Laserfiche WebLink
KEYNOTES <br />B1 <br />B1 <br />B2 <br />B2 <br />BBBB <br />HS-1 <br />WF-1 <br />MS-1 <br />UTILITY YARD <br />213 <br />MOP <br />216 <br />ELECTRICAL <br />217 <br />CUSTODIAL <br />OFFICE <br />215 <br />HALL <br />232 <br />I.T. <br />218 <br />OFFICE <br />214 <br />DRY STORAGE <br />208 <br />HALL <br />212A <br />HALL <br />212B <br />MOP <br />209 <br />TOILET <br />210 <br />F.S. RISER <br />211 <br />KITCHEN <br />207 <br />TABLE/CHAIR <br />STORAGE <br />206 <br />MULTI-PURPOSE <br />205 <br />WH-1 <br />GWFS-1 <br />FS-2 <br />1 <br />L-2 <br />WC-2 <br />MS-2 <br />4"WCO <br />CP-1 <br />GI-1 <br />FS-1 <br />4" COTG <br />CWD-1 <br />HR-1 <br />CWB-1 <br />@+72"AFF <br />4" <br />4" <br />4" <br />4" <br />FCO <br />(TYP) <br />D <br />DDD1" <br />1" <br />13 <br />3/4" <br />WF-1 13 <br />3/4" <br />14 <br />14 <br />1" <br />2" VTR <br />2" <br />2" <br />1/2" <br />1"8 <br />10 <br />1 1/4" <br />1" <br />1 1/4" <br />3" <br />9 <br />TP-211 <br />12 <br />3" VR TO ABV. <br />STAGE CLG. <br />2 <br />7 <br />8 <br />6 <br />1" <br />3" <br />4" <br />2" <br />3/4" <br />2" <br />HB-1 <br />SA-1 <br />3 <br />@+36"AFF <br />5 <br />4 <br />3" <br />15 <br />2" <br />2" <br />HB-1 <br />S-3 <br />2"GW16 1" <br />3/4"16 F4"FCO <br />FS-1 <br />19 <br />20 <br />3" <br />FS-2 <br />18 <br />18 <br />CD <br />CD <br />17 <br />17 <br />3/4"3/4" <br />FD-1 <br />FD-1 <br />FD-1 <br />FD-1 <br />2" <br />GENERAL NOTES <br />1. ALL SINK FAUCETS & DRAINS SHALL BE INSTALLED <br />BY PLUMBING CONTRACTOR. <br />2. ALL PLUMBING CONNECTIONS, VALVES, ETC. TO <br />KITCHEN EQUIPMENT AND SINK SHALL BE DONE BY <br />THE PLUMBING CONTRACTOR. <br />NORTH TT, FRESNO HEADQUARTERS VISALIA l BAKERSFIELD l MODESTO l SAN LUIS OBISPOA R C H I T E C T S E N G I N E E R S C O N N E C T E D ETERLLPETERIIIDRAWING TITLEPROJECT NO. <br />DRAWING DATEDESCRIPTIONMARKproperty rights in thesePLOT DATE:copyright and other reserves its common lawTeter, LLP expresslyinstrument of professionalincorporated herein, as anideas and designsplans. This document, theprior written authorization.any other project withoutin whole or in part, forservice, is not to be usedNOT FORCONSTRUCTIONB <br />A <br />C <br />D <br />CEDAR RIDGE DR.ALEXANDRIA PL.KEY SITE PLAN <br />3/13/2019 7:53:39 AMP222-1 BLDG. B - MULTI-PURPOSE - ENLARGED PLUMBING PLAN -KITCHENNEW ELEMENTARY12/18/1818-10744SCHOOLSTOCKTON USD2111 QUAIL LAKES DR., STOCKTON, CA 95207100% CDD 1/4" = 1'-0"1BLDG. B - MULTI-PURPOSE - ENLARGED PLUMBING PLAN - KITCHEN <br />NORTH <br />1 WATER HEATER ON FLOOR. SEE DETAIL 5/P800. <br />2 GREASE INTERCEPTOR W/ MANHOLE ACCESS. FLUSH <br />TO FINISH GRADE. <br />3 3/4" CW & HW UP ALONG WALL TO CAN WASH <br />CONTROL BOX. RROVIDE SOV'S IN RISERS. 3/4" HW <br />DN. FROM CONTROL BOX TO BEL. GR. OVER TO CAN <br />WASH DRAIN. <br />4 3/4" HW UP ALONG WALL FROM CONTROL BOX <br />OUTLET AND OVER TO HOSE REEL. <br />5 HOSE REEL MOUNTED ON WALL AT 6'-0" ABOVE CAN <br />WASH FLOOR. <br />6 3/4" CW & HW DN., 3" S DN. W/ 2" VENT OFFSET BEL. <br />FLR. FOR MOP SINK. <br />7 1-1/2" CW DN., 4" S DN. & 2" VR FOR WATER CLOSET. <br />8 1/2" CW & HW DN., 2" S DN. & 1-1/2" VR FOR HAND <br />WASH SINK (LAV.) <br />9 3/4" CW & HW DN. TO (2) POT SINK FAUCETS. PROVIDE <br />STOPS IN CW/HW DROPS. <br />10 CONNECT 2" IW TO EACH SINK BOWL, CONNECT <br />TOGETHER & DISCHARGE 2" IW DN. INTO FLOOR SINK <br />W/ 2" AIR GAP. <br />11 1/2" CW DN. W/ SOV TO TRAP PRIMER IN WALL BEHIND <br />ACCESS DOOR @+12" AFF. <br />12 1/2" CW BEL. FLR. FROM TP-2 TO DRAINS (TYPICAL). <br />13 3/4" CW DN. TO SELF-COOK CENTER WATER FILTER <br />MOUNTED ON WALL. PROVIDE SOV & UNION AT INLET. <br />ROUTE FILTERED CW TO COOK CENTER CONNECTION. <br />14 CONNECT 2" IW TO SELF COOK CENTER & DISCHARGE <br />DN. INTO FLOOR SINK. <br />15 3/4" CW & HW DN. TO BEL. GR. OVER TO CAN WASH. <br />16 COND. DRAIN DROP FROM HC UNIT ON ROOF. <br />17 CONNECT 3/4" CD TO EVAPORATOR COIL OVERHEAD <br />IN WALK-IN BOX. ALL CONDENSATE DRAIN PIPING IN <br />WALK-IN BOXES SHALL BE WRAPPED WITH "RAYCHEM <br />XL TRACE" SELF-REGULATING HEATING CABLE FOR <br />FREEZE PROTECTION. CONNECT HEATING CABLE TO <br />EVAPORATOR COIL TERMINAL BLOCK PER <br />MANUFACTURER'S INSTRUCTIONS FOR REQUIRED <br />ELECTRICAL. <br />18 3/4" CD DN & OFFSET THRU WALL. SEAL W/ G.E. <br />SILICONE SEALANT. PROVIDE COND. DRAIN TRAP PER <br />DETAIL 12/P800 AND DISCHARGE DN INTO FLOOR SINK <br />W/ 2" AIR GAP. <br />19 3/4" CW & HW DN TO PREP SINK FAUCET. PROVIDE <br />STOPS IN CW/HW DROPS. <br />20 CONNECT 2" IW TO SINK BOWL & DISCHARGE DN INTO <br />FLOOR SINK W/ 2" AIR GAP. <br />3" <br />3" VTR <br />6 <br />Exp. 06-30-20CEEOTTSAM CFLAACHNIAIROFNLAIGERM32797SESTIEVTEERDNA.E E R <br />JNI <br />O <br />GN <br />ESNLEANOIS <br />FESROP