<br />2016 CALIFORNIA ENERGY CODE, PART 6, EFFECTIVE JULY 1, 2014
<br />2016 CALIFORNIA GREEN BUILDING STANDARDS CODE (CALGREEN), PART II,
<br />TITLE 24 C.C.R.
<br />1990 TITLE 19 C.C.R., PUBLIC SAFETY, STATE FIRE MARSHAL REGULATIONS
<br />NFPA 13 STANDARDS FOR THE INSTALLATION OF FIRE SPRINKLERS
<br />(2013 EDITION - CA AMENDED)
<br />NFPA 24 STANDARDS FOR THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS
<br />AND THEIR APPURTENANCES (2013 EDITION - CA AMENDED)
<br />NFPA 25 STANDARD FOR INSPECTION, TESTING, AND MAINTENANCE OF WATER-
<br />BASED FIRE PROTECTION SYSTEMS (2011 CA EDITION)
<br />NFPA 72 NATIONAL FIRE ALARM AND SIGNALING CODE (2013 EDITION)
<br />UL 38 MANUAL SIGNALING BOXES FOR FIRE ALARM SYSTEMS (2005 EDITION)
<br />UL 268 SMOKE DETECTORS AND FIRE ALARM SYSTEMS (2009 EDITION)
<br />UL 268A SMOKE DETECTORS FOR DUCT APPLICATIONS(1998 EDITION)
<br />UL 464 AUDIBLE SIGNAL APPLIANCES (2003 EDITION)
<br />UL 521 HEAT DETECTORS FOR FIRE PROTECTIVE SIGNALING SYSTEMS
<br />(1999 EDITION)
<br />UL 1424 CABLES FOR POWER-LIMITED FIRE-ALARM CIRCUITS (2005 EDITION)
<br />UL 1971 SIGNALING DEVICES FOR THE HEARING IMPAIRED (2004 EDITION)
<br />AMERICANS WITH DISABILITIES ACT
<br />ENFORCING AGENCY
<br />DIVISION OF THE STATE ARCHITECT, SACRAMENTO
<br />CITY OF STOCKTON FIRE DEPARTMENT
<br />CITY OF STOCKTON (OFFSITE DEVELOPMENT REVIEW AND APPROVE)
<br />OFFSITE IMPROVEMENT WORK INVOLVING BUT NOT LIMITED TO PAVING, WET
<br />AND DRY UTILITIES AND LANDSCAPE SHALL BE REVIEWED AND APPROVED BY
<br />THE CITY OF STOCKTON.
<br />NOTES
<br />1. A COPY OF TITLE 24 C.C.R. PARTS 1 AND 2 SHALL BE KEPT ON THE JOB SITE
<br />AT ALL TIMES.
<br />2. CHANGES TO THE STRUCTURAL, ACCESSIBILITY OR FIRE AND LIFE-SAFETY
<br />PORTIONS OF THE APPROVED PLANS AND SPECIFICATIONS AFTER THE WORK
<br />HAS BEEN LET SHALL BE MADE BY A CONSTRUCTION CHANGE DOCUMENT AS
<br />REQUIRED IN SECTION 4-338, PART 1, CAC, AND SHALL BE SUBMITTED TO, AND
<br />APPROVED BY DSA PRIOR TO COMMENCEMENT OF THE WORK.
<br />CONSTRUCTION CHANGE DOCUMENTS SHALL BE PREPARED AND SUBMITTED
<br />TO DSA IN COMPLIANCE WITH DSA INTERPRETATION OF REGULATION IR A-6.
<br />3. ALL TESTS TO CONFORM TO THE REQUIREMENTS OF TITLE 24 SECTION
<br />4-335, PART 1, AND APPROVED T & I SHEET.
<br />4. TESTS OF MATERIALS AND TESTING LABORATORY SHALL BE IN
<br />ACCORDANCE WITH TITLE 24 SECTION 4-335, PART 1, AND THE DISTRICT SHALL
<br />EMPLOY AND PAY THE LABORATORY. COSTS OF RETEST MAY BE BACK
<br />CHARGED TO THE CONTRACTOR.
<br />5. DSA SHALL BE NOTIFIED AT THE START OF CONSTRUCTION AND PRIOR TO
<br />THE PLACEMENT OF THE CONCRETE PER TITLE 24 SECTION 4-331, PART 1.
<br />6. A CLASS 2 INSPECTOR REQUIRED FOR THIS PROJECT SHALL BE EMPLOYED
<br />BY OWNER AND APPROVED BY ARCHITECT, STRUCTURAL ENGINEER, AND DSA.
<br />INSPECTOR SHALL BE IN ACCORDANCE WITH SECTION 4-333(c). THE DUTY OF
<br />THE INSPECTOR SHALL BE IN ACCORDANCE WITH TITLE 24 SECTION 3-342,
<br />PART 1.
<br />7. SUPERVISION OF CONSTRUCTION BY DSA SHALL BE IN ACCORDANCE WITH
<br />TITLE 24 SECTION 4-334, PART 1.
<br />8. CONTRACTOR, INSPECTOR, ARCHITECT, AND ENGINEERS SHALL SUBMIT
<br />VERIFIED REPORTS (FORM SSS-6) IN ACCORDANCE WITH TITLE 24 SECTION
<br />4-336, PART 1.
<br />9. THE ARCHITECT AND THE STRUCTURAL ENGINEER SHALL PERFORM THEIR
<br />DUTIES IN ACCORDANCE WITH TITLE 24 SECTION 4-333(a) AND 4-341, PART 1.
<br />10. THE CONTRACTOR SHALL PERFORM HIS DUTIES IN ACCORDANCE WITH
<br />TITLE 24 SECTION 4-343, PART 1.
<br />11. THE INTENT OF THE DRAWINGS AND SPECIFICATIONS IS TO CONSTRUCT
<br />THE SCHOOL BUILDINGS IN ACCORDANCE WITH TITLE 24 C.C.R. SHOULD ANY
<br />CONDITIONS DEVELOP NOT COVERED BY THE CONTRACT DOCUMENTS
<br />WHEREIN THE FINISHED WORK WILL NOT COMPLY WITH SAID TITLE 24 C.C.R., A
<br />CHANGE ORDER DETAILING AND SPECIFYING THE REQUIRED WORK SHALL BE
<br />SUBMITTED TO AND APPROVED BY THE OFFICE OF REGULATION SERVICES
<br />BEFORE PROCEEDING WITH THE WORK.
<br />12. DSA IS NOT SUBJECT TO ARBITRATION.
<br />13. BLEACHERS ARE NOT PART OF DSA STRUCTURAL OR FIRE LIFE AND SAFETY
<br />REVIEW.
<br />ARCHITECT'S SIGNATURE DATE
<br />AYA SHITANISHI
<br />ARCHITECT/ PARTNER
<br />TETER, LLP
<br />C-34089 07-31-19
<br />LICENSE NUMBER EXPIRATION DATE
<br />STATEMENT OF GENERAL CONFORMANCE
<br />FOR ARCHITECTS/ENGINEERS WHO UTILIZE PLANS, INCLUDING BUT NOT LIMITED TO SHOP
<br />DRAWINGS, PREPARED BY OTHER LICENSED DESIGN PROFESSIONALS AND/OR
<br />CONSULTANTS.
<br />APPLICATION NO:.FILE NO:.
<br />THE DRAWINGS OR SHEETS LISTED ON THE COVER OR INDEX SHEET
<br />HAVE BEEN PREPARED BY OTHER DESIGN PROFESSIONALS OR
<br />CONSULTANTS WHO ARE LICENSED AND/OR AUTHORIZED TO PREPARE
<br />SUCH DRAWINGS IN THIS STATE. IT HAS BEEN EXAMINED BY ME FOR:
<br />1. DESIGN INTENT AND APPEARS TO MEET THE APPROPRIATE REQUIREMENTS
<br /> OF TITLE 24, CALIFORNIA CODE OF REGULATIONS AND THE PROJECT
<br /> SPECIFICATIONS PREPARED BY ME, AND
<br />2. COORDINATION WITH MY PLANS AND SPECIFICATIONS AND IS ACCEPTABLE
<br /> FOR INCORPORATION INTO THE CONSTRUCTION OF THIS PROJECT.
<br />THE STATEMENT OF GENERAL CONFORMANCE "SHALL NOT BE CONSTRUED AS RELIEVING
<br />ME OF MY RIGHTS, DUTIES, AND RESPONSIBILITIES UNDER SECTIONS 17302 AND 81138 OF
<br />THE EDUCATION CODE AND SECTIONS 4-336,
<br />4-341, AND 4-344" OF TITLE 24, PART I.
<br />I CERTIFY THAT:
<br />ALL DRAWINGS OR SHEETS LISTED ON THE COVER OR INDEX
<br />THIS DRAWING OR PAGE
<br /> IS/ARE IN GENERAL CONFORMANCE AND HAVE BEEN COORDINATED
<br /> WITH THE PROJECT PLANS AND SPECIFICATIONS
<br />02-117130 39-69
<br />No. C34089SNOEANEYACILR
<br />TS
<br />ETA LAFCAT
<br />ARSHITADEHIT
<br />CISNE C
<br />113.-9NIO-1FIRH ITT, FRESNO HEADQUARTERS VISALIA l BAKERSFIELD l MODESTO l SAN LUIS OBISPOA R C H I T E C T S E N G I N E E R S C O N N E C T E D ETERLLPETERIIIDRAWING TITLEPROJECT NO.
<br />DRAWING DATEDESCRIPTIONMARKproperty rights in thesePLOT DATE:copyright and other reserves its common lawTeter, LLP expresslyinstrument of professionalincorporated herein, as anideas and designsplans. This document, theprior written authorization.any other project withoutin whole or in part, forservice, is not to be usedNOT FORCONSTRUCTION2/5/2019 4:38:31 PMC:\Users\weston.rodberry\Documents\10744-A-SUSD NEW ELEMENTARY SCHOOL-2017_weston.rodberry.rvtG000-1 COVERNEW ELEMENTARY12/18/1818-10744SCHOOLSTOCKTON USD2111 QUAIL LAKES DR., STOCKTON, CA 95207100% CDDNEW ELEMENTARY SCHOOL
<br />2111 QUAIL LAKES DRIVE
<br />STOCKTON UNIFIED SCHOOL DISTRICT
<br />PROJECT DIRECTORY N.T.S.AREA MAPN.T.S.VICINITY MAP
<br />N.T.S.PROJECT INFORMATION N.T.S.ARCHITECT'S STATEMENT
<br />San Joaquin County
<br />Environmental Health Department
<br />1868 E. Hazelton Ave.
<br />Stockton, CA 95205
<br />(209) 468-3420
<br />
<br />APPROVED WITH CONDITIONS
<br />
<br />For conditions, please see approval letter dated:
<br />
<br />Approved by:_______________________Date:_______________
<br />4-4-19
<br />Apr 03, 2019 Maribel Flohrschutz
|