innnn _
<br /> J
<br /> Q
<br /> U)
<br /> iT
<br /> c STATE OF CALIFORNIA STATE OF CALIFORNIA STATE OF CALIFORNIA STATE OF CALIFORNIA
<br /> Mn
<br /> Mechanical Systems Mechanical Systems Mechanical Systems Mechanical Systems
<br /> NRCC-MCH-E(Ueated 121201 CALIFORNIA ENERGY COMMISSION NRCGMCH-E(Created 121201 CALIFORNIA ENERGY COMMISSION NRCC•MCH-E(Created 121201 CALIFCRNIA ENERGY COMM1551ON NRCGMCH-E(Created 12120) CALIFORNIA ENERGY COMMISSION
<br /> LL_ ICERTIFICATE OF COMPLiANCL NRCC-MCH-£ ICIERTIFKATE OF COMPLIANCE NRCC-MCH-EICOF COMPLIANCE NRCC-MCH-E
<br /> O CERTIFICATE OF COMPLIANCE NRCGMCH-E
<br /> m Tis acumen[is use to emonstrate comp+ante or met anica systems t of are wit in f escape o t e permit app+cation an are emonstrating comp lance using Y e Project Name: Dutch Bros.Coffee Report Page: Page 2 of 10 Project Name: Dutch Bros.Coffee Report Page: Page 3 of 10 Project Name: Dutch Bros.Coffee Report Page: Page 4 of SO
<br /> prescriptive path outlined in 40.4 or?F14I Qfb12 for alterations; Project Address: 1220 Colony Road Date Prepared: 01/i3/202 Project Address: 1224 Colony Road Date Prepared: 03t3 3(2020 1PrnIPctAcdrPss: 1220 Colony Road Date Prepared: 01/13/202
<br /> -p Project Name: Dutch Bros.Coffee lRepart Page: Page i of 1D
<br /> m D.EXCEPTIONAL CONDITIONS Dry System Equipment Efficiency(other than Package Terminal Air Conditioners(PTAQ and Package Terminal Heat Pumps(PTHP)] J.VENTILATION AND INDOOR AIR QUALITY
<br /> U) Project Address: 122D Colony Road Date Prepared: 01/13/2020
<br /> IQ
<br /> a) This table is outofRed with uneditable comments because of selections made or data entered in tables throughout.the form. 01 02 03 04 05 06 07 O8 09 Table instructions:Complete The following Table to demonstrate compliance with mandatory ventilation requirements in 1$ 20.1 and§120.2(e)3B far all nonresidential,high-rise
<br /> .GENERAL INFORMATION W Heatin Mode Cooling Mode residential and hotel/motel occupancies. Far alterations,only ventilations stems being altered within the scope o the permit application need to be documented in this table.
<br /> Heating g P Y Y 4 P f P Ppb
<br /> `0 01 Project Location(city] Ripon 04 otal Conditioned Floor Area 630 Selections made In Table O have been changed by the permit applicant.See Table E.Additional Remarks for permit applicant's explanation. Min Efficiency Min Efficiency In(leu of this table,the required outdoor ventilation rates and airflows may be shown on Medians or the calculations can be presented in a spreadsheet.
<br /> o
<br /> c 02 Climate Zone 12 05 Total Unconditioned Floor or Size Category
<br /> oor Area 0 Ratio Condition Re uired per Design Required per Design 01 Check the box if the project is showing ventilation calculations on the plans,or attaching the calculations instead of completing this table.
<br /> Item Tag [Eta/h) g £ff ciency Unit q p g Efficiency Unit q p g ❑ P J g p g P g
<br /> a 03 10ccupancy Types Within Project: 106 IN of Stories(Habitable Above Grade) i E.ADDITIONAL REMARKS F Tables 110.21 Efficient Tables 110.21 Efficient
<br /> {' J Y Y 42 ❑ Check this box if the project includes new or altered high-rise residential dwelling units.
<br /> -o Office(B) LL Retail(M) ❑Non-refrigerated Warehouse(S) This table includes remarks made by the permitappliconi to the Authority Having Jurisdiction. Title 20 Title 20
<br /> c03 ❑ Check the box if the project is using natural ventilation in any spaces to meet required ventilation rates per§120.1/02.
<br /> Hotel/Motel Guest Rooms(R-1) ❑School(F) ❑Healthcare Facility(H) SEER 13 15.2
<br /> o RTU-1,2 c65,000 80 Nonresidential and Hotel/Motel Ventilation Systems
<br /> m ❑High-Rise Residential(R-2/R-3) ❑Reiocatable Class Bldg(E) ❑Other{Write In): 04 OS O6 07
<br /> FOOTNOTES:Climate zone can be determined on the California Energy Commission's website at ht[p.!/www.eneray.ta.aov/maps/renewphle/building climore zeinLmhtml
<br /> F.HVAC SYSTEM SUMMARY(DRY&WET SYSTEMS) Air Filtration per*120.1(c)and 4141.Oih)22
<br /> System Design OA System Design
<br /> tc B.PROJECT SCOPE Table instructions:Complete the following equipment schedules to show compliance with mandato requirements found in Land 110.1 a and prescriptive requirements
<br /> System Name: RTU-1,2 t 320 0
<br /> A f gP rV' q f 3 (_-J P P 4 G.PUMPS CFM Air Flowl. Transfer Air CFM:
<br /> °? found in 140.4 a 140.4 b and 140.4 k or§141.01b12 ralterutioas. Provided per§141,0(bJ2c(alteration)
<br /> Table Instructions:Include any mechanical systems that are within the scope of the permit application and are demonstrating compliance using the prescriptive path outlined in �� fo This Section Does Not Apply
<br /> ]40.4 or§14].O1b12 for alterations. Dry System Equipment Sizing(includes air conditioners,condensers,heat pumps,VRF,furnaces and unit heaters) 6$ 09 10 11 12 13 14 15 16
<br /> GNICH
<br /> My project consists of(check all that apply) 01 O2 03 04 05 06 07 08 09 10 11 1 FOOTNOTE.,Computerroom economizers must meet requirements of I46.9 a and will be documented on the NRCC-PRC E document. Mechanical Ventilation Required per 4120.1103' Lxh.Vent.per 41Z0.11c14
<br /> s 01 02 03 Equipment Sizing per Mechanical Schedule(Btu/h)§140.4(a&b) 2TheunitusedforHPMustbeconsistentforullfuriswithinasystem. Space Name or ond[tioned of Required Required DCV or Occupant Sensor Controls per /ARCHITECTURE
<br /> Air System Wet System Components D System Components Heating Output',' Cooling Output'.' Load Calculations',' [tem Tag Occupancy Type4 Floor 1owerheads # Min OA Minimum Provided per Design 4120.Ifd13.4120_1fd15& 20 e 36
<br /> � Y () Y p Dry Y P g p g P
<br /> CFM
<br /> Smallest le' Area Ift') toilets people, CFM CFM S T U D I O
<br /> '� Q cleating Air System �Water Economizer 0 Air Economizer Name or Equipment Category per Equipment T a er Total I.SYSTEM CONTROLS i�� I
<br /> m YP P Available' Sensible Supp. Sensible Total H
<br /> o ❑CoolingAir System Pumps Electric Resistance Heat Item Ta Tables 110.2 Tables 110.2&Title 20 Sensible NA:Not required per
<br /> Y ❑ p ❑ g 14§ 0 4[a I Per Rated Heating Per Rated Heating Cooling Table instructions Complete the following Table to demonstrate compliance with mandatory controls in 1§ 1Q.2 and I3 20.2 and prescriptive controls in 140.4 and(�or DCV
<br /> Mechanical Controls ❑Hydronic System Piping ❑/ Fan Systems Design (kBtu/h) Output Design (kBtu/h) Load g requirements in§]41.Oib12Eforuttered space conditioning systems. §12C.1(d)3 AN OREGON LIMITED LIABILITY COMPANY
<br /> U) Load RTU-1,2 Coffee station 630 315
<br /> 2 0 Mechanical Controls ❑Cooling Towers 0 Ductwork (ketu/hJ (ketu/hJ (kBtuJh] (ketu/hJ 01 OZ 03 D4 OS 06 07 DS 09
<br /> (k8tu/hJ _ NA:Continously operated
<br /> Chillers J Ventilation Conditioned Fo-
<br /> _0
<br /> Sensor
<br /> -� ❑ ❑ Thermostats Shut-Off IsviationZone Supply Air Window = per§120.2(e)3exceptfon
<br /> n U nitary AC/ Floor Area Demand Response -
<br /> ❑Boilers ❑Zonal Systems/Terminal Boxes RTU-Z,Z AC,air cooled,package 3 base Yes 112 144 0 52.6 52.6 28.5 47.4 System Name System Zi 1 Controls Controls Tem Reset Interlocks per
<br /> P g { phase) Y Y g §110.2Ib1&[d P�
<br /> � Condensers Being Served 1� 10.12 and 120.2 b
<br /> m (ft') §120.2(al or§141.CM2E 120.2 e 121.2 4140A[f IS 140.41 n 17 ITotal System Required Min DA CFM 315 18 1 Ventilation for this System Complies? I Yes
<br /> aS C.COMPLIANCE RESULTS
<br /> Table Insaructioos:If any cell on this tablesoys"DOES NOT COMPLY"or"COMPLIES with Exceptional Conditions"refer to Table D.for guidance. 1 z Auto NA:Single NA:Single NA:Auto-
<br /> FOOTNOTES Equipment shall be the smallesisixe,within the avafipble options of the desired equipment line,necessary to meet the design heating and coaling loads of the RTU-1,2 single zone s 25,OOD ft Setback Thermostat ➢R Tstat per 4110.12 1001 S E SAN DY BLVD, SUITE 100
<br /> 0 01 02 03 04 05 06 07 08 09 building per 14 -4 . Healthcare facilities are excepted. Tlmeswltch Zane Zone closing doors FOOTNOTES:System CFM should include both mechanical and natural ventilation forihe zone/system.
<br /> System system 2 n r equipment l in ! ! 'Air ffitration requirements apply to the following three system types per§120.11cAA:space conditioning systems utilizing ducts to supply air to occupiable space,suppiy-only
<br /> o Fans 1i is[ammo Practice to show rated output capacity on the ego p enc schedule. Sensible cooling output tames from specificdt on sheet tables. I FOOTNOTES:Gravity as wall heaters gravity floor heaters cavi room heaters non-central electric heaters fireplaces or decorative as appliances,wood staves are not PORTLAND, OR 97214
<br /> t / a Y g 9 1ff gravity f P 9 PP ventilation systems providing outside air to occupiable space;supply side of balanced ventilation systems including heat recovery and energy recovery ventilation systems
<br /> a Summary p Controls Terminal Box Distribution Cooling °If equipment is heating only,leave cooling output and load blank, if equipment Is cooling only,leave heating output and load blank. providing outside air to occupiable space.
<br /> Pumps Economizers Ventilation required to have Setback thermostats.
<br /> w` 110. , AND AND AND 110.2, AND AND Controls AND 1203, AND Towers Authority Having Jurisdiction may ask for load calcufutions used for compliance per 140 4 'NOTES:Controls with a're require a nate in the space below explaining how com liance is achieved. n V. 503.552.9079
<br /> 140.44140.4(c) 120.1 Compliance Results q A A g A Uniform Mechanical Code may have more stringent ventilation requirements;the moststringent code requirement takes precedence.
<br /> 0 110.2, 140 4 120. 140.4 d 140.401 §114.2te12 Table Continued y 4140.4(d). �tff ° Standards Tabies 120.1-A and 120-1-8 F. 503.241.7055
<br /> � 144.4 140.4 f EX:System]:SA Temp Reset:Exempt because zones compliant with •EXCEPTION 1 to 140. See
<br /> in s Far lecture hails with fixed seating,the expected number of occuponts shall be determined in acrordance with the Cailfnmio Building Code. WWW.G N I C H A R C H.C O M
<br /> (See Table F) [See Table GJ (See Table H) {See Table i} (see Table JJ [See Table K) [See Table L] (See Table M}
<br /> Yes AND ANO[. JANDI Yes JANDI Yes JANDI JANDIYes JAND COMPLIES s§120.2ie.) requires systems serving rooms that ore required by 6130.116 to have lighting occupancy sensing controls to also have occupancy sensing zone controls for
<br /> Mandatory Measures Compliance(See Table Q for Details) COMPLIES ventilation. Examples of spaces which require lighting occupancy sensors Include offices 250ft2 or smaller,multipurpose rooms less than 1,WOft2,ciassrooms,conference
<br /> N rooms,restraoms,aisles and open ureus in warehouses,library book stock aisles,corridors,stuirweffs,parking garages,and loading and unloading zones,unless excepted by 01.1 3.21
<br /> m
<br /> rri CA Building Energy Efficiency Standards-2019 Nonresidential Compliance:httoa/www.ener¢V.ca.¢ovltRle2412019standardsl December 2020 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance:httoalwww-ener¢v.ca.¢mltitle2412019standards December 2020 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance:httoalwww.ener¢v.ca.¢mltitle24/2019standards December 2020 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance:httoalwww.ener¢v.ca,¢m/title2412019standards December 2020
<br /> U
<br /> L
<br /> G.
<br /> r` STATE OF CALIFORNIA STATE OF CALIFORNIA STATE OF CALIFORNIA STATE OF CALIFORNIA QpF G`1S`
<br /> Mechanical Systems Mechanical Systems Mechanical Systems Mechanical Systems � ROY
<br /> O NRCC-MCH-E(Created 12120) CALIFORNIA ENERGY COMMISSION NRCGMCH-E(Created 12120) CALIFORNIA ENERGY COMMISSION NRCGMCH-E(Created 121201 CALIFORNIA ENERGY COMM15SION NRCC-MCH-E(Created 12/201 CALIFORNIA ENERGY COMM15SION IS
<br /> FEETIFICATE OF COMPLIANCE NRCC-MCH-E CERTIFICATE OF COMPLIANCE NRCC-MCH-E CERTIFICATE OF COMPLIANCE NRCC-MCH-E CERTIFICATE OF COMPLIANCE NRCC-MCH-E
<br /> rn Project Name: Dutch Bros.Coffee Report Page: Page 5 of i0 Project Name: Dutch Bros.Coffee Report Page: Page 6 of i0 Project Name: Dutch Bros.Coffee Report Page: Page 7 of 10 Project Name: Dutch Eros-Coffee Report Page: Page S of 10 t%] p�►S �17
<br /> o Project Address: 1220 Colony Road Date Prepared: 01.113/202 Project Address: 1220 Coiciny Road Date Prepared: 01/13/2020 Project Address: 1220 Colony Road Date Prepared: 01/13/202 Project Address: 1220 Coiuny Road Date Prepared: 01/13/2020 f7 V►►�+
<br /> 0 131.1 c EXP-610 2 2
<br /> . N.DECLARATION OF REQUIRED CERTIFICATES OF INSTALLATION ® NRCA-MCH-02-A Outdoor Air must be submitted far all newly installed MVAC units. P.DECLARATION OF REQUIRED CERTIFICATES OF VERIFICATION ® k
<br /> o Table Instructions:Selections have been made based on in rmation rovided in revious tables o this document.i an selection needs to be Chan ed, lease ex lain wh in ( Note:MCH02-A can be performed in con junction with MCH-07-A Su ! Fon VFD Acce tante i a licable since testin
<br /> o fo p p f f y g p p y 1 PAY A if AP } g ❑ ❑ Table Instructions:Selections have been made based on information provided in previous tables of this document.if any selection needs to be changed,please explain why in S� CHA►�1
<br /> U Table E.Additional Remarks.These documents must be provided to the building ins ctor durin construction and con befound online at https://www.ener ca. ov/ activities overlap. Table E.Additional Remarks.These documents must be completed b a HERS Rater and provided to the building inspector during construction. The incl documents must be yy.
<br /> ri K.TERMINAL BOX CONTROLS p 9 g f g F y F g F g f q'C OF{,'A�+�
<br /> title24 2019standards 1019 compliance documents Nonresidential Documents NRC( NRCA-MCH-03-A Constant Volume Single Zone HVAC created by a HERS Providers registry,but drafts can be found online at httos://www.eneray.co.aov/title2411019standards/2019 compliance documents/
<br /> m This 5ection goes Not Apply (i ( NOTE.This form does not automatically move to"Yes", If Constant Volume Single Zone HVAC Systems are included in the ❑ ❑ Nonresidential Documents/NRCV
<br /> Field Inspector
<br /> E YES NO Form/Title scope,permit applicant should move this form to"Yes". Field Inspector
<br /> L.DISTRIBUTION(DUCTWORK AND PIPING) Pass Fail C Q NBCA-MCH-04-A Air Distribution Duct Leakage ❑ ❑ YES NO Form/Title
<br /> _ Table Instructions:Complete the following tables to show compliance with mandato a insulation requirements found in 1§ 20.3 and prescriptive requirements found in C0- NRCI-MCH-01-L-Must be submitted for all buildings. Pass Fail
<br /> A f 9 F rVFP q f P F q f g ❑ ❑ (1 NBCA-MCH-05-A Air Economizer ❑ ❑
<br /> 1140401 or duct leakage testing. NRCV-MCH-14-H Duct Leakage Test
<br /> f 1f 9 9 NRCA-MCH-06-A Demand Control Ventilation Systems Acceptance must be submitted for all systems required to employ f C ❑ ❑
<br /> � demand §120.1(r)3)
<br /> NOTE:Must be completed by a HERS Rater
<br /> Duct Leakage Sealing O.DECLARATION OF REQUIRED CERTIFICATES OF ACCEPTANCE ( co controlled ventilation{refer acan vary outiIde ventilation Row rates basedon maintaining inte)or
<br /> ❑ ❑
<br /> The answers to the questions below Duct leakage testing triggered for carbon dioxide(CO2}cvncertratian setpoints. NRCV-MCH-24 Enclosure Air Leakage Worksheet ❑
<br /> o q RTU-1,2 g g gg No Table Instractions:Selections have been mode based on information provided in previous tables of this document. If any selection needs to be changed,please explain why in �' NOTE:Must be cpmpleted by a HERS Rater
<br /> n apply to the followi ng duct system(5]: (hese systems? Table E.Additional Remarks. These documents must be provided to the building inspector during construction and can be found online at httpS://www.enerby,ca. aLD f C NBCA-MCH-07-A Supply Fan Variable Flow Controls ❑ ❑
<br /> 11 No The scope of the project Includes only duct systems serving healthcare facilites. title24/1019standards/1D19 compliance documents/Nonresidential Doruments/NRCA! ( ( NRCA-MCH-08-A Valve Leakage Test ❑ ❑ NRCV-MCN-27 High-rise Residentia[
<br /> CU NOTE:Must be completed by a HERS Rater ❑ ❑
<br /> 12 Yes Duct system provides conditioned air to an occupiable space for a constant volume,single zone,spate-conditioning system. Field Inspector r � NRCA-MCH-09-A Supply Water Temperature Reset Controls [) ❑
<br /> 13 Yes The space conditioning system serves less than 5,000 It'of conditioned Floor area. YES NO Form/Title Pass Fail ( NR NRCA-MCH-IO-A Hydronic System Variable Flow Controls ❑ ❑ NRCV-MCH-32 Local Mechanical Exhaust
<br /> E 14 No The in surface area of the ducts in the Po[Towing locations is mare than 25%of the total surface area of the entire duct system: ( (9 NRCA-MCH-11-A Automatic Demand Shed Controls ❑ ❑ NOTE:Must be completed by a HERS Rater ❑ ❑
<br /> ❑ Outdoors a C NRCA-MCH-12-A FOD for Packaged Direct Expansion Units ❑ 0
<br /> ° In a space directly under a roof that has a U-factor greater than the u-factor of the ceiling,or if the roof does not meet the ( NBCA-MCH-13-A Automatic FDD far Air Handling Units and Zone Terminal Units Acceptance
<br /> ❑ ❑ I
<br /> ❑ requirements of§140.3fallB or If the roof has fixed vents or openings to the outside/unconditioned spaces NRCA-MCH-14-A Distributed Energy Storage DX AC Systems Acceptance Q
<br /> w ❑ In an unconditioned crawlspace C, (4-1 NOTE:This form does not automatically move to"Yes". if Distributed Energy Storage DX AC Systems are included in the scope, ❑ ❑
<br /> o Iti-
<br /> Ll in other unconditioned spaces permit applicant should move this form to"Yes", ^` Q
<br /> 15 No The scope of the project includes extending an existing duct system,which is constructed,insulated or sealed with asbestos. NBCA-MCH-15-A Thermal Energy Storage(TES)System Acceptance N
<br /> w The scope of the project includes an existing duct system that is documented to have been previously sealed as confirmed through field verification and C NOTE:This farm does not automatically move to"Yes". if Chifled Water Storage,ice-on-Coil internal Melt,Ice-on-Cail Externa! O m
<br /> -� 16 Nodiagnostic testing in accordance with procedures in the Reference_Nonresidentia(App_endix NA2. Melt,it,Harvester,Wine,ice-Slurry,Eutectic Salt,Clathrate Hydrote Slurry(CHS),Cryogenic or Encapulated(Ice Ball)Systems El El
<br /> m are included in the scope,permit applicant should move this form to"Yes".
<br /> sc 11 Duct system shall he sealed in accordance with the California Mechattical Code.'
<br /> 0o f ce NRCA-MCH-16-ASuppty Air Temperature Reset Controls ❑ ❑
<br /> C" a NRCA-MCH-17-A Condenser Water Temperature Reset Controls ❑ ❑
<br /> M.COOLING TOWERS r a NRCA-MCN-18 Energy Management Control Systems ❑ ❑ .-
<br /> 0
<br /> C C41, NRCA-MCN-19 Occupancy Sensor Controls ❑ El
<br /> Section Does NotApply
<br /> 0 r NRCA-MCH-20 Multi-family Ventilation ❑ ❑ M
<br /> (6 NRCA-MCH-21 Multi-Family Envelope Leakage ❑ ❑ W
<br /> o (DO �
<br /> O t/)
<br /> c
<br /> L
<br /> U
<br /> L.L
<br /> C_
<br /> CA Building Energy Efficient Standards-2019 Nonresidential Compliance:htto://w .ener y.ca. w/trtie24/2019standards December 2020 CA BuildingEnerg5Efficient Standards-2019 Nonresidential Compliance:httod/w .ener y.ca. wltitle24/2019standards December2020 CA Buildin EnergY Efficient Standards-2019 Nonresidential Compliance:htto:l/w .ener v.ca. mltitle24/2019standards December 2020 CA Building Energy EfficiencyStandards-2019 Nonresidential Compliance:http:i/ .ener y.ca. m/title24/2019standards December 2020
<br /> U o
<br /> m
<br /> U STATE OF CALIFORNIA STATE OF CALIFORNIA
<br /> o Mechanical Systems , Mechanical Systems
<br /> > NRCC-MCH•E[Created 121201 CALIFORNIA ENERGY COMM155ION NRCC-MCH•E{Created 12/201 CALIFORNIA ENERGY COMM155ION
<br /> m CERTIFICATE OF COMPLIANCE NRCC-MCH-E ICERTIFICATE OF COMPLIANCE NRCGMCH-E N
<br /> Project Name: Dutch Bros.Coffee Report Page: Page 9 of 10 IProject Name: Dutch Bros.Coffee IReport Page: Page 10 of 10 n - L10
<br /> cc
<br /> Project Address. 1220 Colony Road jDate Prepared 01/13/2020 JProject Address 1220 Colony Road JDate Prepared 02/13/202 O
<br /> CU
<br /> a) 2m o
<br /> Q.MANDATORY MEASURES DOCUMENTATION LOCATION ® DOCUMENTATION AUTHOR'S DECLARATION STATEMENT ® �Q U
<br /> E 0 Table Instructions:Indicate where mandatary measures are documented in the plan set orconstruction documentation.For any mandatary measures that do not apply, mark 1.1 certify that this Certificate of Compliance documentation is accurate and complete,
<br /> 4- U c� 0 O
<br /> CU the plan sheet or construction document location as"N/A",any active celis that are ieft blank will result in non-compliance in Table C. Ogg 55f Q
<br /> M w 02 Documentation Author Name: Darrell Case ➢ocumentation Author Signature:
<br /> 01 � `r ROY cy 1 V) �. L0 � v)
<br /> = C13Plan sheet or construction document location Company: Case Lngineering,Inc. Signature Date: 01./1312020 J v O m N
<br /> Compliance with Mandatory Measures documented through No Address: 796 Merus Court CEA/HERS Certification Identification(if applicable); c30 12 L O Q
<br /> oMCH Mandatory Measures Nate Blocky
<br /> - City/5tate/Zip: Fenton,MO 63026 Phone: 636-349-1600 * e (Occ a) U
<br /> 03 04 RESPONSIBLE PERSON'S DECLARATION STATEMENT sr��t]FCA v D _+-_o Mandatory Measure Plan sheet or construction document location 1 certify the following under penalty of Perjury,under the laws of the State of Califomia: O U Q V)
<br /> Heating Equipment Efficiency perd110.1 M1.0 Q O
<br /> 1.The information provided on this Certificate of Compliance is true and correct.
<br /> Coaling Equipment Efficiency per14 10.1 M1.0 2.I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified an this Certificate of
<br /> m
<br /> Furnace Standby Lass Control per 110.2 d C N/A Compliance(responsible designer) L.` 1
<br /> Duct Insulation per1§ 20.4 M3.0 3.The energy features and performance specifications,materials,components,and manufactured devices forthe building design or system design identified on this
<br /> Heating HotWater Equipment Efficiency per 14 10.1 N/A Certificate of Compliance conform to the requirements of Title 24,Part 1 and Part(i of the California Code of Regulations.
<br /> 4.The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable
<br /> 0_ Coaling Chilled and Condenser Water Equipment Efficiency per 1§ 10.1 N/A
<br /> ISSUED FOR PERMIT:
<br /> w 2 compliance documents,worksheets,calculations,plans and specifications submitted to the enforcement agency for approval with this building permit application.
<br /> U Open and Closed Circuit Cooling Towers conductivity of flow-based controls per 110.2(e 1 N/A S.I will ensure that a completed signed ca of this Certificate of Compliance shall be made available with the building ermit s Issued for the building,and made available 11 11
<br /> P g copy P g p { ) g 0 1 1 .2021
<br /> .� Open and Closed Circuit Cooling Towers Flow Meter with analog output per 110.2 e 3 N/A to the enforcement agency for all applicable inspections.I understand that a completed signed copy of this Certificate of Compliance is required to be included with the
<br /> a`) c Open and Closed Circuit Cooling Towers Overflow Alarm per 110.2 e 4 N/A documentation the builder provides to the building owner at occupancy.
<br /> a Open and Closed Circuit Cooling Towers Efficient Drift Eliminators per 110.2e 5 NJA Responsible Designer Name: Darrell Case Responsible Designer Signature:
<br /> 'a Pipe Insulation per120.3 b N/A FESS
<br /> Company: Case Engineering,Inc. Date Signed: 01/13/20200 ROY" Y
<br /> 0 t Combustion air shutaff,combustion air fan controls and stack design and controls for 6
<br /> -o boilers per1§ 20.9 N/A Address: 796 Merus Court License: M28-031 e
<br /> fc Heat Pump with Supplementary Electric Resistance Heater Controls per J110.21b N/A City/state/tip: Fenton,MO 63026 Phone: 636-3481500 22
<br /> 0 o The air duct and plenum system is designed per§120.4fa6(fl M1.0,M3.0
<br /> E a Kitchen range hoods shall be rated for sound in accordance with Section 7.2 of ASHRAF `r
<br /> 1q
<br /> `p =362 2 N/A OF CPC
<br /> EV: DATE: DESCRIPTION:
<br /> 0
<br /> ai
<br /> c
<br /> rn
<br /> 0
<br /> Ch
<br /> U
<br /> SHEET NAME:
<br /> 'n $; CA Building Energy Efficiency Standards-2019 Nonresidential Compliance:http://www.energy.ca.goy/title24/2019standards December 2020 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance:htto:l/www.energy.ca.gov/title24/201gstandards December 2020
<br /> � Si
<br /> � w
<br /> 0
<br /> MECHANICAL TITLE 24
<br /> Cn CALCULATIONS
<br /> CU
<br /> CU
<br /> CU
<br /> 1 I SHEET NUMBER:
<br /> C*4SE
<br /> :D i
<br /> 0 11 Engineering Inc. M4 . 0
<br /> 796 Merus Court T 636.349.1600
<br /> St.Louis,MO 63026 F 636.349.1730
<br /> ©2020 DB Franchising USA,LLC
<br />
|