Laserfiche WebLink
0 / <br /> O <br /> co <br /> co <br /> C <br /> to <br /> L <br /> C <br /> m EQ-3 EQ-4 <br /> 0 <br /> T _ <br /> U <br /> P-5 <br /> coT <br /> 'D <br /> C <br /> O <br /> EQ-1 <br /> o <br /> P- <br /> 'D GNICH <br /> L <br /> 0AJ <br /> P-1 ARCHITECTURE <br /> LL <br /> -2 1S T U D 1 0 <br /> U <br /> AN OREGON LIMITED LIABILITY COMPANY <br /> O P_ RTU <br /> it <br /> U 2 <br /> .Q <br /> 0 P-12 <br /> Q EQ-1 9 <br /> 1001 SE SANDY BLVD, SUITE 100 <br /> PORTLAND, OR 97214 <br /> Q P-5 F V. 503.552.9079 <br /> OD <br /> 4 FW — CW. F. 503.241.7055 <br /> CW _j I E031 T- c P-2 32 WWW.GNICHARCH.COM <br /> _ <br /> HW __ <br /> EQ-3 EQ-4 E030 I O� A 01.13.21 <br /> c <br /> -a <br /> Q RTU EQ29 <br /> 1 �n BV. <br /> �— Q�p�E551payj. <br /> P-9-1 <br /> Bo31 <br /> T/L_77 <br /> L I <br /> IT- <br /> U <br /> P-5 n \ _ t3`p CHA�� p <br /> Cli <br /> O P- I I v — ��OF CT 7-77 <br /> A4� <br /> X � J_ I � <br /> U 00 I = I 16 <br /> Z I <br /> � I I <br /> 2 I <br /> Q <br /> m U P-4 I 7 <br /> a I I I = <br /> EQ-1Ei4i <br /> I X — <br /> I <br /> FW - - - - -I— - - - FW- - - � - - - 5 I 0 <br /> �i- <br /> '� -5 -- ---HW -- -- -- -- --HW -- -- -- -- -- 1 O <br /> `� - -- HW--�—T-- -- --�-- --�-- HW--- -- -- -- - I m <br /> 1 _ I Q <br /> - CW—- - - -—CW - - --CW - - - - CW - C-0 <br /> EQ-9 •� i <br /> Q-3 <br /> '—EQ-4 P-5 — P-4 = P-7 P-8 CW ) I P-1 P-6 <br /> EQ+4 J I U O <br /> CW+- I I LL O Q <br /> - - FW EQ-1 O F U I I P-3 O3 _ <br /> a EQ-3 = EQ-8 O <br /> a, 4 C FW P-15 15 <br /> - - - LLa - FW - <br /> m - - — 2 c , 0 <br /> v <br /> ED� z <br /> 10 4 6 13 BP-1 14 i <br /> N <br /> 0 L4-- L0 <br /> PLUMBING KEYED NOTES z 0 Q '0 v °' <br /> � <br /> O `o <br /> "~ U � � 0 0 <br /> O1 ROUTE NEW 1-1/2"WATER PIPING TO CONNECT TO WATER METER AND MAIN. VERIFY EXACT SIZE AND LOCATION IN FIELD. VERIFY WITH r 1 cry <br /> U, WATER COMPANY AND LANDLORD EXACT CONNECTION, DELIVERY PRESSURE AND METER REQUIREMENTS PRIOR TO WORK. WATER �•/ 0 U m <br /> PIPING SIZE BASED ON 60 PSI INCOMING STATIC WATER PRESSURE. PROVIDE PRESSURE REDUCING VALVE IF PRESSURE IS OVER 80m O <br /> -E PSI. CONTACT ENGINEER IMMEDIATELY IF LOW PRESSURE (BELOW 60 PSI)OR DISCREPANCIES ARE FOUND FOR PIPING CHANGES. Q U .� <br /> �, O2 PROVIDE WATTS LF009 BACKFLOW PREVENTER ABOVE MOP SINK. ROUTE RELIEF PIPES TO DISCHARGE INDIRECTLY TO MOP SINK. 0 - O O C: <br /> N Q i O L2 <br /> 1 WATER FLOOR PLAN O WATER FILTRATION SYSTEM TO BE PROVIDED AND INSTALLED BY SELECTED WATER FILTRATION MANUFACTURER. PLUMBING a, 0 N � 4O <br /> a CONTRACTOR TO INSTALL BYPASS PIPING TO WATER FILTRATION SYSTEM. <br /> - P1.0 SCALE: 1/2" = V-0" <br /> O4 DROP 1/2" CW AND 1/2" FW LINES DOWN IN WALL ON WARM SIDE OF INSULATION TO BE RAN UNDER COUNTER TO SERVE FIXTURES. ISSUED FOR PERMIT. <br /> o <br /> OS PROVIDE FULL SIZED BYPASS VALVES FOR THE MAIN CW LINE SERVING THE WATER FILTRATION SYSTEM. 0 I . 13,202 I <br /> OROUTE TO CONNECT TO NEW GAS METER. GAS METER'S NEW DEMAND =628MBH, (FIELD VERIFY ACTUAL LOCATION). APPROXIMATE <br /> a <br /> LENGTH FROM FURTHEST FIXTURE TO METER BANK 60'-0". CONTRACTOR TO VERIFY EXACT LENGTH, AVAILABLE PRESSURE AND <br /> NOTE: INSTALLATION LOCATION IN FIELD. VERIFY WITH GAS COMPANY FOR EXACT CONNECTION AND METER INSTALLATION GUIDELINES AND <br /> w REQUIREMENTS PRIOR TO ANY WORK. <br /> o Q AN APPROVED BACKFLOW PREVENTION DEVICE IS REQUIRED FOR <br /> BEVERAGE MACHINES CONNECTED TO THE WATER SUPPLY PER 2019 O7 PROVIDE CIRCULATING PUMP. SEE PLUMBING FIXTURE SCHEDULE ON DRAWING P1.0 FOR ADDITIONAL INFORMATION. EV: DATE: DESCRIPTION: <br /> a <br /> = CPC. <br /> CD <br /> O8 NOT USED. <br /> TANK-LESS WATER HEATERS SHALL BE NATIONALLY LISTED AND BE <br /> INSTALLED IN ACCORDANCE WITH THE INSTALLATION INSTRUCTIONS O COLD WATER DOWN FROM TRAP PRIMER TO FLOOR DRAIN. SEE DETAIL ON DRAWING P3.0 FOR MORE INFORMATION. <br /> �_ THAT WERE APPROVED AS PART OF THEIR LISTING. THE GAS PIPING <br /> SERVING THIS APPLIANCE MUST BE SIZED IN COMPLIANCE WITH THE <br /> a 10 PIPING TO BE RAN LOW IN WALL BELOW WINDOW. <br /> WATER HEATER'S LISTED INSTALLATION INSTRUCTIONS PER 2019 CPC. <br /> a 1 1 NOT USED. <br /> STUB-OUTS FOR COFFEE EQUIPMENT AT TABLE SHALL BE 24"A.F.F. SHEET NAME: <br /> o <br /> 12 ROUTE EXPOSED COLD WATER PIPING DOWN TO COUNTER AND TO RAPID RINSE. <br /> 13 PROVIDE EARTHQUAKE-ACTUATED GAS SHUT OFF VALVES, AT GAS METER ON SUPPLY TO BUILDING, INSTALL PER MANUFACTURER'S PLUMBING SUPPLY <br /> RECOMMENDATIONS. FLOOR PLAN AND <br /> 14 INSTALL BOOSTER PUMP SYSTEM ON PLATFORM ABOVE MOP SINK. INSTALL PER MANUFACTURERS GUIDELINES, PROVIDE WITH ALL DETAILS <br /> NECESSARY VALVES AND ACCESSORIES FOR A COMPLETE SYSTEM. COORDINATE EXACT INSTALLATION OF ALL SYSTEM COMPONENTS <br /> c° IN FIELD PRIOR TO ANY WORK AS DRAWING IS SHOWN DIAGRAMMATICALLY ONLY. <br /> CIO <br /> m 15 <br /> SHEET NUMBER: <br /> 1/2" COLD WATER DOWN TO FREEZE PROOF WALL HYDRANT. <br /> o 16 1/2" COLD WATER LINE TO YARD HYDRANT. VERIFY LOCATION IN FIELD. <br /> Engineering Inc• P3 . 0E <br /> ID 796 Merus Court I T 636.349.1600 <br /> St.Louis,MO 63026 F 636.349.1730 <br /> 02020 DB Franchising USA,LLC <br />