Laserfiche WebLink
1. DO NOT CAULK TRASH RINGS TO COUNTERTOPS2. INSTALL CASEWORK, COUNTERTOPS AND SHELVES AS SHOWN. REFERENCE FINISH SCHEDULE AND MANUFACTURER'S SPECIFICATIONS FOR ADDITIONAL INFORMATION3. ALL COUNTERTOPS UTILIZED FOR CUSTOMER TRANSACTIONS, INCLUDING BAR, CONDIMENT AND SALES COUNTERTOPS SHALL BE INSTALLED AT 2'-10" (860 MM) MAXIMUM A.F.F. 4. (N) FLOOR BASE TO MATCH (E) FLOOR TILE @ ENGINE5. FLOOR SINK BELOW. CASEWORK MANUFACTURER TO COORDINATE DESIGNTO INSURE THIS AREA IS READILY ACCESSIBLE FOR CLEANING AND FREE OF COUNTERTOP SUPPORT6. (N) CBE SHELVES. G.C. TO PROVIDE WALL BLOCKING FOR FASTENERS7. (E) FLOOR SINK LOCATION8. PATCH AND REPAIR FLOOR TILE AS NEEDED @ (N) ESPRESSO STATION9. PATCH AND REPAIR FLOOR TILE AS NEEDED @ (N) FRONT BAR / POS STATION10. (N) METAL BASE @ CAFESTAINLESS STEEL (SST) COUNTERTOPSOLID SURFACE (SS) COUNTERTOPFLOOR TILE TO BE PATCH AND REPAIR(N) TILE BASE TO MATCH (E) TILE FLOOR W/ 3/8" MIN SANITARY COVED BASE(N) METAL BASE - 6" MT002811361BX00402BA. GENERAL CONTRACTOR TO NOTIFY CONSTRUCTION MANAGER IMMEDIATELY IF A DISCREPANCY EXISTS BETWEEN CASEWORK SHOP DRAWINGS, EXITING SITE CONDITIONS, ARCHITECTURAL DRAWINGS OR BUILT FIXTURES. ALL DIMENSIONS SHALL BE FIELD VERIFIED BY GC PRIOR TO SHOP DRAWINGS PRODUCTION.B. STARBUCKS CONSTRUCTION MANAGER TO COORDINATE AND SCHEDULE CASEWORK DELIVERY DATE. GENERAL CONTRACTOR TO CONFIRM CASEWORK DELIVERY DATE WITH CASEWORK MANUFACTURER AT FOUR (4) WEEKS PRIOR AND THEN ONE (1) WEEK PRIOR TO SCHEDULED DATE OF DELIVERY.C. STARBUCKS CONTRACTS DIRECTLY WITH CASEWORK VENDOR TO SUPPLY CASEWORK LISTED IN THE CASEWORK SCHEDULE, UNLESS OTHERWISE NOTED.D. CASEWORK VENDOR TO PROVIDE COMPLETE SHOP DRAWINGS AND INSTALLATION PACKAGE TO GENERAL CONTRACTOR TO FACILITATE PROPERINSTALLATION.E. ALL CASEWORK BOX BASE / TOE KICKS SHALL BE SET AND LEVELED USING 1/4" (6 MM) NON-ABSORBENT PLASTIC SHIMS PROVIDED BY CASEWORK VENDOR.F. SEE INTERIOR FINISH ELEVATIONS AND SCHEDULES FOR LOCATION AND TAGGING OF WALL TREATMENTS BY CV AND OTHERS.H. REFERENCE PLUMBING AND ELECTRICAL PLANS FOR PLACEMENT OF ELECTRICAL, DATA AND PLUMBING ON FRONT AND BACKLINE OF BAR.I. CASEWORK VENDOR TO ENGINEER PROPER COUNTERTOP SUPPORT AT ESPRESSO BAR AND OTHER WORKSTATIONS PER STARBUCKS MINIMUM PERFORMANCE REQUIREMENTS.J. STARBUCKS TO SUPPLY FLOORING AND BASE FOR FRONT AND BACK OF HOUSE AS NOTED IN SCHEDULES. GENERAL CONTRACTOR TO INSTALL. GENERAL CONTRACTOR TO SUPPLY WORKROOM TILE AND BASE AND INSTALL. GENERAL CONTRACTOR TO SUPPLY AND INSTALL MORTAR, ADHESIVE, AND GROUT. GENERAL CONTRACTOR TO INSPECT ALL TILES AND REJECT DAMAGED OR SUBSTANDARD TILES PRIOR TO INSTALLATION.K. ALIGN TILE TRANSITIONS ON WHOLE TILES AS SHOWN.L. ALL FLOOR AND WALL JUNCTIONS IN STORAGE AND FOOD PREPARATION AREAS SHALL HAVE A 6" COVED BASE.C21947C20272C20052CX18853C18859C17744CX18859C21946C18721C17740C17745C17896C17741C17574C17810C17574CX21961C17747C19281C20063CX20062C20067C20066CX20065CX18860CX20064CX00702C1115501CAFE02ENGINE05BOH03ALL-GENDERRESTOOM04ALL-GENDERRESTOOM13C17580C17580C175816(2)C20633C18145(2)2C21191C21189C21190C21190I5010301CAFE02ENGINE05BOH04ALL-GENDERRESTOOM03ALL-GENDERRESTOOMI50107I5010106I50105020459BX00402108B1136147777SHEET NUMBER:SHEET TITLE:SCALE:STORE #:PROJECT #:PROJECT NAME:PROJECT ADDRESS:C 2020 STARBUCKS COFFEE COMPANYRISSUE DATE:2401 UTAH AVENUE SOUTHSEATTLE, WASHINGTON 98134(206) 318-1575THESE DRAWINGS AND THE PROJECT MANUAL ARE CONFIDENTIAL AND SHALL REMAIN THE SOLE PROPERTY OF STARBUCKS CORPORATION, WHICH IS THE OWNER OF THE COPYRIGHT IN THIS WORK. THEY SHALL NOT BE REPRODUCED (IN WHOLE OR IN PART), SHARED WITH THIRD PARTIES OR USED IN ANY MANNER ON OTHER PROJECTS OR EXTENSIONS TO THIS PROJECT WITHOUT THE PRIOR WRITTEN CONSENT OF STARBUCKS CORPORATION. THESE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO EXPRESS DESIGN INTENT FOR A PROTOTYPICAL STARBUCKS STORE (WHICH IS SUBJECT TO CHANGE AT ANYTIME) AND DO NOT REFLECT ACTUAL SITE CONDITIONS. NEITHER PARTY SHALL HAVE ANY OBLIGATION NOR LIABILITY TO THE OTHER (EXCEPT STATED ABOVE) UNTIL A WRITTEN AGREEMENT IS FULLY EXECUTED BY BOTH PARTIES.STARBUCKS TEMPLATE VERSION: i2020-07-27STARBUCKSRSR. DESIGN MANAGER:DESIGN MANAGER:CHECKED BY:I10223871-06802-05-21HIGHWAY 99 & WATERLOO4426 EAST WATERLOO ROADSTOCKTON, CA 95215COUNTY OF SAN JOAQUIN7957JESSICA RAMOSJESSICA RAMOSVALERIOCSWK & FLOORFINISH PLANKEYED NOTESGENERAL NOTESLEGENDSCALE: 1/4" = 1'-0"01CASEWORK PLANSCALE:1/4" = 1'-0"02FLOOR FINISH PLANAS SHOWNRevision ScheduleRev Date By Description01-28-21 JGR FINAL REVIEW SET02-05-21 JGR PERMIT SET123