My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Q
>
QUAIL LAKES
>
2111
>
1600 - Food Program
>
PR0506552
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2021 1:29:29 PM
Creation date
10/1/2021 1:27:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0506552
PE
1626
FACILITY_ID
FA0007497
FACILITY_NAME
LAKESIDE CHRISTIAN ELEMENTARY
STREET_NUMBER
2111
STREET_NAME
QUAIL LAKES
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
10802004
CURRENT_STATUS
02
SITE_LOCATION
2111 QUAIL LAKES DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAPPED TEE <br />CONDENSATE DRAIN. SEE <br />PLAN FOR SIZE AND <br />CONTINUATION. <br />CONDENSATE DRAIN). <br />(SAME SIZE AS <br />STAINLESS STEEL <br />HOSE CLAMPS. <br />NEOPRENE HOSE. <br />FOR CLEANOUT. <br />PLUG FOR DRAW <br />THRU UNITS. <br />EQUIP. <br />MECH. <br />1" MINIMUM <br /> 3" MINIMUM <br />WALL. <br />CONDENSATE DRAIN LINE <br />FROM A/C UNIT. <br />CHROME PLATED <br />EXCUTCHEON. <br />CHROME PLATED <br />COPPER TUBING. <br />FINISH FLOOR. <br />1-1/2" TAILPIECE. <br />TEE CONNECTION. <br />1-1/4" TAILPIECE. <br />LAVATORY OR SINK. <br />COPPER TUBING. <br />NOTE: <br />ALL CLEANOUT BOXES WITHIN 10' OF <br />EACH OTHER SHALL BE LINED UP WITH <br />EACH OTHER AND PARALLEL TO <br />SIDEWALK OR BUILDING WALL. <br />3" <br />FINISH GRADE. <br />CLEANOUT BOX. <br />CLEANOUT PLUG. <br />18"x18"x4" CONCRETE PAD <br />UNPAVED AREA <br />RAISE ABOVE GRADE 1". <br />PAVED AREA <br />VALVE BOX TO BE FLUSH <br />WITH FINISH CONCRETE. <br />SCHEDULE 40 PVC PIPE <br />EXTENSION. <br />PROVIDE MIN. 6" GRAVEL <br />FOR DRAINAGE BASE. <br />PLUGGED WYE AT <br />END OF LINE <br />NIPPLE. <br />CAP. <br />3" MINIMUM. <br />TEE FITTING. <br />SHUT-OFF VALVE. <br />GAS <br />SUPPLY. <br />TO <br />UNIT. <br />UNION. <br />SEE PLAN <br />FOR SIZE. <br /> NOTE: <br />1/8" THICK PLASTIC. <br />3" HIGH BLOCK LETTERS. <br />WHITE ON RED BACK- <br />GROUND. (WEATHER- <br />PROOF <br />PAINT) <br />4) 3/16" MOUNTING <br />HOLES. <br />SIGN TO BE CONSPICUOUSLY LOCATED ABOVE <br />BUILDING GAS SHUT-OFF VALVE ON EXTERIOR WALL. <br />GAS <br />VALVE <br /> 18" <br /> 1" <br /> 3" <br /> 1" <br /> 3" <br /> 1" <br /> 9" <br />NOTE: <br />BASE FOR DRAINAGE. <br />SCHEDULE 40 PVC PIPE <br />PROVIDE MIN. 6" GRAVEL <br />SYSTEM, SEE PLAN FOR <br />SERVICE FROM DISTRIBUTION <br />EXTENSION. <br />VALVE BOX. <br />UNION. <br />SERVICE TO BUILDING <br />WALK OR BUILDING WALL. DO <br />OTHER AND PARALLEL TO SIDE- <br />SHALL BE LINED UP WITH EACH <br />WITHIN 10'-0" OF EACH OTHER <br />ALL SHUT-OFF VALVE BOXES <br />FINISH GRADE. <br />NOT LOCATE IN SIDEWALKS. <br />SEE PLAN FOR TYPE <br />AND SIZE. <br />TYPE AND SIZE. <br />RAISE ABOVE GRADE 1" <br />18"x18"x4" CONCRETE PAD <br />UNPAVED AREA <br />WITH FINISH CONCRETE. <br />VALVE BOX TO BE FLUSH <br />PAVED AREA <br /> 3" <br />D <br />NORMALLY OPEN SOLENOID DRAIN VALVE <br />PROVIDED W/ UNIT, INSTALLED BY PLUMBING <br />CONTRACTOR. <br />FOR ATTACHMENT <br />OF CURB AND <br />PEDESTAL SEE <br />MECHANICAL. <br />MAKE-UP AIR UNIT <br />FANEVAPORATIVE COOLER <br />3/4" WATER. <br />WOODFORD Y24 <br />HOSE BIBB. <br />1" OVERFLOW. <br />NORMALLY CLOSED <br />SOLENOID VALVE. <br />NORMALLY OPEN SOLENOID VALVE. <br />P-TRAP. <br />INSULATE THE <br />WATER LINE UP <br />TO & INCLUDING <br />THE SOLENOID <br />VALVE. <br />1" DRAIN. <br />MANUFACTURE'S CONCENTRIC <br />VENT KIT THROUGH ROOF <br />WITH TALL CONE FLASHING <br />AND COUNTER FLASHING. <br />SHEET METAL SPACER. <br />SUPPORT CONCENTRIC FITTING <br />WITH MANUFACTURER <br />SUPPLIED STRAP. <br />3" POLYPROPYLENE <br />COMBUSTION AIR. <br />3" POLYPROPYLENE VENT. <br />CEILING BUCKET. <br />12" MIN <br />H <br />C C.W. COPPER TUBE INLET. <br />DUAL OUTLET ANGLE VALVE. <br />SINK OR LAV. <br />INSTANTANEOUS WATER <br />HEATER MOUNTED ON BACK <br />WALL OF CABINET OR ON <br />WALL BELOW LAV. <br />IN-LINE FLOW <br />CONTROL. <br />H.W. COPPER TUBING <br />TO <br />SINK FAUCET. <br />10" MIN <br />HOT WATER <br />RETURN <br />3"∅POLYPROPYLENE <br />VENT PIPE UP TO <br />CONCENTRIC VENT ASSEMBLY. <br />3"∅POLYPROPYLENE AIR <br />INTAKE UP TO CONCENTRIC <br />VENT ASSEMBLY. <br />3/4" CONDENSATE DRAIN. <br />BALL VALVE. (TYP) <br />CP-1, CIRCULATING PUMP. <br />CHECK VALVE. (TYP) <br />AQUASTAT. <br />ET-1, THERMAL EXPANSION TANK. <br />16 GA x 2" STRAP AROUND <br />WATER HEATER. ATTACH <br />TO STUDS OR 2X BLKG W/ <br />3/8" x 2-1/2" LAG SCREWS. <br />(TYP OF 2 STRAPS) <br />3/4" <br />2"CWGGAS SOV. <br />UNION. (TYP) <br />3/4" P&T RELIEF. DISCHARGE <br />TO FLOOR SINK. <br />FINISH FLOOR SLAB. <br />BALL VALVE. (TYP) <br />TO FLOOR SINK. <br />GAS TO WATER HEATER. <br />1-1/4" COLD WATER SUPPLY <br />1-1/4" HW SUPPLY <br />CONDENSATE DRAIN NEUTRALIZER KIT. <br />1-1/2" <br />GAS DIRT LEG PER 4/P800. <br />DIAL THERMOMETER (TYP). <br />1'x1'x1' CONCRETE <br />BLOCK. <br />UNISTRUT P1000 W/ <br />PIPE CLAMP, TYP. <br />CALIFORNIA VALVES <br />MODEL #317F 6" <br />FLANGED EARTHQUAKE <br />VALVE. <br />CONCRETE PAD @ METER. <br />BOLT TO CONCRETE BLOCK W/ <br />3/8"x3" MIN. EMBED. CONC. <br />ANCHORS. <br />FROM 6" HEADER AT GAS <br />METER. <br />PLUG VALVE. <br />6" GAS DN. TO BEL. <br />GR. TO BLDGS. <br />N.T.S.CONDENSATE DRAIN CONNECTION 3 <br />N.T.S.GAS DIRT LEG 4 <br />N.T.S.VERTICAL CONCENTRIC VENT 6 <br />N.T.S.GAS VALVE SIGN DETAIL 7 <br />N.T.S.LAVATORY TAILPIECE 8 <br />N.T.S.MUA PIPING CONNECTION 9 <br />N.T.S.INSTANTANEOUS WATER HEATER 10 <br />N.T.S.SEISMIC SHUT-OFF VALVE 11 <br />N.T.S.SHUT-OFF VALVE IN BOX 1 <br />N.T.S.CLEANOUT TO GRADE 2N.T.S.WATER HEATER 5 <br />TT, FRESNO HEADQUARTERS VISALIA l BAKERSFIELD l MODESTO l SAN LUIS OBISPOA R C H I T E C T S E N G I N E E R S C O N N E C T E D ETERLLPETERIIIDRAWING TITLEPROJECT NO. <br />DRAWING DATEDESCRIPTIONMARKproperty rights in thesePLOT DATE:copyright and other reserves its common lawTeter, LLP expresslyinstrument of professionalincorporated herein, as anideas and designsplans. This document, theprior written authorization.any other project withoutin whole or in part, forservice, is not to be usedNOT FORCONSTRUCTION3/13/2019 7:53:42 AMP800-1 PLUMBING DETAILSNEW ELEMENTARY12/18/1818-10744SCHOOLSTOCKTON USD2111 QUAIL LAKES DR., STOCKTON, CA 95207100% CDDCONDENSATE TERMINATION TO Exp. 06-30-20CEEOTTSAM CFLAACHNIAIROFNLAIGERM32797SESTIEVTEERDNA.E E R <br />JNI <br />O <br />GN <br />ESNLEANOIS <br />FESROP
The URL can be used to link to this page
Your browser does not support the video tag.