My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KELSO
>
18045
>
2231-2238 – Tiered Permitting Program
>
PR0527107
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2021 12:40:49 PM
Creation date
10/5/2021 12:31:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0527107
PE
1862
FACILITY_ID
FA0014401
FACILITY_NAME
MOUNTAIN HOUSE CSD WATER TREATMENT
STREET_NUMBER
18045
Direction
S
STREET_NAME
KELSO
STREET_TYPE
RD
City
BYRON
Zip
94514
APN
25802029
CURRENT_STATUS
01
SITE_LOCATION
18045 S KELSO RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S A J O A Q U I N Environmental Health Department <br /> COUNTY <br /> CA Accidental Release Prevention Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> MOUNTAIN HOUSE CSD WATER TREATMENT 1 18045 S KELSO RD, BYRON September 29, 2021 <br /> Risk Management Plan(RMP)Components and Submission <br /> 312 CCR 2745.10(a) Failed to review,update and submit the RMP to USEPA and the EHD according to specified timeframes ❑V ❑R ❑COS <br /> 313 CCR 2745.10(b) Failed to review,update and submit the RMP to the EHD according to specified timeframes ■V ❑R ❑COS <br /> 314 CCR 2745.10(c) Failed to submit a de-registration to USEPA and the EHD within six months of being nonregulated ❑V ❑R ❑COS <br /> 315 CCR 2745.10(d) Failed to submit a de-registration to the EHD within six months of being nonregulated ❑V ❑R ❑COS <br /> 316 CCR 2745.10(f) Failed to contact the EHD within 30 days of a change of owner or operator to update the registration ❑V ❑R ❑COS <br /> 317 CCR 2745.10.5(a) Failed to submit a correction to the RMP within six months of an accidential release to EHD ❑V ❑R ❑COS <br /> 318 CCR 2745.10.5(b) Failed to submit a correction to the RMP for emergency contact information within one month to EHD ❑V ❑R ❑COS <br /> 319 CCR 2745.11(a)(1) Failed to notify the EHD in writing five calendar days before making any modification ❑V ❑R ❑COS <br /> 320 CCR 2745.11(a)(2) Failed to establish procedures to manage a proposed modification and notify the EHD ❑V ❑R ❑COS <br /> 321 CCR 2745.12 Failed to meet all of the requirements before obtaining a certificate of occupancy ❑V ❑R ❑COS <br /> 322 HSC 25536(b) Failed to submit an RMP after notice by the EHD ❑V ❑R ❑COS <br /> 323 CCR 2745.11(b) Failed to revise required documents within 60 days of a stationary source modification ❑V ❑R ❑COS <br /> Hazard Assessment <br /> 401 CCR 2750.1 Failed to prepare a worst-case release scenario analysis ❑V ❑R ❑COS <br /> 402 CCR 2750.1 Failed to complete a five-year accident history ❑V ❑R ❑COS <br /> 403 CCR 2750.1 A Program 2 or 3 facility failed to comply with all sections of the hazard assessment ❑V ❑R ❑COS <br /> Program 2 Prevention Program <br /> Safety Information <br /> 501 CCR 2755.1(a) Failed to compile and maintain current safety information for a process ❑V ❑R ❑COS <br /> 502 CCR 2755.1(b) Failed to ensure that a process is designed using good practices and/or demonstrate compliance ❑V ❑R ❑COS <br /> 503 CCR 2755.1(c) Failed to update the safety information ❑V ❑R ❑COS <br /> 504 CCR 2755.2(a) 7Failed <br /> o conduct a HR which completely identifies all of the requirements ❑V ❑R ❑COS <br /> 505 CCR 2755.2(b) o consult with the EHD for which methodology is best suited for the HR ❑V ❑R ❑COS <br /> 506 CCR 2755.2(c) o inspect all process equipment for compliance with applicable standards or rules ❑V ❑R ❑COS <br /> 507 CCR 2755.2(c) Failed to perform HR using a team familiar with process operations/employee experienced with process ❑V ❑R ❑COS <br /> 508 CCR 2755.2(d) Failed to include the consideration of applicable external and seismic events into the HR ❑V ❑R ❑COS <br /> 509 CCR 2755.2(e) Failed to document the results of the HR and/or ensure that problems identified were resolved ■V ❑R ❑COS <br /> 510 CCR 2755.2(f) Failed to update and revalidate the HR at least once every five years ■V ❑R ❑COS <br /> 511 CCR 2755.2(f) Failed to conduct a HR whenever a major change in the process occurs ❑V ❑R ❑COS <br /> 512 CCR 2755.2(f) Failed to resolve all issues identified in the HR before startup of the changed process ❑V ❑R ❑COS <br /> 513 CCR 2755.2(g) Failed to revalidate only once between full HRs ❑V ❑R ❑COS <br /> 514 CCR 2755.2(h) Failed to retain all required HR documentation for the life of each process ❑V ❑R ❑COS <br /> FA0014401 PR0527107 SCO01 09/29/2021 <br /> EHD 19-02 Rev.9/16/2020 Page 2 of 11 CA Accidental Release Prevention Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.