Laserfiche WebLink
CAPPED TEE <br />CONDENSATE DRAIN. SEE <br />PLAN FOR SIZE AND <br />CONTINUATION. <br />CONDENSATE DRAIN). <br />(SAME SIZE AS <br />STAINLESS STEEL <br />HOSE CLAMPS. <br />NEOPRENE HOSE. <br />FOR CLEANOUT. <br />PLUG FOR DRAW <br />THRU UNITS. <br />EQUIP. <br />MECH. <br />1" MINIMUM <br /> 3" MINIMUM <br />WALL. <br />CONDENSATE DRAIN LINE <br />FROM A/C UNIT. <br />CHROME PLATED <br />EXCUTCHEON. <br />CHROME PLATED <br />COPPER TUBING. <br />FINISH FLOOR. <br />1-1/2" TAILPIECE. <br />TEE CONNECTION. <br />1-1/4" TAILPIECE. <br />LAVATORY OR SINK. <br />COPPER TUBING. <br />NOTE: <br />ALL CLEANOUT BOXES WITHIN 10' OF <br />EACH OTHER SHALL BE LINED UP WITH <br />EACH OTHER AND PARALLEL TO <br />SIDEWALK OR BUILDING WALL. <br />3" <br />FINISH GRADE. <br />CLEANOUT BOX. <br />CLEANOUT PLUG. <br />18"x18"x4" CONCRETE PAD <br />UNPAVED AREA <br />RAISE ABOVE GRADE 1". <br />PAVED AREA <br />VALVE BOX TO BE FLUSH <br />WITH FINISH CONCRETE. <br />SCHEDULE 40 PVC PIPE <br />EXTENSION. <br />PROVIDE MIN. 6" GRAVEL <br />FOR DRAINAGE BASE. <br />PLUGGED WYE AT <br />END OF LINE <br />NIPPLE. <br />CAP. <br />3" MINIMUM. <br />TEE FITTING. <br />SHUT-OFF VALVE. <br />GAS <br />SUPPLY. <br />TO <br />UNIT. <br />UNION. <br />SEE PLAN <br />FOR SIZE. <br /> NOTE: <br />1/8" THICK PLASTIC. <br />3" HIGH BLOCK LETTERS. <br />WHITE ON RED BACK- <br />GROUND. (WEATHER- <br />PROOF <br />PAINT) <br />4) 3/16" MOUNTING <br />HOLES. <br />SIGN TO BE CONSPICUOUSLY LOCATED ABOVE <br />BUILDING GAS SHUT-OFF VALVE ON EXTERIOR WALL. <br />GAS <br />VALVE <br /> 18" <br /> 1" <br /> 3" <br /> 1" <br /> 3" <br /> 1" <br /> 9" <br />NOTE: <br />BASE FOR DRAINAGE. <br />SCHEDULE 40 PVC PIPE <br />PROVIDE MIN. 6" GRAVEL <br />SYSTEM, SEE PLAN FOR <br />SERVICE FROM DISTRIBUTION <br />EXTENSION. <br />VALVE BOX. <br />UNION. <br />SERVICE TO BUILDING <br />WALK OR BUILDING WALL. DO <br />OTHER AND PARALLEL TO SIDE- <br />SHALL BE LINED UP WITH EACH <br />WITHIN 10'-0" OF EACH OTHER <br />ALL SHUT-OFF VALVE BOXES <br />FINISH GRADE. <br />NOT LOCATE IN SIDEWALKS. <br />SEE PLAN FOR TYPE <br />AND SIZE. <br />TYPE AND SIZE. <br />RAISE ABOVE GRADE 1" <br />18"x18"x4" CONCRETE PAD <br />UNPAVED AREA <br />WITH FINISH CONCRETE. <br />VALVE BOX TO BE FLUSH <br />PAVED AREA <br /> 3" <br />D <br />NORMALLY OPEN SOLENOID DRAIN VALVE <br />PROVIDED W/ UNIT, INSTALLED BY PLUMBING <br />CONTRACTOR. <br />FOR ATTACHMENT <br />OF CURB AND <br />PEDESTAL SEE <br />MECHANICAL. <br />MAKE-UP AIR UNIT <br />FANEVAPORATIVE COOLER <br />3/4" WATER. <br />WOODFORD Y24 <br />HOSE BIBB. <br />1" OVERFLOW. <br />NORMALLY CLOSED <br />SOLENOID VALVE. <br />NORMALLY OPEN SOLENOID VALVE. <br />P-TRAP. <br />INSULATE THE <br />WATER LINE UP <br />TO & INCLUDING <br />THE SOLENOID <br />VALVE. <br />1" DRAIN. <br />MANUFACTURE'S CONCENTRIC <br />VENT KIT THROUGH ROOF <br />WITH TALL CONE FLASHING <br />AND COUNTER FLASHING. <br />SHEET METAL SPACER. <br />SUPPORT CONCENTRIC FITTING <br />WITH MANUFACTURER <br />SUPPLIED STRAP. <br />3" POLYPROPYLENE <br />COMBUSTION AIR. <br />3" POLYPROPYLENE VENT. <br />CEILING BUCKET. <br />12" MIN <br />H <br />C C.W. COPPER TUBE INLET. <br />DUAL OUTLET ANGLE VALVE. <br />SINK OR LAV. <br />INSTANTANEOUS WATER <br />HEATER MOUNTED ON BACK <br />WALL OF CABINET OR ON <br />WALL BELOW LAV. <br />IN-LINE FLOW <br />CONTROL. <br />H.W. COPPER TUBING <br />TO <br />SINK FAUCET. <br />10" MIN <br />HOT WATER <br />RETURN <br />3"∅POLYPROPYLENE <br />VENT PIPE UP TO <br />CONCENTRIC VENT ASSEMBLY. <br />3"∅POLYPROPYLENE AIR <br />INTAKE UP TO CONCENTRIC <br />VENT ASSEMBLY. <br />3/4" CONDENSATE DRAIN. <br />BALL VALVE. (TYP) <br />CP-1, CIRCULATING PUMP. <br />CHECK VALVE. (TYP) <br />AQUASTAT. <br />ET-1, THERMAL EXPANSION TANK. <br />16 GA x 2" STRAP AROUND <br />WATER HEATER. ATTACH <br />TO STUDS OR 2X BLKG W/ <br />3/8" x 2-1/2" LAG SCREWS. <br />(TYP OF 2 STRAPS) <br />3/4" <br />2"CWGGAS SOV. <br />UNION. (TYP) <br />3/4" P&T RELIEF. DISCHARGE <br />TO FLOOR SINK. <br />FINISH FLOOR SLAB. <br />BALL VALVE. (TYP) <br />TO FLOOR SINK. <br />GAS TO WATER HEATER. <br />1-1/4" COLD WATER SUPPLY <br />1-1/4" HW SUPPLY <br />CONDENSATE DRAIN NEUTRALIZER KIT. <br />1-1/2" <br />GAS DIRT LEG PER 4/P800. <br />DIAL THERMOMETER (TYP). <br />1'x1'x1' CONCRETE <br />BLOCK. <br />UNISTRUT P1000 W/ <br />PIPE CLAMP, TYP. <br />CALIFORNIA VALVES <br />MODEL #317F 6" <br />FLANGED EARTHQUAKE <br />VALVE. <br />CONCRETE PAD @ METER. <br />BOLT TO CONCRETE BLOCK W/ <br />3/8"x3" MIN. EMBED. CONC. <br />ANCHORS. <br />FROM 6" HEADER AT GAS <br />METER. <br />PLUG VALVE. <br />6" GAS DN. TO BEL. <br />GR. TO BLDGS. <br />N.T.S.CONDENSATE DRAIN CONNECTION 3 <br />N.T.S.GAS DIRT LEG 4 <br />N.T.S.VERTICAL CONCENTRIC VENT 6 <br />N.T.S.GAS VALVE SIGN DETAIL 7 <br />N.T.S.LAVATORY TAILPIECE 8 <br />N.T.S.MUA PIPING CONNECTION 9 <br />N.T.S.INSTANTANEOUS WATER HEATER 10 <br />N.T.S.SEISMIC SHUT-OFF VALVE 11 <br />N.T.S.SHUT-OFF VALVE IN BOX 1 <br />N.T.S.CLEANOUT TO GRADE 2N.T.S.WATER HEATER 5 <br />TT, FRESNO HEADQUARTERS VISALIA l BAKERSFIELD l MODESTO l SAN LUIS OBISPOA R C H I T E C T S E N G I N E E R S C O N N E C T E D ETERLLPETERIIIDRAWING TITLEPROJECT NO. <br />DRAWING DATEDESCRIPTIONMARKproperty rights in thesePLOT DATE:copyright and other reserves its common lawTeter, LLP expresslyinstrument of professionalincorporated herein, as anideas and designsplans. This document, theprior written authorization.any other project withoutin whole or in part, forservice, is not to be usedNOT FORCONSTRUCTION3/13/2019 7:53:42 AMP800-1 PLUMBING DETAILSNEW ELEMENTARY12/18/1818-10744SCHOOLSTOCKTON USD2111 QUAIL LAKES DR., STOCKTON, CA 95207100% CDDCONDENSATE TERMINATION TO Exp. 06-30-20CEEOTTSAM CFLAACHNIAIROFNLAIGERM32797SESTIEVTEERDNA.E E R <br />JNI <br />O <br />GN <br />ESNLEANOIS <br />FESROP